# Reliability and Maintainability Review Remediation
|
||
|
||
**Reviewed revision:** `e8c0708`
|
||
|
||
**Status:** Eight open findings from the review of all 20
|
||
[implementation stages](implementation.md) against the
|
||
[target roadmap](reliability-and-maintainability.md) and the follow-up audit
|
||
of how those stages interact with existing callers and contracts.
|
||
|
||
## Review Result
|
||
|
||
The sprint established the target architecture. ConfigKit and native
|
||
CommandKit integrations handle configuration and inspection, and preflight
|
||
hands checked processing selections to the runner. Audita decodes and
|
||
normalizes transcripts directly and partitions them once. A bounded section
|
||
window allows proposal, validation, and repair to overlap within a stage.
|
||
The runner assigns final proposal indices in section order and commits edits
|
||
at the stage boundary. PromptKit owns model execution, backend admission,
|
||
retries, and repair history. Required publication uses checked destinations.
|
||
Ordinary reports use typed processing facts, while optional debug capture
|
||
retains interactions and decision history. CommandKit renders live progress.
|
||
|
||
The offline CLI build and full Go suite passed, as did targeted race checks
|
||
for the runner, LLM adapter, validators, report projection, diagnostics,
|
||
glossary, and CLI. The ordered repair artifact test also passed 150 repetitions
|
||
under the race detector. A built CLI returned status 2 with source diagnostics
|
||
for malformed PromptKit and application configuration across the delegated
|
||
commands and processing cases in the plan. Focused review probes reproduced
|
||
R1, R3, and R4. R2 and R5 follow from the versioned output contract and current
|
||
documentation.
|
||
|
||
The follow-up audit traced the new paths through CLI dispatch, the built-in
|
||
validator chains, model execution, publication, and report and debug readers.
|
||
Additional probes reproduced the case-variant input behavior in R4 and the
|
||
cross-component failures in R6–R8.
|
||
|
||
## Findings
|
||
|
||
### R1 — Include Later Delivery Failures in Writable Reports (P2)
|
||
|
||
**Affected plan:** Stage 4, item 3, and Stage 17, item 1.
|
||
|
||
**Evidence:** [Report publication](../../internal/core/diagnostics/output_session.go#L311)
|
||
renders a failed bundle using the failures accumulated at that point. Later
|
||
writes append to the returned error list, but the remaining reports and the
|
||
best-effort pass reuse the same bytes. The
|
||
[report projection](../../internal/framework/processreport/failures.go#L41)
|
||
can include secondary file failures only if publication supplies them.
|
||
|
||
**Reproduced behavior:** Start finalization with a processing failure. Make
|
||
`errors.yml` and `recoveries.yml` unwritable and let `report.md` succeed.
|
||
The returned error contains the processing failure and both delivery failures.
|
||
The renderer receives only the processing failure, so the writable report
|
||
omits the two already-observed failures. The same stale-bundle problem can
|
||
follow a report error that first switches a successful run to failed status.
|
||
|
||
**Required change:** Use the freshest observed failures at the report
|
||
publication boundary and make a bounded best-effort update of already-written
|
||
reports when their failure evidence becomes stale. Retain existing evidence
|
||
if rendering the updated failed bundle fails. Keep transcript-first,
|
||
nontransactional publication.
|
||
|
||
**Acceptance:** Extend the output-session regression to inspect the facts
|
||
rendered into a surviving report when an earlier failure is followed by a
|
||
second write failure. Check failure attribution and counts as well as status.
|
||
|
||
### R2 — Preserve the Version 1 Error Record Discriminator (P2)
|
||
|
||
**Affected plan:** Stage 17, item 1.
|
||
|
||
**Evidence:** [Report projection](../../internal/framework/processreport/report.go#L108)
|
||
adds a top-level `scope: interrupted` record to the
|
||
[version 1 error document](../integrations/output-files.md#error-and-recovery-records).
|
||
The baseline contract described `work_unit` and `run` records. An exhaustive
|
||
reader of those variants encounters a third variant under the same version.
|
||
The target asks to retain peer attribution and existing counts and schema.
|
||
Audita's [release policy](../policy/release.md#versioning-and-compatibility)
|
||
also preserves the documented output contract for minor and patch releases.
|
||
|
||
**Required change:** Keep the existing top-level variants. Carry available
|
||
peer interruption details as optional evidence on an existing record, for
|
||
example an optional sequence on the initiating run failure. Keep the primary
|
||
origin and peer origins separately identifiable and preserve the work-unit and
|
||
run-error counts. Treat a new top-level variant as an explicit contract change
|
||
if that representation is preferred.
