Plan the core and integration API migration
This commit is contained in:
@@ -10,6 +10,10 @@ This roadmap is the next implementation priority, before the remaining
|
||||
into an integration-author API initiative, rather than a private-helper cleanup.
|
||||
The document is a plan; this pass changes no application code.
|
||||
|
||||
[Implementation Plan](implementation.md) owns the ordered implementation stages
|
||||
and stage-specific validation. This document owns scope, target behavior, and
|
||||
the accepted design decisions.
|
||||
|
||||
The selected goals are:
|
||||
|
||||
1. Make the boundary between Notarius core and integrations clear and well defined.
|
||||
@@ -250,96 +254,29 @@ existing connections where necessary. Native LLM validators retain their one-sho
|
||||
assessment role; sharing usability/evidence support does not enroll them in the
|
||||
producer correction lifecycle.
|
||||
|
||||
## Work From The Baseline
|
||||
## Required Change Surface
|
||||
|
||||
### 1. Define And Exercise The Author-Facing Contract
|
||||
|
||||
- Inventory production and programmatic callers of the current producer/outcome
|
||||
helpers, typed operation requests/results, registration, and preparation.
|
||||
- Turn the accepted operation, evaluation-result, and correction-request designs
|
||||
into concrete API sketches for spell extraction, registry normalization, and a
|
||||
no-model branch. Include scene-plan interpretation that requests correction
|
||||
before a candidate can be materialized.
|
||||
- Exercise those same designs with email and NWS Forecast Discussion processing
|
||||
sketches. Check source/chunk inputs, domain metadata, result interpretation,
|
||||
correction guidance, and optional reconciliation for D&D assumptions before
|
||||
finalizing Go signatures. Keep format-specific decisions with the future integrations.
|
||||
- Specify which inputs are operation-owned or borrowed, which implementations
|
||||
are reused concurrently, and the lifetime of optional evidence hooks. Document
|
||||
actual behavior without promising arbitrary collaborator thread safety or
|
||||
prohibiting reasonable per-operation state.
|
||||
- Show how ordinary use avoids exposed assessor/cache replacement and terminal
|
||||
helper selection. Identify which existing types can be reused and which should
|
||||
become private or be replaced. Exact helper names/files are implementation choices.
|
||||
|
||||
This is an implementation design step, not a separate approval ceremony or a
|
||||
requirement to create a large specification before trying representative callers.
|
||||
|
||||
### 2. Establish Core-Owned Execution
|
||||
|
||||
- Implement core invocation of integration preparation and consumption of the
|
||||
returned typed operation. Adapt stage interfaces, registration/preparation, and
|
||||
runner completion where necessary, retaining the same core entry point for
|
||||
direct programmatic callers.
|
||||
- Implement explicit candidate evaluation results and replace parallel mutable
|
||||
candidate-associated state. Add the native correction convenience path and
|
||||
custom request builder on one shared request/execution mechanism.
|
||||
- Make deterministic completion, native execution, correctable interpretation,
|
||||
assessment, preparation dispositions, and supported fallback explicit paths
|
||||
owned by core. Separate candidate state from pending native capture state.
|
||||
- Keep existing cache, assessment, capture, and terminal helpers internally where
|
||||
they remain useful; replace their author-facing choreography, not merely names.
|
||||
- Integrate CAT-007's usability/detail correction and focused regressions.
|
||||
- Migrate one extractor and a no-model path end to end, including registration,
|
||||
capture, reuse, assessment, and final typed results. Private transitional adapters
|
||||
may help keep changes reviewable, but are not the completed authoring API.
|
||||
|
||||
### 3. Consolidate Reconciliation And Migrate Producers
|
||||
|
||||
- Build the shared reconciliation facility on the selected operation boundary.
|
||||
Move no-model/limit handling, current-proposal state, and common evidence/result
|
||||
assembly out of the three family procedures.
|
||||
- Migrate NPC, item, and location normalizers, retaining independent family
|
||||
expectations for identity, application, omissions, and fallback semantics.
|
||||
- Migrate all affected extractors and scene planning. Exercise combat-gated
|
||||
no-model branches and chunk-plan materialization/assessment/cache behavior.
|
||||
- Adapt deterministic stage completion as needed while preserving its ordinary
|
||||
one-production/assessment path. Do not force deterministic modules to declare
|
||||
model requests or reconciliation policies.
|
||||
- Keep one-shot model validation native, sharing the corrected usability boundary
|
||||
and any necessary evidence support without a new semantic retry mechanism.
|
||||
|
||||
### 4. Remove Superseded Plumbing And Teach The API
|
||||
|
||||
- Remove unused author-facing lifecycle fields, wrappers, and duplicate family
|
||||
state once callers have moved. Do not leave two competing supported authoring
|
||||
recipes simply to preserve the old internal arrangement.
|
||||
- Update [Module Internals](../internal/modules.md),
|
||||
[Pipeline Internals](../internal/pipeline.md), and
|
||||
[D&D Internals](../internal/dnd.md) alongside implementation. Update architecture
|
||||
ownership and record significant changed decisions through the existing ADR
|
||||
process, preserving accepted ADR bodies.
|
||||
- Supply one minimal working integration example and point to a richer registry
|
||||
example. Explain required/optional capabilities, no-model completion, domain
|
||||
guidance versus operational errors, fallback, concurrency, and evidence ownership.
|
||||
Prefer a small domain-neutral fixture for the introductory example, with D&D
|
||||
as the richer example, so learning the API does not require learning scene or
|
||||
registry semantics. No new demo application is needed.
|
||||
- Verify that the example can be understood without reading the core producer.
|
||||
Test actual registration/execution of the example where useful; do not add a
|
||||
subjective readability gate or a required external-author study.
|
||||
|
||||
### 5. Verify And Reassess The Audit
|
||||
|
||||
- Finish the relevant behavioral verification below and review remaining callers
|
||||
for old lifecycle composition that was merely relocated into integrations.
|
||||
- Reassess overlapping catalog entries against the resulting implementation.
|
||||
Record resolved, partially addressed, and remaining work with concrete evidence.
|
||||
- Resume the remaining audit remediation using that revised catalog. Completion
|
||||
of this roadmap does not require completing unrelated catalog work first.
|
||||
|
||||
These are coherent work units, not required release boundaries. Keep each unit
|
||||
reviewable and preserve working behavior during migration.
|
||||
- Author-facing typed stage contracts, registration, and core execution reflect
|
||||
preparation followed by core-owned production. The same executor serves
|
||||
registered and standalone callers. Deterministic work and preparation-limit
|
||||
dispositions have explicit paths without synthetic model requests.
|
||||
- Candidate evaluation, correction request construction, assessment, cache use,
|
||||
and evidence have clear owners. Candidate-associated information is replaced
|
||||
as one evaluation; native capture state is independent. Existing internal
|
||||
helpers may remain where useful, without requiring integrations to compose them.
|
||||
- Shared reconciliation connects existing neutral preparation, safety, and typed
|
||||
application mechanisms to the same lifecycle. The three registry families
|
||||
retain policy and diagnostics rather than duplicated coordination.
|
||||
- Affected extraction, scene planning, normalization, deterministic completion,
|
||||
and programmatic callers use the selected boundary. One-shot validators share
|
||||
native usability handling without acquiring a producer correction loop.
|
||||
- Module, pipeline, and D&D authoring guides describe the implemented API and
|
||||
its ownership and concurrency expectations. One minimal domain-neutral working
|
||||
example introduces the API; an existing registry provides the richer example.
