19 KiB
Audit Remediation Discussion
Purpose And Status
This document consolidates the review recommendations for the audit catalog into an ordered discussion for maintainers. The catalog owns the finding inventory and prioritization; its linked audit reports own detailed evidence and qualifications. This document owns the open choices and subsequent discussion decisions, not another audit or a completed implementation plan.
Prepared on 2026-11-24 against catalog revision
5a0650250686353cf34fbbbf0e780b04f60e70c1. Each item distinguishes accepted
decisions from proposals still under discussion. Acceptance selects the intended
design; implementation remains pending unless explicitly recorded otherwise.
The review supports the existing typed pipeline and native-kit architecture. The strongest opportunities are removing repeated interpretation, unnecessary work, and retained state. No replacement workflow, retry, configuration, or resource-management framework is indicated. Smaller files and more helpers are useful only when they make ownership and callers clearer.
Work through Items 1–10 in order. Items 1–3 contain explicit behavior choices; Items 4–8 principally need bounded implementation analysis. Items 9–10 settle scope and sequencing. This discussion order is not a mandatory implementation order, and unresolved choices need not delay independent fixes.
1. Diagnostic Capacity And Pipeline Success
Findings: CAT-009; related CAT-008 and CAT-022. Status: Accepted; implementation pending.
CAT-009 identifies a real loss of aggregation errors and available diagnostics. Its suggested remediation also preserves the existing policy that exceeding the warning-group bound can fail an otherwise successful pipeline. These are separate issues: fixing error loss does not require endorsing that policy indefinitely.
Accepted decisions:
- Diagnostic volume alone does not fail a pipeline. Artifact acceptance continues to follow the configured validation and strict/permissive decisions.
- Retain every distinct diagnostic group. Remove the local producer group-count cap and both final warning/non-warning group-count caps. Remove collection-level truncation and omission bookkeeping used solely to enforce those caps; do not replace them with configurable limits.
- Retain grouping, occurrence counts, and representative sampling within each group, initially keeping the existing three-example behavior and omitted-sample counts. Distinct-group retention does not require storing every occurrence.
- Preserve diagnostics from completed operations when later execution fails, independently of lane continuation. Incomplete lanes remain ineligible for artifact publication.
- Preserve genuine diagnostic-contract, arithmetic-overflow, reporting, and requested-capture failures. When finalization fails, retain the primary and finalization causes alongside available valid diagnostics. The error can explain incompleteness; no new report schema or durable sidecar is needed.
- Keep the small completion report, fallback disclosure, and native CommandKit presentation unchanged.
This removes capacity-driven acceptance policy and collection-overflow paths while preserving useful summaries. Memory grows with distinct groups; grouping and representative samples still prevent repeated occurrences from requiring one retained message each. No exhaustive diagnostic ledger is introduced.
Removing group caps eliminates the ordinary capacity-overflow case in CAT-009, but genuine finalization failures must still retain their causes and available diagnostics. CAT-008's completed-work diagnostic loss remains a separate fix.
Existing bounded aggregation is retained by ADR-0015 and ADR-0024. Reconcile this accepted change with those architectural decisions and canonical documentation during implementation, preserving accepted ADR bodies.
Decision: Accepted as above. No open policy choices remain in this item.
2. Convenient Debug Evidence And Repeated Full-Source Capture
Findings: CAT-024; distinguish the independent CAT-003 fix. Status: Accepted; implementation pending.
Repeating a full source for every chunk and lane has a credible capacity cost, including on cache hits. Self-contained operation evidence also serves the deliberate convenience goal recorded in ADR-0024.
Choose the most convenient representation, not automatically the most concise, complete, or deduplicated one. Share whole-source material while keeping operation-specific evidence directly readable.
Accepted decisions:
- Capture the original input and complete parsed source once per run. Operation inputs clearly reference that shared material through logical bundle paths.
- Keep the particular chunk, operation selection, selected reference contents, and incoming artifacts directly in operation evidence initially.
- Preserve convenient native representations of prepared messages, responses, and exchanges, including useful duplication. Reading the actual prepared request must not require reconstructing it from fragments.
- Accept bundle-level completeness for whole-source context. Copying the complete bundle preserves that context; an isolated operation directory need not be independently portable with the entire transcript.
- Write shared source material through the same capture destination that receives
operation evidence. Explicit
EvidenceWriterconsumers receive both the shared records and operation records, without assuming a CLI filesystem root or files written to another sink. References use logical paths, not a requirement for filesystem symlinks or a reconstruction tool. - Limit sharing to whole-source material for this remediation. Do not introduce general content deduplication, additional identities, or configurable capture modes. Reconsider other repeated material only when concrete usage warrants it.
Preserve actual inputs and available native evidence, secret-aware omissions, and requested-capture failure behavior. No silent truncation, quotas, automatic deletion, or new scrubbing machinery is proposed. CAT-003 can independently guard expensive evidence construction when capture is disabled without changing any enabled-capture representation.