|
||
|
||
**Acceptance:** Exercise a fatal operation and interrupted peer in one run.
|
||
Check that a consumer of the existing record variants can still read the
|
||
report, and that the peer's available phase, reason, and origin remain present.
|
||
|
||
### R3 — Use the Same Missing-Reason Fallback in Run Reports (P3)
|
||
|
||
**Affected plan:** Stage 12, item 2, and Stage 17, item 1.
|
||
|
||
**Evidence:** [Operation projection](../../internal/framework/structuredoutput/failure.go#L42)
|
||
uses `internal_failure` when a typed model failure has no reason and retains
|
||
its original class and cause. [Run-failure projection](../../internal/framework/processreport/failures.go#L16)
|
||
recognizes a typed failure only when its reason is nonempty. It can then derive
|
||
a different reason from a wrapped cause or the processing phase.
|
||
|
||
**Reproduced behavior:** A typed fatal failure with an empty reason and a
|
||
wrapped `context.DeadlineExceeded` is recorded on the operation as
|
||
`fatal` / `internal_failure` and serialized in the run report as
|
||
`canceled`. The cause is available, but it does not make this a parent
|
||
cancellation.
|
||
|
||
**Required change:** Share the typed reason projection and its empty-reason
|
||
fallback. Derive a reason from the raw cause only when a typed failure is absent.
|
||
|
||
**Acceptance:** Verify matching fallbacks for the operation and the run record
|
||
and retain the phase, origin, and original cause. Keep genuine parent
|
||
cancellation distinct.
|
||
|
||
### R4 — Preserve Effective Transcript Members During Typed Decoding (P3)
|
||
|
||
**Affected plan:** Stage 5, item 1.
|
||
|
||
**Evidence:** The baseline selected the final value of an exact duplicate JSON
|
||
member when it decoded the segment into a generic object, before applying
|
||
field types. [Typed transcript decoding](../../internal/core/schema/transcript.go#L39)
|
||
now applies the field type to every occurrence. An earlier type error survives
|
||
even when the final value is valid. The refactor was meant to retain accepted
|
||
inputs while improving numeric fidelity.
|
||
|
||
**Reproduced behavior:** The baseline at `d226bdd` accepts
|
||
`[{"speaker":17,"speaker":"A","text":"hello","start":0,"end":1}]` and reads
|
||
speaker `A`. The sprint revision rejects the same input because of the
|
||
superseded numeric value.
|
||
|
||
The follow-up audit also found a silent change when known member names differ
|
||
only by case. For a segment containing `"text":"expected utterance"` followed
|
||
by `"TEXT":"other metadata"`, the baseline passes `expected utterance` to
|
||
normalization. The new decoder passes `other metadata`. Both accept the input.
|
||
The old map round trip ordered the member names before typed decoding. Direct
|
||
decoding applies them in input order.
|
||
|
||
**Required change:** Preserve the effective-member behavior for existing
|
||
inputs without reviving whole-transcript generic decoding or float conversion
|
||
for IDs. Keep the compatibility handling focused on this changed boundary.
|
||
|
||
**Acceptance:** Cover an earlier superseded type mismatch and a type mismatch
|
||
in the effective member, plus the case-variant example in both member orders.
|
||
Keep the existing exact-ID and unknown-field tests for both input envelopes.
|
||
|
||
### R5 — Align Roadmap Status and Runtime Guidance (P3)
|
||
|
||
**Affected plan:** Stages 15, 19, and 20.
|
||
|
||
**Evidence:** The [feature roadmap](reliability-and-maintainability.md) still
|
||
describes the implementation as pending despite the completed sprint.
|
||
The [pipeline guide](../internal/pipeline.md) says work-unit
|
||
evidence preserves each peer's interruption or error. The runner preserves
|
||
available outcomes and projects detailed work units according to output
|
||
selection. The [CLI guide](../cli.md#inspection-and-outcomes) contains a
|
||
literal `\n` between “selected” and “profiles.”
|
||
|
||
**Required change:** Mark the roadmap with the landed sprint and this review,
|
||
while retaining its historical baseline context. Describe interruption detail
|
||
in terms of outcomes actually available and selected for retention. Fix the
|
||
CLI sentence and keep public guidance focused on the operator-visible behavior.
|
||
|
||
**Acceptance:** The roadmap and implementation status agree, the pipeline guide
|
||
reflects the evidence modes, and the CLI paragraph renders normally.
|
||
|
||
### R6 — Keep Progress Writes Outside Model Operation Deadlines (P2)
|
||
|
||
**Affected plan:** Stages 12 and 19.
|
||
|
||
**Evidence:** [Pipeline wiring](../../internal/cli/process_pipeline.go#L30)
|
||
calls [progress rendering](../../internal/cli/process_progress.go#L34)
|
||
synchronously from the [adapter's native observer](../../internal/framework/llm/adapter.go#L139).