|
||||
Architecture policy and significant ADR decisions reflect the resulting
|
||||
ownership while preserving accepted ADR bodies.
|
||||
- Superseded authoring plumbing is removed, and overlapping audit findings have
|
||||
evidence-based statuses. Unrelated audit remediation remains separate work.
|
||||
|
||||
## Verification And Completion Evidence
|
||||
|
||||
@@ -384,12 +321,12 @@ family tests. Simplify tests coupled to retired plumbing; do not derive expected
|
||||
domain outputs from the same helper under test. This is a coverage guide, not a
|
||||
new test for every row or an exhaustive cross-product requirement.
|
||||
|
||||
Run focused checks while iterating, then the repository's offline full tests,
|
||||
vet, and build for the shared-contract migration, with focused race checks for
|
||||
changed concurrency paths. Follow [Testing Policy](../policy/testing.md) and
|
||||
[Development](../development.md#validation). No paid inference, benchmark target,
|
||||
coverage percentage, or new release gate is required. This planning pass has not
|
||||
run those implementation checks.
|
||||
The [Implementation Plan](implementation.md) assigns focused and final checks
|
||||
under [Testing Policy](../policy/testing.md) and
|
||||
[Development](../development.md#validation). Completion evidence includes offline
|
||||
full tests, vet, build, and focused race checks for changed concurrency paths.
|
||||
No paid inference, benchmark target, coverage percentage, or new release gate is
|
||||
required. This planning pass has not run those implementation checks.
|
||||
|
||||
The roadmap is complete when affected production integrations use the selected
|
||||
API, ordinary authors no longer compose the shared lifecycle, obsolete paths are
|
||||
|
||||
858
docs/roadmap/implementation.md
Normal file
858
docs/roadmap/implementation.md
Normal file
@@ -0,0 +1,858 @@
|
||||
# Core And Integration API Implementation Plan
|
||||
|
||||
## Purpose And Baseline
|
||||
|
||||
Implement the accepted [Core And Integration API Roadmap](core-integration-api.md).
|
||||
That document owns scope and policy; this plan owns the implementation sequence.
|
||||
The outcome is a core-driven authoring API, not just a smaller `RunProducer`.
|
||||
|
||||
Planning baseline: `a051f34bf6db92bef65871f7602f0d15ea12b27c`.
|
||||
Application code is unchanged from
|
||||
`3887d89b763b7040efc866d4a57eb910d8778730`. Go 1.27.0 and the dependencies in
|
||||
[go.mod](../../go.mod) are sufficient starting points. No dependency update,
|
||||
configuration migration, durable schema change, or production inference is planned.
|
||||
|
||||
Each numbered stage is one implementation prompt for a Luna coding agent. Follow
|
||||
the stages in order as one end-to-end sprint. Intermediate stages may leave
|
||||
unmigrated callers or tests uncompilable. Do not build compatibility interfaces,
|
||||
duplicate executors, or temporary supported authoring recipes merely to make
|
||||
each stage green. Keep a short record of deferred compile/test repairs so later
|
||||
stages can finish them. All acceptance criteria must hold at sprint completion.
|
||||
|
||||
Begin each stage with [Development](../development.md),
|
||||
[Agent Policy](../policy/agents.md), and the policies applicable to its changes.
|
||||
Use code discovery to confirm current callers; the paths below are starting
|
||||
points, not a closed inventory. Preserve unrelated changes. Follow local commit
|
||||
policy for completed units; an intermediate commit must accurately describe any
|
||||
known incomplete migration. This plan does not authorize pushing or releasing.
|
||||
|
||||
Source-path shorthand below uses `contracts`, `pipeline`, and `semanticreconcile`
|
||||
for their directories under `internal/framework`, and `dnd` for
|
||||
`internal/modules/dnd`. Test files remain beside their owning packages.
|
||||
|
||||
## Selected Implementation Decisions
|
||||
|
||||
These decisions make the work executable without another design approval round.
|
||||
Exact Go names and file splits can follow the representative callers; preserve
|
||||
the responsibilities and data flow below.
|
||||
|
||||
### Contracts And Dependency Direction
|
||||
|
||||
- Put author-facing operation/preparation/evaluation contracts beside the existing
|
||||
typed stage contracts in `internal/framework/contracts`. Keep core execution
|
||||
in `internal/framework/pipeline`. The reconciliation facility remains in
|
||||
`internal/framework/semanticreconcile` and returns operation definitions for
|
||||
that same executor; it does not execute a second producer loop or import D&D.
|
||||
- A stage implementation prepares a typed operation. Core invokes preparation
|
||||
and executes its result. Remove the module request's assessor, cache binding,
|
||||
controls, and reuse-eligibility plumbing. Domain requests retain source/chunk,
|
||||
incoming values, references, profile/session selection, metadata, and any narrow
|
||||
optional domain-evidence facility actually needed.
|
||||
- Distinguish deterministic candidate, native model operation, and the existing
|
||||
preparation-limit disposition with small typed variants/constructors. Ordinary
|
||||
preparation failure is a Go error, not the limit variant. Avoid a workflow DSL
|
||||
or one struct containing unrelated optional branches.
|
||||
- Keep engine, resolved controls, assessment, cache codecs/store, observation,
|
||||
and terminal state in core's execution context. Registered calls bind this
|
||||
context privately. A direct caller can supply the needed core execution
|
||||
context and preparation function to the same executor; domain preparation
|
||||
does not select or replace those collaborators.
|
||||
- Remove engine storage and constructor arguments from producers that only used
|
||||
the engine to run the retired helper. Validators that execute native one-shot
|
||||
assessment still receive the shared engine. Do not remove native request and
|
||||
result types from model-owning integrations.
|
||||
|
||||
### Evaluation And Correction
|
||||
|
||||
- One evaluation owns the optional typed candidate, ordered interpretation
|
||||
guidance, candidate-associated diagnostics, and any evaluation-scoped domain
|
||||
evidence/presentation. Core adds configured assessment separately and stores
|
||||
the current evaluation as a unit. A candidate is not an acceptance claim.
|
||||
- Reconciliation uses a typed evaluation record containing its proposal issues,
|
||||
application information, omission counts/details, and family findings. Expose
|
||||
the small common evaluation view to core, using composition or a small typed
|
||||
interface. Keep reconciliation-only information out of ordinary extraction.
|
||||
Evaluation-scoped projection functions may capture those fixed typed details;
|
||||
a mutable `lastProposal`/`lastFindings` closure shared across turns is not the
|
||||
replacement design. No untyped universal metadata payload is needed.
|
||||
- Core invalidates the entire previous evaluation before constructing a selected
|
||||
correction. Construction failure, unusable native output, and undelivered work
|
||||
cannot leave its candidate or findings available as current output. Historical
|
||||
evidence may retain earlier evaluations.
|
||||
- The common correction form selects a native prompt and provides an explicit
|
||||
guidance-to-native-input binding. Implement it by constructing the same native
|
||||
request builder used by the custom form. Do not require a global `guidance`
|
||||
variable name or D&D response schema. Carry explicit initial profile/session
|
||||
selection and resolved native execution options through both forms.
|
||||
- Core owns when fallback is selected. An integration constructs and intrinsically
|
||||
checks supported output from the final eligible evaluation, or its existing
|
||||
fixed fallback inputs when no evaluation remains. Family diagnostic projection
|
||||
uses that same evaluation and terminal disposition, not an earlier turn.