Reconcile the selected representation with ADR-0024 and current operation-input tests during implementation; private debug filenames remain implementation details.
Decision: Accepted as above. No open representation choices remain in this item.
3. Process Signals And Cooperative Cancellation
Finding: CAT-010. Status: Accepted; implementation pending.
Accepted decisions:
- The first SIGINT or SIGTERM requests cooperative cancellation through the existing invocation context, allowing dispatch to stop, native requests to cancel, started jobs to drain, and ordinary failure/capture finalization to run.
- A subsequent signal permits ordinary process termination rather than being swallowed while cleanup proceeds. That signal may interrupt finalization; a completed debug bundle is not guaranteed after forced termination.
- Introduce no application shutdown deadline or timeout configuration. Operators and supervisors retain control over forced termination.
- Install signal handling only at the executable boundary. Embedded callers retain context ownership; application invocation does not install process-wide signal handlers on their behalf.
- Cancellation remains cancellation: no permissive fallback, model retry, or successful completion claim. Retain existing cache entries, published files, and available debug evidence under the existing lifecycle rules.
Implement a small standard-library signal adapter around the existing invocation. A focused subprocess test with a local fake backend should verify cancellation and available terminal capture evidence. No new shutdown subsystem, SIGKILL handling, or guarantees for collaborators that ignore cancellation are introduced.
Decision: Accepted as above. No open behavior choices remain in this item.
4. One Owner For Pipeline Interpretation And Pure Copying
Findings: CAT-014, CAT-017, CAT-018; coordinate CAT-012 where files overlap. Status: Open technical design review.
These are high-value consolidations. Sketch small shared operations for structural layout, selected-target inventory, and pure copying of pipeline-owned values. Keep full compatibility resolution distinct from inventory: CLI reference selection must work before its bindings satisfy required references.
Before implementation:
- Identify the reusable layout and selection results and their callers. Keep raw ConfigKit presence/provenance checks and CLI grammar/precedence with their owners.
- Inventory supported mutable option representations. Preserve established omission, explicit-empty, and explicit-zero behavior and detached ownership.
- Separate identifier trimming/defaulting from copying; copying must not silently change the configuration being inspected.
- Decompose resolution around these owners rather than organizing three cleaner copies of the same interpretation.
A short API sketch and representative callers should be sufficient. No new configuration framework, general intermediate representation, arbitrary reflection copier, or package split is presumed necessary. The generated-key correctness fix does not depend on completing this broader consolidation.
Decision: Pending.
5. Producer State And Shared Reconciliation Lifecycle
Findings: CAT-015 and CAT-016; coordinate CAT-007. Status: Open technical design review.
Make delivered-candidate state, invalidation, assessment, and terminal disposition explicit. Small private phase results may make the producer clearer than coupled mutable closure variables. Keep native execution, continuation history, structural repair, and admission with PromptKit.
For NPC, item, and location normalization, share only the demonstrated common reconciliation lifecycle. Families retain preprocessing, identity, typed proposal application, fallback validity, prompts, and diagnostic meaning. Every proposal continues to apply afresh to fixed originals.
Before committing to a helper, show how a representative family caller becomes easier to follow. Avoid replacing readable procedures with an elaborate callback framework. Verify final-turn assessment, candidate invalidation, cancellation, capture errors, cache hits, and strict/permissive outcomes through existing behavioral boundaries.
CAT-007 is a narrower correction: retain native failed-validation details and distinguish a completed failed content check from an operational native error. A small shared usability check should suffice. Preserve producer disposition and validator unavailability as distinct caller outcomes. Correct the misleading test oracle without introducing another validation protocol or extending repair budgets. That fix need not wait for the broader producer refactor.
Decision: Pending.
6. Finalization, Completed Diagnostics, And Intermediate Lifetimes
Findings: CAT-006, CAT-008, CAT-009, CAT-022; coordinate CAT-023 at the CLI boundary. Status: Open technical design review; apply Item 1's accepted diagnostic policy.
Design diagnostic collection and lifetime reduction together. Completed work's diagnostics must survive a later failure before its intermediate values are released. Diagnostic availability must not depend on whether an incomplete lane became eligible for continuation or publication.
Prefer one clear finalization boundary and, where practical, separate private execution accumulators from the returned public result. This may be simpler than clearing a growing list of fields at many exits. Release owner references after their last consumers; do not clear shared backing storage or discard information still needed for handoffs, evidence, or encoding.
Preserve stable diagnostic order without double counting, primary and relevant finalization causes, and existing cancellation precedence. Do not repeat failed aggregation. Keep incomplete-lane artifacts ineligible for publication.
The runner and CLI have different lifecycle responsibilities. Simplify each locally: runner phase control and logical results; CLI configuration, capture, physical publication, and terminal presentation. Preserve distinct execution, publication, and report-delivery outcomes without a new command framework or result envelope. Related defects remain independently testable even when their implementation shares a finalization path.
Decision: Pending.
7. Shared Domain Rules And Exact-Duplicate Bookkeeping
Findings: CAT-020 and CAT-021; coordinate CAT-019 where normalization changes overlap. Status: Open technical scope review.