|
||
PromptKit v0.23.1 starts the operation deadline before emitting the start
|
||
event, so a blocked or slow write to CommandKit's diagnostic stream spends
|
||
that operation's budget before the provider request starts.
|
||
|
||
**Reproduced behavior:** With a 500 ms model-operation timeout and an immediate
|
||
loopback provider, the ordinary run dispatched three requests and changed
|
||
`hello world` to `Hello world`. With `--progress` and a diagnostic writer that
|
||
delayed the proposal-start message by 750 ms, Audita dispatched zero requests,
|
||
reported `operation_timeout`, and returned the uncorrected transcript with
|
||
status 0 under the existing recoverable-failure policy. The writer eventually
|
||
succeeded in delivering the message.
|
||
|
||
**Required change:** Deliver progress outside PromptKit's timed model-call
|
||
observation path. Keep native observations for execution facts and use
|
||
application lifecycle boundaries for synchronous progress delivery, or another
|
||
delivery mechanism that keeps stderr waits out of the per-operation budget.
|
||
Preserve CommandKit's routing and presentation status, and keep the parent
|
||
context authoritative for cancellation of the invocation.
|
||
|
||
**Acceptance:** Vary only the delay on the progress stream of a controlled run.
|
||
Verify that it still dispatches and applies the same correction within the
|
||
model's own budget, and retain live progress and presentation-failure coverage.
|
||
|
||
### R7 — Classify Configuration Acquisition Errors Consistently (P2)
|
||
|
||
**Affected plan:** Stages 1, 11, and 20.
|
||
|
||
**Evidence:** The adopted `ckconfig` v0.8.0 and `ckprompt` v0.9.0 paths use
|
||
configuration diagnostics to distinguish invalid content from operational
|
||
errors. The existing [process entry point](../../internal/cli/process.go#L27)
|
||
uses `ckconfig.AdaptDiagnostics` for every `ConfigKit.LoadError`, then
|
||
unconditionally returns a usage outcome for those errors.
|
||
|
||
**Reproduced behavior:** A readable main file beside an unreadable automatic
|
||
`prompts.yml` produces `source.permission` in all three commands.
|
||
`promptkit list prompts` and `config show --scope promptkit` return status 1.
|
||
`process` returns status 2 and prints usage guidance for the same loading
|
||
failure.
|
||
|
||
**Required change:** Use the shared `ckconfig.ClassifyConfigurationError`
|
||
policy at the processing configuration boundary. Preserve typed causes and
|
||
source diagnostics for both outcome classes.
|
||
|
||
**Acceptance:** Compare `process` and representative delegated commands for an
|
||
operational acquisition failure and malformed YAML. Check status 1 and status
|
||
2 respectively, and preserve cancellation precedence and the diagnostic source.
|
||
|
||
### R8 — Use the Same Span Applicability With and Without Repair (P3)
|
||
|
||
**Affected plan:** Stages 8 and 9, with ledger projection in Stage 17.
|
||
|
||
**Evidence:** The [original-text validator](../../internal/framework/validators/deterministic.go#L38)
|
||
rejects an ambiguous require-unique span only when independent repair evidence
|
||
is enabled. Without repair, the existing shortlist forwards the candidate to
|
||
the [protected-term validator](../../internal/framework/validators/deterministic.go#L106),
|
||
which records approval even when it cannot obtain a usable preview. The
|
||
[LLM validator's request builder](../../internal/framework/validators/llm_validators.go#L251)
|
||
later rejects that same local ambiguity before dispatching a provider call.
|
||
|
||
**Reproduced behavior:** In the built-in grammar stage, offer to replace
|
||
`Mage Armor` with `ward` in `Mage Armor and Mage Armor`, with `Mage Armor`
|
||
protected. With a zero repair budget, the recorded decisions show protection
|
||
approval and `editorial_review` rejection for `ambiguous_original_text`.
|
||
With repair enabled, `original_text_presence` records the ambiguity and
|
||
protection emits no decision. Neither run applies the ambiguous proposal.
|
||
|
||
**Required change:** Give the local applicability check ownership of
|
||
require-unique ambiguity in both paths. Keep independent evidence and repair
|
||
attempts conditional on the configured budget. Retain the ability to assess
|
||
protection when a located edit produces an empty preview.
|
||
|
||
**Acceptance:** Use the built-in chain with zero and positive repair budgets.
|
||
Verify consistent local attribution, no unsupported protection approval,
|
||
and no model validation call for the inapplicable candidate. Keep repair
|
||
available in the positive-budget case.
|