|
||||
|
||||
### Preparation And Terminal Behavior
|
||||
|
||||
| Prepared/executed outcome | Core behavior |
|
||||
| --- | --- |
|
||||
| Ordinary preparation error or deterministic production error | Propagate; do not turn arbitrary errors into permissive recovery. |
|
||||
| Deterministic candidate, including a no-model branch of a model role | Assess once; apply existing terminal policy after nonacceptance. No native request, correction loop, or synthetic cache key. |
|
||||
| Existing explicit preparation-limit disposition | Apply existing strict/permissive handling and supported fallback. Do not assess a nonexistent candidate or broaden eligibility. |
|
||||
| Usable model candidate | Run the complete configured assessment; collect ordered actionable guidance; continue through native coordination when permitted. |
|
||||
| Correctable interpretation without a candidate | Use its domain guidance for native correction; do not claim approval or run candidate validators without a value. |
|
||||
| Native failure or unusable result | Preserve classification/details and existing terminal policy. Do not convert it into semantic guidance or extend native repair budgets. |
|
||||
| Model interpretation/application error | Preserve its cause and existing disposition; do not invent corrective guidance from an operational error. Capture and assessment-contract failures remain fatal. |
|
||||
| Caller cancellation, undelivered response, framework/assessment-contract failure, or required-capture failure | Preserve existing fatal handling; no acceptance or fallback. |
|
||||
| Accepted cache hit | Decode/check against current source; return accepted output without semantic reassessment or fictitious native execution. |
|
||||
|
||||
Preserve the distinction between caller cancellation and a native operation
|
||||
timeout. Preserve final-only safe-partial reconciliation, whole-chain assessment
|
||||
of the final allowed usable response, and exactly one fallback count at its
|
||||
emitting operation. These are existing contracts, not additional guarantees.
|
||||
|
||||
### Scope Control
|
||||
|
||||
Preserve native-kit ownership, module keys/default chains, fixed stage boundaries,
|
||||
artifact types/identity rules, source semantics, CLI/configuration behavior, native
|
||||
budgets, output/report contracts, and cache identity. Optional configured checks
|
||||
remain optional; codec acceptance must not silently become ordinary validator
|
||||
acceptance. An unsupported fallback still fails.
|
||||
|
||||
Use the existing generic source model. Email and NWS Forecast Discussion
|
||||
walkthroughs exercise text, domain metadata, chunk selection, and interpretation;
|
||||
they do not implement new processors, ingestion, formats, or mandatory topology.
|
||||
Do not introduce a public SDK/version guarantee, dynamic plugins, a new scheduler,
|
||||
resource limits, security hardening, or universal collaborator thread safety.
|
||||
|
||||
The remaining [audit catalog](audit/catalog.md) is not this sprint's task list.
|
||||
CAT-015/CAT-016 and CAT-007 are in scope. Other entries are affected only to the
|
||||
extent demonstrated by this migration. In particular, runner-wide diagnostic
|
||||
retention/group-cap changes, process signals, full-source capture deduplication,
|
||||
pipeline-layout consolidation, and unrelated efficiency fixes remain separate.
|
||||
If this work must change whole-source capture representation, follow the accepted
|
||||
[discussion Item 2](audit/discussion.md#2-convenient-debug-evidence-and-repeated-full-source-capture)
|
||||
and record the added scope; do not invent a conflicting representation.
|
||||
|
||||
## Validation Approach
|
||||
|
||||
Use real internal collaborators and native kits with offline provider fakes.
|
||||
Move/adapt existing behavioral tests as their entry points change; retain their
|
||||
independent domain expectations. New common lifecycle coverage belongs in core,
|
||||
not a full duplicate matrix in every family. Test observable outputs, assessment,
|
||||
native history/selections, fallback, cancellation, reuse, and capture failure.
|
||||
Do not pin callback order, type layout, error prose, prompt English, or hashes as
|
||||
change detectors. Test-controlled prompt markers may verify request binding.
|
||||
|
||||
Each stage lists focused commands. Run them when the affected packages can build;
|
||||
if an earlier interface cutover prevents execution, record that fact and rerun the
|
||||
checks after migration rather than claiming they passed. The last stage requires
|
||||
the full suite. No paid API, benchmark threshold, coverage target, new CI gate,
|
||||
or release process is needed. Adjust focused test-name filters when tests move
|
||||
or are renamed; a filter matching no tests does not verify the stage.
|
||||
|
||||
## Stage 1 — Define The Typed Preparation And Evaluation API
|
||||
|
||||
**Goal:** Establish the authoring contract using representative integrations.
|
||||
|
||||
**Inspect:** `contracts/{contracts,typed_pipeline,producer}.go`,
|
||||
`pipeline/{typed_execution,construction}.go`, spell extraction, scene planning,
|
||||
the three registry normalizers, and current source types.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Inventory producer/outcome-helper callers, typed registrations, direct tests,
|
||||
generic deterministic modules, and preparation-limit/no-model paths. Keep the
|
||||
inventory as a compact migration checklist in this plan, without freezing counts.
|
||||
- Define the operation variants and common evaluation view selected above.
|
||||
Give the core a preparation function to invoke; do not inject an executor for
|
||||
the module to call. Separate domain requests from framework execution context.
|
||||
- Sketch spell extraction, scene-plan interpretation with no candidate, a
|
||||
deterministic branch, and registry application through those types. Add small
|
||||
synthetic email/NWS-shaped source and operation sketches. Use domain metadata
|
||||
without transcript speakers, scene tags, or registry requirements.
|
||||
- Specify ownership of returned operation inputs, evaluation values, mutable maps/
|
||||
slices, and optional evidence hooks in local comments. Existing prepared module
|
||||
instances may serve concurrent operations; new per-operation state belongs to
|
||||
that preparation, not shared module fields. Preserve current detached boundaries
|
||||
rather than imposing a new blanket clone/immutability system.
|
||||
|
||||
**Acceptance:** Representative cases fit one core-driven contract; no domain type
|
||||
enters core; ordinary preparation cannot access assessor/cache replacement or
|
||||
terminal helper selection. Exact names are selected here, not deferred to each
|
||||
module migration. Keep the design sketches small and reusable as later fixtures.
|
||||
|
||||
**Check:** `go test ./internal/framework/contracts ./internal/core/source`.
|
||||
This stage is one prompt for contracts and sketches, not executor implementation.
|
||||
|
||||
## Stage 2 — Correct And Share Native Result Usability Handling
|
||||
|
||||
**Goal:** Resolve CAT-007 independently of the broader lifecycle rewrite.
|
||||
|
||||
**Inspect:** `pipeline/producer.go`, combat semantic `validator.go` and tests,
|
||||
`semanticreconcile/engine_test.go`, and pinned native result/error types.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Add one small framework-owned check distinguishing absent result, completed
|
||||
failed/invalid native validation, and an actual native Go error. Keep useful
|
||||
native validation details in the returned cause. Do not manufacture
|
||||
`promptkit.ErrValidation` for a completed content-check failure.
|
||||
- Use it in the current producer and one-shot combat validator. The producer
|
||||
retains its terminal handling; the validator retains unavailable judgment.
|
||||
Preserve actual upstream causes for `errors.Is`/`errors.As`, cancellation,
|
||||
capture failure, and ordinary valid-result interpretation.
|
||||
- Correct the validator's wrong-sentinel assertion. At both caller boundaries,
|
||||
check retained validation detail and refusal to interpret unusable content.