Share genuinely identical rules and mechanics, with domain behavior remaining family-owned. For scenes, separate reusable pure predicates from selectable validator assessment and corrective prose. Codec acceptance and optional shape validation differ; sharing the whole validator would strengthen the codec contract.
For exact duplicates, start with the families whose bookkeeping demonstrably matches. Keep eligibility, identity keys, ordering, cloning, and diagnostics local. Item occurrences' bucket-plus-equality check must remain intact; keeping that variant separate is preferable to weakening equality or complicating all callers.
Review representative callers and independent expected outputs before expanding the shared surface. No universal normalizer or repository-wide movement of every shape check is proposed. CAT-019's invariant sort-key preparation can proceed locally while preserving tie and invalid-reference ordering.
Decision: Pending.
8. Extension And Capture Concurrency Obligations
Finding: CAT-025. Status: Proposed documentation clarification; optional support choice remains open.
Document the actual shared-instance, immutable-source, callback, and operation lifetime model in canonical internals and interface comments. Current default implementations were not found to race; this is clarity for extension authors and direct framework consumers.
The recommendation is to state existing caller-side concurrency obligations for explicit capture writers and point to the safe recorder. Supporting serial-only writers would be a separate choice. If needed, serialization must wrap the shared writer at the appropriate lifetime; separate operation mutexes do not serialize one shared sink. No general addition of locks or serialization of extraction is proposed. Upstream-owned callback/client rules should remain linked upstream.
Decision: Pending.
9. Cleanup Scope And Optional Improvements
Findings: CAT-026 through CAT-033. Status: Proposed scope; confirm before treating every entry as required work.
- Remove the confirmed private dead helpers and obsolete policy labels (CAT-030/CAT-031), preserving live identity bytes and behavior. No new tests of declaration counts or absence are needed.
- Give the six exported
NormalizationPolicyaliases a short intended-use check. They reside underinternal/; capitalization alone does not establish a supported external API. Do not turn unused internal metadata removal into a broad compatibility project, or recreate cache fingerprints to give it a use. - Remove incidental prompt-prose/run-ID assertions, use controlled scheduling in concurrency tests, and separate order-dependent example fixtures (CAT-026–CAT-029). Preserve genuine schema, routing, ownership, worker-limit, and maintained-example contracts. Do not replace fragile assertions with snapshots or add tests for every private helper.
- Treat native-capture package extraction (CAT-032) as optional. Proceed only if a small direct API improves ownership and callers; a package move alone is not a demonstrated behavior improvement.
- Treat a KMP token matcher (CAT-033) as optional. Ordinary short entity names make the current matcher effectively linear. Assess representative workloads before paying additional algorithm maintenance cost; no benchmark gate or name-length restriction is proposed.
Deferral or declining a refactoring opportunity can be a valid outcome. Closing every catalog entry through code changes is not itself the goal.
Decision: Pending.
10. Remediation Sequence And Verification
Scope: Incorporate the preceding decisions into a focused implementation plan. Status: Proposed sequence, not implementation authorization or new release gates.
Recommended approach:
- Fix narrow correctness defects with focused regressions: CAT-001/CAT-002, CAT-011–CAT-013, and native classification/test-oracle handling in CAT-007. Preserve supported inputs rather than imposing new restrictions. Reproduce static counterexamples at their real boundaries when implementing the fixes.
- Prioritize ordinary-run costs in CAT-003–CAT-005 alongside failure visibility in CAT-008/CAT-009. Keep disabled capture cheap, avoid full-document scans for sparse citations, and share one immutable source index at the appropriate run/source lifetime. Preserve standalone use and current-source cache checks; no process-global cache or new cache-key dimensions are needed.
- Add signal cancellation after Item 3, then undertake coherent ownership work in the composition/copying, producer/reconciliation, and finalization clusters. Shorten intermediate lifetimes only after their remaining consumers are clear. Keep correctness changes distinguishable from broader readability refactors.
- Apply local sort-key improvements and useful domain sharing. Fold confirmed dead-code and test cleanup into focused work where convenient. Reassess the optional package and token-matcher changes last.
This is an ordering guide, not a serial dependency chain. Cheap independent fixes can proceed without waiting for broader discussion. Practical reachability and maintenance benefit matter alongside severity; exotic boundary cases can be easy to correct without displacing ordinary-run improvements.
Use focused behavioral regressions and existing independent family/boundary tests. Run broader offline checks and relevant race tests according to testing policy when shared behavior changes. Do not duplicate the upstream libraries' test suites or turn audit coverage/complexity metrics into new targets. Source analysis establishes avoidable work, but measured end-to-end speedups should be claimed only if measured.
Update canonical behavior documentation when implementation lands. Record any significant changed architectural decision without rewriting accepted ADR bodies. Keep the catalog's evidence and qualifications linked rather than duplicating all ten reports in an implementation plan. CAT-034 is already resolved and requires no further remediation.
Decision: Pending.