|
||||
- Repair the native reconciliation fixture to select its real schema context,
|
||||
request zero repair attempts, and require nil Go error plus a present failed
|
||||
validation result with useful details and one provider call. An arbitrary setup
|
||||
or schema-path error must not satisfy that test.
|
||||
|
||||
**Acceptance:** A completed failed check is not mislabeled as an upstream
|
||||
operational error; real upstream errors retain their identity. No extra loop or
|
||||
budget is added. The later executor reuses this check.
|
||||
|
||||
**Checks:** `go test ./internal/framework/pipeline ./internal/framework/semanticreconcile`
|
||||
and `go test ./internal/modules/dnd/validate/scenedescriptions/combat_semantics`.
|
||||
|
||||
## Stage 3 — Execute Preparation And Deterministic Outcomes In Core
|
||||
|
||||
**Goal:** Implement the core entry point and terminal policy before native work.
|
||||
|
||||
**Inspect:** `pipeline/{producer_outcome,runner_operation,candidate_assessment}.go`
|
||||
and their existing tests; Stage 1's types and migration checklist.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Implement the typed executor that calls preparation once and consumes its
|
||||
operation variant. Registered and direct use will share this implementation.
|
||||
- Handle deterministic candidate, explicit preparation limit, and ordinary error
|
||||
distinctly. Reuse assessment/terminal helpers privately where useful.
|
||||
- Return core-owned value, current evaluation/assessment information needed for
|
||||
diagnostics, and terminal disposition. Integrations do not construct acceptance.
|
||||
- Apply core terminal mode once. A supported fallback is constructed once,
|
||||
intrinsically checked by its owner, not ordinarily reassessed, and reuse-ineligible.
|
||||
Honor caller cancellation and framework/assessment-contract failure precedence.
|
||||
- Port existing no-model and terminal-policy tests to the new core boundary;
|
||||
cover a preparation error that must not invoke fallback.
|
||||
|
||||
**Acceptance:** Core invokes preparation and assessment; deterministic work has
|
||||
no engine/request requirement, no synthetic key, and no production retry. Existing
|
||||
permissive behavior is neither widened nor removed.
|
||||
|
||||
**Check:** `go test ./internal/framework/pipeline -run 'Producer|Operation'`.
|
||||
|
||||
## Stage 4 — Move Native Evaluation And Continuation Into The Executor
|
||||
|
||||
**Goal:** Own model production and replace coupled outer candidate variables.
|
||||
|
||||
**Inspect:** `pipeline/producer.go`, native continuation/cancellation tests, and
|
||||
the initial/correction request pairs in the pilot modules.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Run native initial requests through the shared engine and Stage 2's usability
|
||||
check. Interpret into a complete evaluation; assess each usable candidate once.
|
||||
- Use explicit current-evaluation and terminal state, separate from pending
|
||||
capture state. Replace findings with the candidate and clear the evaluation
|
||||
before building a selected correction. No stale candidate survives a failed
|
||||
builder, result-less execution, or unusable correction.
|
||||
- Implement the common correction prompt plus guidance-input binder as a native
|
||||
builder convenience. Exercise a different test-controlled input binding and a
|
||||
specialized builder. Both use one path with native `Coordinate`, growing
|
||||
exchange history, initial selections, and resolved execution overrides.
|
||||
- Carry interpretation-only guidance without a candidate. Native errors and
|
||||
validator unavailability do not become invented corrective instructions.
|
||||
- If a candidate exists, interpretation guidance does not short-circuit its
|
||||
configured validator chain. Keep native admission released before assessment
|
||||
so nested validators can use the same limited backend.
|
||||
- Preserve complete assessment of unchanged revisions and the final allowed
|
||||
response, native turn limits, caller-cancellation precedence, operation-timeout
|
||||
classification, and undelivered-response handling.
|
||||
|
||||
**Acceptance:** The executor owns acceptance and continuation; the integration
|
||||
has no turn loop. Candidate and associated findings are replaced atomically as a
|
||||
logical evaluation. Existing producer tests protect behavior, not old closures.
|
||||
|
||||
**Check:** `go test ./internal/framework/pipeline -run 'NativeProducer|Producer.*Cancellation'`.
|
||||
|
||||
## Stage 5 — Bind Accepted-Result Reuse Inside Core Execution
|
||||
|
||||
**Goal:** Preserve cache semantics without author-controlled lifecycle plumbing.
|
||||
|
||||
**Inspect:** `pipeline/{producer_cache,runner_cache}.go`, producer/runner cache
|
||||
tests, chunk-plan cache tests, and [ADR-0023](../adr/0023-unify-accepted-artifact-and-plan-caching.md).
|
||||
|
||||
**Work:**
|
||||
|
||||
- Bind existing store, exact codec, current-source checks, and reuse eligibility
|
||||
to the executor through framework-owned context, not domain preparation requests.
|
||||
- Prepare the initial native request once; use its opaque message-content hash
|
||||
and execute its retained prepared handle after a miss. Discard handles on every
|
||||
terminal path. Do not rerender between keying and execution.
|
||||
- Cache final accepted artifacts/plans, including corrected output, under the
|
||||
original key. Hits decode/check current source without ordinary reassessment.
|
||||
- Preserve bypass/refresh and previous entries on failed refresh. Fallback or
|
||||
fallback-derived work skips lookup/write; deterministic/no-model work has no
|
||||
manufactured key. Keep cache I/O diagnostic and encoding/capture errors distinct.
|
||||
|
||||
**Acceptance:** Existing reuse tests can use the new executor without changing
|
||||
the selected cache contract, adding dimensions, or persisting evaluation metadata.
|
||||
|
||||
**Check:** `go test ./internal/framework/pipeline -run 'ProducerCache|ProducerCaches|ProducerExecutes|RunnerCache|ChunkPlanCache'`.
|
||||
|
||||
## Stage 6 — Attach Evidence And Observation To Core-Owned Operations
|
||||
|
||||
**Goal:** Keep standard evidence out of integration lifecycle code.
|
||||
|
||||
**Inspect:** `pipeline/{native_capture,operation_capture,producer}.go`,
|
||||
operation evidence helpers, native capture tests, and run-state internals.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Attach existing native capture/preparation/consumer observation hooks at the
|
||||
executor boundary. Preserve supplied native hooks and the invocation context.
|
||||
- Record standard preparation, candidate assessment, correction, cache decision,
|
||||
and terminal evidence from actual execution. Retain earlier evaluations as
|
||||
history without attributing their findings to the final artifact.
|
||||
- Keep pending native capture finalization separate from candidate evaluation.
|
||||
Finish each actual request on success, native failure, cancellation, or
|
||||
undelivered continuation; preserve requested-capture failure and primary causes.
|
||||
- Allow narrow optional domain evidence, including typed reconciliation detail,
|
||||
without making the integration finalize capture. Guard expensive debug-only
|
||||
construction before building its payload; use evaluation-scoped lazy projection
|
||||
where needed. Required artifact encoding is not debug-only work.
|
||||
- Cache hits may retain prepared/cache evidence but emit no native execution or
|
||||
fabricated observation. Do not add invocation accounting or a capture package
|
||||
migration. Leave untouched legacy capture inventory for the later audit work.
|
||||
|
||||
**Acceptance:** Disabled evidence avoids new expensive debug-only work; enabled
|
||||
evidence and independent observers retain their actual lifecycle. Physical sinks,
|
||||
allocation, report delivery, and invocation finalization remain at existing owners.
|
||||
|
||||
**Check:** `go test ./internal/framework/pipeline -run 'Capture|Evidence|Producer'`.
|
||||
|
||||
## Stage 7 — Wire Typed Extraction And Migrate The Spell Pilot
|
||||
|
||||
**Goal:** Prove registered extraction reaches the core executor end to end.
|
||||
|
||||
**Inspect:** `pipeline/{extractor_registry,typed_execution,prepare,runner_concurrent}.go`,
|
||||
spell `extractor.go`, shared extraction input helpers, and typed registration tests.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Change extraction's typed interface/request to preparation under the selected
|
||||
API. Registry erasure binds exact type and core context, invokes preparation
|
||||
through the executor, and returns only core-completed results to the runner.
|
||||
- Adapt `runExtractJob` without adding a second worker acquisition, outer
|
||||
assessment, or new scheduler. Preserve source/reference isolation, provenance,
|
||||
diagnostic origin, fallback count, serialization, and scoped errors.
|
||||
- Migrate spells: prepare fixed catalog/registry/chunk inputs, return native
|
||||
initial request and interpretation plus convenient correction and fallback.
|
||||
Remove the producer engine field and domain `RunProducer` invocation.
|
||||
- Update spell direct-call tests to use the same core entry point with explicit
|
||||
test-controlled core context; retain independent expected spell output.
|
||||
- Exercise exact-type registration and a core-selected correction/cache hit
|
||||
through a registered pilot, not only a helper test.
|
||||
|
||||
**Acceptance:** Spell domain code describes preparation and policy, not execution
|
||||
or terminal composition. Registration uses core; no external outcome can bypass
|
||||
its assessment. Other extractors may await their migration stages.
|
||||
|
||||
**Checks:** `go test ./internal/modules/dnd/extract/spells` and focused typed
|
||||
extraction/operation tests in `./internal/framework/pipeline`.
|
||||
|
||||
## Stage 8 — Wire Merge And Normalize Preparation
|
||||
|
||||
**Goal:** Apply the same boundary to the remaining typed lane stages.
|
||||
|
||||
**Inspect:** `pipeline/{merger_registry,normalizer_registry,typed_execution,runner_typed}.go`,
|
||||
generic `merge/appendorder/typed.go`, generic `normalize/noop/typed.go`, and prepared lanes.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Adapt typed merger/normalizer registration and private exact-type erasure to
|
||||
bind and invoke the same executor. Retain type/codec/projector compatibility
|
||||
failures as errors, not panics or looser `any` acceptance.
|
||||
- Change runner merge/normalize completion to consume core outcomes rather than
|
||||
trust module-owned disposition and then choose another completion recipe.
|
||||
- Migrate generic append-order and noop implementations to deterministic prepared
|
||||
candidates. Keep ordering, domain combine errors, empty representation, and
|
||||
ownership behavior. No synthetic prompts are required.
|
||||
- Keep merge/normalize in the existing ready lane continuation. Preserve generated
|
||||
handoff/reuse propagation and count emitted fallback once, not again in consumers.
|
||||
- Adapt local generic and framework fixtures used by these paths. Domain D&D
|
||||
normalizers can remain pending until their assigned migration stages.
|
||||
|
||||
**Acceptance:** All typed stage adapters have the core-owned route; deterministic
|
||||
generic modules produce once, and no configured assessment is duplicated outside it.
|
||||
|
||||
**Checks:** `go test ./internal/modules/generic/merge/appendorder ./internal/modules/generic/normalize/noop`
|
||||
and focused runner operation/typed resolution tests.
|
||||
|
||||
## Stage 9 — Wire Chunk Planning And Migrate D&D Scenes
|
||||
|
||||
**Goal:** Include plan production without making scenes a core concept.
|
||||
|
||||
**Inspect:** `contracts/contracts.go`, `pipeline/{chunker_registry,runner_chunk_plan}.go`,
|
||||
generic unit chunking, D&D scene chunking, plan materialization, and plan cache tests.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Move chunker invocation to preparation consumed by the same core executor.
|
||||
The framework still materializes/validates generic plans before assessing chunks.
|
||||
- Migrate generic unit chunking as deterministic preparation and D&D scene planning
|
||||
as native preparation. Preserve plan annotations, source order/coverage checks,
|
||||
identity, and the existing supported whole-source fallback.
|
||||
- Return actionable interpretation guidance when a scene response cannot yet
|
||||
produce a materializable candidate; do not assess nonexistent chunks.
|
||||
- Keep plan cache decoding/rematerialization current-source-aware and native-only;
|
||||
preserve no semantic reassessment on hits and accepted correction writes.
|
||||
- Adapt chunker/direct-call fixtures and remove their integration-owned acceptance
|
||||
assembly. Do not add scene metadata to generic source contracts.
|
||||
|
||||
**Acceptance:** Deterministic and model-assisted planning share core disposition
|
||||
while preserving their distinct production paths. Invalid generic plans still fail
|
||||
at the appropriate boundary; no new chunk topology is promised.
|
||||
|
||||
**Checks:** `go test ./internal/modules/generic/chunk/units ./internal/modules/dnd/chunk/scenes`
|
||||
and chunk-plan/materialization/cache tests in `./internal/framework/pipeline`.
|
||||
|
||||
## Stage 10 — Migrate Combat-Gated Extraction And Its No-Model Paths
|
||||
|
||||
**Goal:** Prove no-model completion is a prepared operation, not a helper choice.
|
||||
|
||||
**Inspect:** `dnd/extract/combatturns` and `dnd/extract/enemyevents`, their
|
||||
operation-registry input handling, and default registration/capability tests.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Migrate both extractors to native preparation for applicable chunks and a
|
||||
deterministic candidate for their existing non-combat branches.
|
||||
- Remove calls to direct assessment/outcome helpers, stored producer engines,
|
||||
and manually assembled producer outcomes. Core performs configured assessment
|
||||
once even when no model call is needed.
|
||||
- Retain combat gating, contextual registry resolution, identities, endpoint
|
||||
canonicalization, correction guidance, family fallback, and explicit selections.
|
||||
- Exercise both branches through core with a native provider fake. A no-model
|
||||
branch consumes no provider call and adds no synthetic cache entry.
|
||||
|
||||
**Acceptance:** Empty non-combat output is still subject to the configured chain;
|
||||
the migration does not invent combat classifications or silently skip assessment.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/extract/combatturns ./internal/modules/dnd/extract/enemyevents`.
|
||||
|
||||
## Stage 11 — Migrate The Three Registry Extractors
|
||||
|
||||
**Goal:** Move canonical noun extraction to domain-only preparation.
|
||||
|
||||
**Inspect:** `dnd/extract/{npcregistry,itemregistry,locationregistry}`, their typed
|
||||
response interpretation/identity helpers, tests, and D&D registration.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Return prepared native requests/evaluations with the convenient correction
|
||||
binding and existing fallback algorithms. Remove module-owned execution and
|
||||
terminal result composition and unused engine constructor dependencies.
|
||||
- Preserve each registry's extraction scope, exact naming/identity behavior,
|
||||
source resolution, nil/empty output, and external/generated reference handling.
|
||||
- Retain native prompt IDs/static dependencies and schema selection. This is not
|
||||
a prompt rewrite or domain scope expansion.
|
||||
- Adapt direct-call tests to core and keep independent family output expectations.
|
||||
|
||||
**Acceptance:** All registry extractors use the pilot's lifecycle without forcing
|
||||
their domain preparation into one configurable D&D extractor engine.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/extract/npcregistry ./internal/modules/dnd/extract/itemregistry ./internal/modules/dnd/extract/locationregistry`.
|
||||
|
||||
## Stage 12 — Migrate The Three Occurrence Extractors
|
||||
|
||||
**Goal:** Preserve contextual selections and domain feedback at the new boundary.
|
||||
|
||||
**Inspect:** `dnd/extract/{npcoccurrences,itemoccurrences,locationoccurrences}`,
|
||||
their registry projections/resolvers, and current fallback/correction tests.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Migrate preparation, native interpretation, correction, and fallback for all
|
||||
three. Keep request-local/domain contextual selection and deterministic durable
|
||||
ID attachment; do not expose opaque application IDs to the model.
|
||||
- Replace returned candidate/guidance tuples with explicit evaluations. Preserve
|
||||
the meaning of correctable selection errors versus ordinary preparation errors.
|
||||
- Retain item holder/kind compatibility, location disambiguation, source ranges,
|
||||
registry lookup precedence, and family-specific diagnostics.
|
||||
- Exercise occurrence preparation with generated references via the typed route;
|
||||
direct tests use the shared core entry point, not a module executor wrapper.
|
||||
|
||||
**Acceptance:** Occurrence modules contain domain interpretation rather than
|
||||
acceptance state, and no registry-specific concepts leak into ordinary core.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/extract/npcoccurrences ./internal/modules/dnd/extract/itemoccurrences ./internal/modules/dnd/extract/locationoccurrences`.
|
||||
|
||||
## Stage 13 — Migrate Scene Extraction And Two Deterministic Normalizers
|
||||
|
||||
**Goal:** Finish model extraction and cover non-registry normalization examples.
|
||||
|
||||
**Inspect:** `dnd/extract/scenedescriptions`, `dnd/normalize/scenedescriptions`,
|
||||
`dnd/normalize/spells`, and scene/combat semantic validator registration.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Migrate scene description extraction to prepared model work and explicit
|
||||
evaluations. Preserve deterministic scene identity/range attachment, actual
|
||||
fallback support, and both configured deterministic and one-shot model checks.
|
||||
- Adapt scene-description and spell normalization to deterministic preparation,
|
||||
retaining the existing transformation, diagnostic, cloning, and intrinsic checks.
|
||||
- Do not promote optional shape validation into stricter codec acceptance or
|
||||
redesign scene-domain rule ownership as an incidental part of this migration.
|
||||
- Keep the combat semantic validator a one-shot native assessor using Stage 2's
|
||||
check; it does not invoke the producer executor or semantic correction loop.
|
||||
|
||||
**Acceptance:** All ten baseline extractors have migrated; these deterministic
|
||||
normalizers receive one core assessment and retain existing output semantics.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/extract/scenedescriptions ./internal/modules/dnd/normalize/scenedescriptions ./internal/modules/dnd/normalize/spells ./internal/modules/dnd/validate/scenedescriptions/combat_semantics`.
|
||||
|
||||
## Stage 14 — Adapt The Remaining Deterministic D&D Normalizers
|
||||
|
||||
**Goal:** Finish the mechanical deterministic contract migration.
|
||||
|
||||
**Inspect:** `dnd/normalize/{combatturns,enemyevents,npcoccurrences,itemoccurrences,locationoccurrences}`
|
||||
and their typed registration and regression fixtures.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Return deterministic prepared candidates plus domain diagnostics and existing
|
||||
supported fallback behavior where applicable. Core owns assessment/disposition.
|
||||
- Keep domain transformation bodies intact unless the new boundary requires a
|
||||
small adjustment. Preserve exact duplicate rules, ordering/ties, references,
|
||||
identity resolution, unknown values, and nil/present-empty storage behavior.
|
||||
- Adapt constructor/registration and direct test entry points, not expected
|
||||
domain output. Do not fold the audit's sort/dedup/shape refactors into this step.
|
||||
|
||||
**Acceptance:** Every deterministic lane module now fits core preparation without
|
||||
model machinery. Registry semantic normalization remains for Stages 15–19.
|
||||
|
||||
**Check:** Run the five focused `dnd/normalize` packages above; rerun generic
|
||||
append-order/noop tests if shared adaptation helpers change. This is one prompt
|
||||
for repetitive signature/adaptor work, not five new domain algorithms.
|
||||
|
||||
## Stage 15 — Build Shared Reconciliation Preparation
|
||||
|
||||
**Goal:** Give families one typed entry into reconciliation without execution glue.
|
||||
|
||||
**Inspect:** `semanticreconcile/{preparation,requests,application,proposal}.go`,
|
||||
all three normalizer procedures, and Stage 1's typed reconciliation sketch.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Add a focused facility that constructs a core operation using existing neutral
|
||||
preparation. Accept fixed original records, domain candidate projection,
|
||||
native prompt selections, typed family application/diagnostic functions, and
|
||||
existing supported fallback construction.
|
||||
- Retain original merged fallback inputs separately from deterministically
|
||||
preprocessed records. Prepare handles/windows/material once per operation.
|
||||
- Centralize insufficient-candidate/no-model and preparation-limit decisions;
|
||||
return their typed operation variants, not calls to core terminal helpers.
|
||||
Ordinary projection/preparation errors still propagate.
|
||||
- Supply initial native requests and correction builders from retained preparation;
|
||||
preserve candidate-number range and namespace guidance. Share standard original/
|
||||
preparation evidence with lazy construction when disabled.
|
||||
- Exercise the facility with a small synthetic record family before migrating
|
||||
production families. Do not add NPC/item/location switches or imports.
|
||||
|
||||
**Acceptance:** Families can describe reconciliation preparation without choosing
|
||||
an assessor, cache, terminal helper, or native execution path. Existing limits
|
||||
and their meaning remain unchanged.
|
||||
|
||||
**Check:** `go test ./internal/framework/semanticreconcile` and relevant contracts
|
||||
tests. Model evaluation/application lifecycle is completed in Stage 16.
|
||||
|
||||
## Stage 16 — Centralize Reconciliation Evaluation And Terminal Projection
|
||||
|
||||
**Goal:** Replace duplicated current-proposal bookkeeping with typed evaluations.
|
||||
|
||||
**Inspect:** Proposal safety/application APIs, all three family interpretation/
|
||||
finish/fallback closures, core evaluation replacement, and evidence support.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Implement proposal decoding/safety assessment and a typed application callback
|
||||
in the facility. Apply each complete proposal afresh to fixed originals; retain
|
||||
safe groups and all affected originals according to existing application policy.
|
||||
- Construct one typed reconciliation evaluation holding candidate, issues,
|
||||
application omissions, family findings, and ordered guidance. Translate it to
|
||||
the common core view without putting family data in core fields.
|
||||
- Project final domain diagnostics from the same evaluation and core disposition.
|
||||
Preserve no-model base findings, final safe-partial warnings, and original-input
|
||||
fallback when no evaluation is eligible. Do not carry findings/omission counts
|
||||
from a superseded or failed correction into final output.
|
||||
- Centralize standard proposal/application evidence and result assembly. Families
|
||||
retain semantic guidance, domain warning meaning, and fallback validation.
|
||||
- Add focused synthetic lifecycle coverage for proposal replacement rather than
|
||||
union, omitted safe groups, no-model/limit, and invalidation before correction.
|
||||
Use the same core executor with native fakes; do not create another turn loop.
|
||||
|
||||
**Acceptance:** The facility owns lifecycle state and families supply typed policy.
|
||||
Its current evaluation and native capture are separate; domain diagnostics are
|
||||
about the final value, while historical proposal evidence remains available.
|
||||
|
||||
**Check:** `go test ./internal/framework/semanticreconcile ./internal/framework/pipeline`.
|
||||
|
||||
## Stage 17 — Migrate NPC Registry Normalization
|
||||
|
||||
**Goal:** Establish the first production reconciliation adapter.
|
||||
|
||||
**Inspect:** `dnd/normalize/npcregistry/{normalizer,semantic_normalizer_test}.go`,
|
||||
NPC identity, application, evidence, and normalization-result helpers.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Replace the repeated native/no-model/limit/finish procedure with the shared
|
||||
reconciliation operation builder. Keep NPC record preprocessing/projection,
|
||||
canonical naming/identity, typed group application, and fallback validation local.
|
||||
- Translate neutral issues and final typed application data into the existing
|
||||
family guidance/diagnostics through a D&D-local adapter where genuinely shared.
|
||||
- Remove engine storage and mutable proposal/findings state from the normalizer.
|
||||
Core chooses fallback and the facility projects current evaluation diagnostics.
|
||||
- Adapt semantic tests and registration to the core route; retain independent
|
||||
expectations for safe aliases, invalid/overlapping groups, retained candidates,
|
||||
fresh application, no-model output, and qualified fallback.
|
||||
|
||||
**Acceptance:** The normalizer reads primarily as NPC domain policy. A failed
|
||||
later response cannot recover an earlier proposal's output or findings.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/normalize/npcregistry`.
|
||||
|
||||
## Stage 18 — Migrate Item Registry Normalization
|
||||
|
||||
**Goal:** Exercise richer compatibility and omission guidance without family switches.
|
||||
|
||||
**Inspect:** `dnd/normalize/itemregistry`, currency compatibility/application
|
||||
helpers, and the item tests for independent safe groups and all omission counts.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Migrate to the same reconciliation facility. Preserve exact preprocessing,
|
||||
same-denomination currency aliases, incompatibility with other denominations/
|
||||
non-currency items, evidence unions, and deterministic item identity.
|
||||
- Return currency rejection guidance and omission details in the typed evaluation;
|
||||
retain family diagnostic classification and supported fallback construction.
|
||||
- Exercise a later proposal replacing earlier safe groups, native/correction
|
||||
failure clearing candidate details, and accepted versus final fallback output.
|
||||
Reuse core coverage where it already protects generic lifecycle behavior.
|
||||
- Remove the local no-model/limit/finish choreography, stored engine, and parallel
|
||||
`findings`/`advisories`/`discardedGroups`/`omissionDetails` state.
|
||||
|
||||
**Acceptance:** Item-specific compatibility stays typed and local; generic core
|
||||
does not learn currency or reuse stale omissions. No new permissive fallback
|
||||
eligibility is introduced.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/normalize/itemregistry`.
|
||||
|
||||
## Stage 19 — Migrate Location Registry Normalization
|
||||
|
||||
**Goal:** Complete production reconciliation and preserve location distinctions.
|
||||
|
||||
**Inspect:** `dnd/normalize/locationregistry`, location identity/anchor handling,
|
||||
and tests for same-named locations, nesting, exact duplicates, and unsafe proposals.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Replace lifecycle glue with the shared operation facility. Retain typed location
|
||||
preprocessing, anchor/identity semantics, candidate eligibility, evidence,
|
||||
safe application, and intrinsic fallback checks.
|
||||
- Keep same-named but distinct places separate under the existing rules. Do not
|
||||
reduce this family to NPC/item name identity to fit a shared helper.
|
||||
- Use typed evaluation data for final findings/omissions and preserve no-model
|
||||
and limit handling through core. Remove old engine/lifecycle state.
|
||||
- Compare the three adapters after migration. Extract only genuinely equivalent
|
||||
D&D diagnostic translation; revise the facility if family switches or repeated
|
||||
framework coordination have appeared instead of hiding those differences.
|
||||
|
||||
**Acceptance:** All three registry normalizers share lifecycle code, retain their
|
||||
independent domain expectations, and use the same core execution path as extraction.
|
||||
|
||||
**Check:** `go test ./internal/modules/dnd/normalize/locationregistry`
|
||||
and the three registry-normalization packages together.
|
||||
|
||||
## Stage 20 — Complete The Cutover And Remove Superseded Plumbing
|
||||
|
||||
**Goal:** Remove the old authoring recipe and finish remaining callers.
|
||||
|
||||
**Inspect:** The Stage 1 caller checklist; all production registrars; pipeline,
|
||||
CLI, preflight, generic, and contracts test fixtures; generated handoff and reuse tests.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Finish remaining programmatic/test callers of the changed stage interfaces.
|
||||
Remove obsolete public lifecycle fields, helper wrappers, outcome-specializing
|
||||
adapters, and module-side executor selection. Useful assessment/cache/capture
|
||||
helpers can remain internal. Do not retain an obsolete recipe for tests alone.
|
||||
- Verify registered extraction, merge, normalization, and chunk preparation all
|
||||
reach the same executor; prepare-time exact-type/construction failures still
|
||||
precede input parsing. Keep module keys, profiles/static dependencies, and
|
||||
complete maintained example configurations valid.
|
||||
- Review all remaining domain calls to producer/outcome helpers and engine
|
||||
execution. Producers should prepare; the one-shot validator remains intentional.
|
||||
Search results are review aids, not a test forbidding native types in modules.
|
||||
|
||||
**Acceptance:** No obsolete production authoring path remains. The entire
|
||||
repository compiles again. Resolve every earlier deferred migration repair before
|
||||
proceeding, except documentation work assigned below. The next stage verifies
|
||||
assembled behavior rather than making compatibility wrappers for failing fixtures.
|
||||
|
||||
**Checks:** `go test ./internal/framework/... ./internal/modules/... ./internal/cli ./internal/preflight`.
|
||||
|
||||
## Stage 21 — Verify Cross-Boundary And Concurrent Execution
|
||||
|
||||
**Goal:** Establish behavior where correctness spans the new owners.
|
||||
|
||||
**Inspect:** Core executor and stage adapters; existing pipeline worker, operation,
|
||||
cache, capture, generated-handoff, CLI recovery, and native admission tests.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Run representative assembled tests for full assessment/final turns, native
|
||||
history and explicit selections, interpretation-only guidance, cache hits and
|
||||
corrected writes, failed refresh, fallback-tainted generated consumers, and
|
||||
required capture failure. Preserve partial output/error behavior already owned
|
||||
by the runner/CLI; do not silently undertake deferred diagnostic-finalization work.
|
||||
- Reuse worker/admission tests for concurrent operation-state isolation, bounded
|
||||
jobs, cancellation/draining, and nested validation on a capacity-one backend.
|
||||
Add controlled synchronization only where the new boundary lacks protection.
|
||||
- Inspect gaps introduced by moving ownership. Retain one common lifecycle test
|
||||
owner and representative family expectations; remove redundant legacy mock
|
||||
choreography only after its meaningful behavioral protection is retained.
|
||||
|
||||
**Acceptance:** Domain results, source handling, independent observations,
|
||||
fallbacks, and reuse behave as selected;
|
||||
concurrent operations cannot accidentally reuse another operation's evaluation.
|
||||
Assembled tests verify behavior at the new boundary without adding an exhaustive
|
||||
cross-product or reimplementing upstream structural repair tests.
|
||||
|
||||
**Checks:** `go test ./internal/framework/... ./internal/modules/... ./internal/cli ./internal/preflight`
|
||||
and `go test -race ./internal/framework/pipeline ./internal/framework/semanticreconcile`.
|
||||
|
||||
## Stage 22 — Provide The Working Author Example And Internal Guides
|
||||
|
||||
**Goal:** Make the new boundary usable without reading producer implementation.
|
||||
|
||||
**Inspect:** Stage 1's non-D&D sketches, actual finished APIs, and current
|
||||
`docs/internal/{modules,pipeline,dnd,llm,state,overview}.md`.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Finish one minimal domain-neutral working example, preferably an external
|
||||
package test fixture under the framework with a real registrar/codec and a
|
||||
local provider fake. Keep it reusable by the tests instead of creating a new
|
||||
production demo command. Use generic text/metadata/chunks, not D&D conventions.
|
||||
- Demonstrate preparation and execution, contextual domain interpretation, a
|
||||
correction binding, and deterministic/no-model completion. The email/NWS
|
||||
sketches must expose no forced scene/combat/registry assumptions; only one
|
||||
concrete introductory example is needed. Point to a migrated registry for
|
||||
richer reconciliation rather than duplicating it in the example.
|
||||
- Rewrite Module Internals' recipe for core-owned preparation. Cover required
|
||||
versus optional behavior, direct callers, ordinary errors versus domain
|
||||
guidance/limits, supported fallback, evaluation lifetime, concurrency, and
|
||||
evidence ownership. Link the tested example and real production adapters.
|
||||
- Update Pipeline/D&D Internals and affected overview/LLM/state descriptions to
|
||||
match the actual owners. Identify engine/capture/cache construction rather than
|
||||
documenting upstream library features; link pinned native documentation for them.
|
||||
- Document actual shared-instance/input/hook lifetimes without promising every
|
||||
supplied writer/observer is thread-safe or installing blanket locks. No external
|
||||
author study, readability gate, or new documentation test framework is needed.
|
||||
|
||||
**Acceptance:** The introductory example executes through registration and core,
|
||||
not a private producer import. Documentation presents one current recipe, with
|
||||
domain-specific policy owned by families and volatile details in canonical homes.
|
||||
|
||||
**Checks:** Run the package test containing the example; verify local links and
|
||||
API references against source. Run affected example/config loading tests if changed.
|
||||
|
||||
## Stage 23 — Record Ownership And Reassess Overlapping Audit Findings
|
||||
|
||||
**Goal:** Bring architectural guidance and audit status in line with the result.
|
||||
|
||||
**Inspect:** Architecture policy, ADR-0022 and related ADR status links,
|
||||
`audit/{catalog,discussion}.md`, and completed implementation/test evidence.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Add the next sequential ADR (currently 0026) for core-invoked preparation,
|
||||
core-owned operation lifecycle, explicit evaluations, and focused reconciliation.
|
||||
Explain the integration boundary and why helper-only cleanup was insufficient.
|
||||
- Update ADR-0022's status/navigation only to identify the narrow supersession
|
||||
of module-composed producer mechanics. Retain its accepted body and unaffected
|
||||
native continuation, assessment, guidance, and terminal policy decisions.
|
||||
- Update architecture policy's concrete ownership description, including the
|
||||
expanded neutral reconciliation responsibility. Preserve fixed stages, kit
|
||||
ownership, ordinary error behavior, and selected acceptance/reuse contracts.
|
||||
Do not turn new helper signatures or private representation into invariants.
|
||||
Update its local last-updated date; retain the adopted upstream baseline.
|
||||
- Reassess CAT-007, CAT-015, and CAT-016 with source/test links. Qualify partial
|
||||
progress on CAT-003/006/008/009/014/017/018/022/023/024/025/032 where relevant;
|
||||
do not mark entire findings resolved merely because nearby code moved.
|
||||
- Update catalog summary/status wording and discussion Item 5's implementation
|
||||
status to agree with the evidence. Keep original audit reports as historical
|
||||
evidence, preserve unrelated outstanding entries and CAT-034's resolved status.
|
||||
Do not implement the remaining audit in this step or retire its evidence.
|
||||
|
||||
**Acceptance:** Architectural rationale and current guidance agree; the catalog
|
||||
accurately describes what this sprint did and did not address. No broader
|
||||
restrictions or guarantees have been introduced through documentation or tests.
|
||||
|
||||
**Checks:** Review changed ADR/status links and documentation links; compare
|
||||
catalog resolutions to actual tests and code, not just the migration inventory.
|
||||
|
||||
## Stage 24 — Perform Final Sprint Acceptance
|
||||
|
||||
**Goal:** Establish that the target architecture is complete and ready for review.
|
||||
|
||||
**Work:**
|
||||
|
||||
- Run the checks below, fixing sprint regressions at their owning boundary.
|
||||
Rerun any focused checks deferred because of the intermediate interface cutover.
|
||||
- Review the caller checklist against current source: ten baseline extractors,
|
||||
scene planning, three semantic registry normalizers, deterministic modules,
|
||||
typed registration/preparation, direct callers, and the one-shot validator.
|
||||
Additional discovered callers also require a documented disposition.
|
||||
- Trace one extraction, one no-model operation, scene-plan correction, and
|
||||
reconciliation end to end. Confirm that integrations no longer choose the
|
||||
shared lifecycle and that native validation/admission remain upstream-owned.
|
||||
- Verify one convenient and one custom correction path; final-evaluation
|
||||
diagnostics; no stale candidate on failed corrections; current-source reuse;
|
||||
fallback disclosure/ineligibility; required evidence and supplied observation;
|
||||
and the tested non-D&D author example. Prefer existing sufficient behavioral
|
||||
tests to additional matrices or private-structure assertions.
|
||||
- Review diffs for unintended schema/config/CLI/output changes, new restrictions,
|
||||
fallback eligibility changes, weakened optional checks, and out-of-scope audit
|
||||
work. Keep only changes needed for the selected boundary and identified bugfix.
|
||||
- Report checks performed, unresolved implementation defects if any, and remaining
|
||||
audit work. Completion requires no known unfinished item from this plan. Do not
|
||||
tag/release, push, or delete planning documents as part of acceptance.
|
||||
|
||||
**Commands:**
|
||||
|
||||
```sh
|
||||
go test ./...
|
||||
go vet ./...
|
||||
go build ./cmd/notarius
|
||||
go test -race ./internal/framework/pipeline ./internal/framework/semanticreconcile ./internal/modules/dnd/validate/scenedescriptions/combat_semantics
|
||||
git diff --check
|
||||
```
|
||||
|
||||
The ordinary build can leave an ignored root binary; do not stage generated
|
||||
artifacts. Check maintained example loading, native prompt dependency preflight,
|
||||
and CLI recovery/report behavior through their existing offline tests. Inspect
|
||||
documentation links manually or with available repository checks; do not add a
|
||||
new tooling dependency solely for this sprint.
|
||||
|
||||
**Acceptance:** Full offline tests, vet, build, and focused race checks pass;
|
||||
the author-facing API, production callers, documentation, and catalog agree.
|
||||
The target is established by implementation and behavioral evidence, not by
|
||||
smaller files, fewer callbacks, or an unchanged happy-path output alone.
|
||||
|
||||
## Open Questions
|
||||
|
||||
None. Scope and policy choices are settled in the feature roadmap. Stage 1
|
||||
selects concrete Go signatures using the prescribed ownership and representative
|
||||
callers; that is bounded implementation design, not an unresolved product decision.
|
||||
Reference in New Issue
Block a user