# Remediation: forge boundary and credential preflight review
|
||
|
||
Status: remediation in progress; completion is recorded per issue below.
|
||
|
||
## Review baseline and scope
|
||
|
||
Reviewed `cbdba90`, including the implementation commits after `9d6952a`,
|
||
against the [feature roadmap](forge-boundary.md),
|
||
[implementation plan](implementation.md), and the user's selected scope.
|
||
This document records work identified by the review; it does not implement it.
|
||
|
||
A follow-up integration audit reviewed `72de187`. Its production source is
|
||
unchanged from `cbdba90`. That audit traced the new boundary and preflight
|
||
through existing CI preparation, module/tag selection, build receipts, token
|
||
loading, source publication, and retry/error handling. It added finding 5 and
|
||
expanded finding 3 with a later authorization-failure reproduction.
|
||
|
||
An algorithmic audit reviewed `370fe3a`, whose production source is still
|
||
unchanged from `cbdba90`. It added findings 6–8. These opportunities and defects
|
||
were retained when policy moved from the former Gitea implementation into
|
||
shared delivery.
|
||
|
||
The intended production boundary is present. The root facade owns neutral
|
||
destination selection and public preflight errors; `internal/forge` supplies
|
||
the backend contract; `internal/delivery` owns page/asset policy and recovery;
|
||
`internal/gitea` owns protocol operations; and `internal/artifact` owns local
|
||
declarations and content verification. Gitea remains the implemented backend.
|
||
Automatic and standalone preflight use read-only repository requests, and binary
|
||
CI checks access before dependency preparation. Source publication retains its
|
||
separate Git authentication and completion semantics.
|
||
|
||
## 1. Complete local destination preflight error handling — P2
|
||
|
||
Status: complete.
|
||
|
||
**Completed:** Added the facade-owned `DeliveryPreflightInvalidDestination`
|
||
classification, preserved the adapter's validation cause, and mapped it to CLI
|
||
status 2 for ordinary and CI delivery. Updated consumer/configuration guidance.
|
||
Focused standalone, automatic, and CLI regressions cover invalid URLs, owners,
|
||
and repository names, early termination, and absence of hosted/build work.
|
||
Focused preflight tests and the compiled API/dependency check passed.
|
||
|
||
**Evidence:** [Gitea preflight](../../internal/gitea/backend.go),
|
||
[public error conversion](../../delivery.go), and
|
||
[CLI error handling](../../cmd/releasekit/main.go).
|
||
|
||
`Backend.Preflight` returns `destinationAPI` validation errors directly. Those
|
||
errors are neutral `forge.Failure` values with `FailureInvalid`, rather than
|
||
classified preflight failures. `publicPreflightError` consequently passes them
|
||
through. Both CLI delivery paths treat the resulting unclassified error as
|
||
status 1.
|
||
|
||
A temporary consumer with an otherwise valid tagged source and a nonblank
|
||
synthetic token reproduced this with `base_url: "ssh://forge.example"`:
|
||
`PreflightDelivery` returned `*forge.Failure`, `errors.As` could not obtain a
|
||
`*DeliveryPreflightError`, and `deliver` exited 1. A malformed owner/repository
|
||
segment follows the same local validation path. No server request is needed to
|
||
identify these configuration problems.
|
||
|
||
This leaves the public preflight error description incomplete and conflicts
|
||
with the documented status 2 for profile/configuration failures. Operators
|
||
cannot reliably distinguish a locally invalid destination from an operational
|
||
verification failure through the new boundary.
|
||
|
||
**Required work:**
|
||
|
||
- Make deterministic destination-setting failures recognizable through the
|
||
facade and classify them as CLI configuration failures with status 2 in both
|
||
ordinary and CI delivery. Keep backend-specific validation in its adapter;
|
||
share its classification instead of duplicating Gitea rules in the CLI.
|
||
- Make GoDoc and the selected public error representation agree about local
|
||
configuration failures. Preserve useful causes and identify the invalid
|
||
setting; avoid labeling a malformed URL as a rejected token or an unavailable
|
||
service. Keep real service/transport failures at status 1.
|
||
- Add focused coverage for an invalid URL and invalid repository addressing,
|
||
including standalone preflight and the CLI mapping. Verify early failure,
|
||
`not_attempted` delivery state, and absence of hosted requests/build work.
|
||
|
||
This correction concerns existing destination rules and failure classification;
|
||
it adds no token-format restriction, remote permission requirement, or probe.
|
||
|
||
## 2. Protect the runtime boundary from the new forge contract — P2
|
||
|
||
Status: complete.
|
||
|
||
**Completed:** Added `forge` to the runtime dependency exclusions and covered
|
||
both direct and transitive forbidden dependencies with focused graph fixtures.
|
||
The complete checker test package and the actual compiled API/dependency check
|
||
passed; the current runtime dependency graph remains accepted.
|
||
|
||
**Evidence:** [dependency checker](../../internal/apicheck/main.go), especially
|
||
`forbiddenRuntimeDependency`, and the runtime boundary in
|
||
[architecture policy](../policy/architecture.md#runtime-version-boundary).
|
||
Implementation Stage 9 also calls for keeping the new delivery packages out of
|
||
the runtime dependency graph through the existing checking mechanism.
|
||
|
||
The checker excludes named delivery implementations such as `gitea` and
|
||
`delivery`, but its runtime exclusion list omits the newly added `forge`
|
||
package. A temporary test overlay supplied this package graph:
|
||
|
||
```text
|
||
buildinfo -> internal/forge
|
||
```
|
||
|
||
`checkImportDirections` returned nil. The graph would make the runtime facade
|
||
depend on the release backend contract while the advertised boundary check
|
||
continued to pass. The actual current `buildinfo` graph remains appropriately
|
||
small; the gap is in the planned regression protection.
|
||
|
||
**Required work:**
|
||
|
||
- Extend the existing runtime check to exclude the new forge delivery contract.
|
||
Retain the existing policy for legitimate runtime dependencies.
|
||
- Add a focused fixture showing rejection of a runtime dependency on
|
||
`internal/forge`, including traversal through a small intermediary where
|
||
needed to protect the existing transitive rule. Retain the passing actual
|
||
repository check.
|
||
|
||
This enforces the already selected separation from orchestration. It does not
|
||
require a new public package restriction or a broader dependency policy.
|
||
|
||
## 3. Qualify phase-specific CLI exit-status documentation — P3
|
||
|
||
Status: complete.
|
||
|
||
**Completed:** Qualified the CLI reference and unreleased v0.6.0 note by phase:
|
||
local loading/classified preflight errors use status 2; later known failures
|
||
use 1; unresolved writes retain 3 even when canceled. Added a narrow CLI
|
||
regression for preflight versus later authorization failure and cancellation
|
||
after an attempted page write. Focused CLI preflight/recovery tests passed.
|
||
|
||
**Evidence:** [CLI exit statuses](../cli.md),
|
||
[v0.6.0 release note](../releases/v0.6.0.md),
|
||
[write evidence](../../internal/gitea/backend.go),
|
||
[asset reconciliation](../../internal/delivery/remote_assets.go), and
|
||
[CLI delivery mapping](../../cmd/releasekit/main.go).
|
||
|
||
The new CLI prose and release note broadly state that cancellation returns
|
||
status 1. That is correct for preflight and preparation cancellation. After a
|
||
possibly successful write, cancellation can prevent reconciliation and leave
|
||
delivery unknown; the CLI correctly returns status 3 in that case.
|
||
|
||
A temporary shared-delivery test supplied an attempted uncertain upload with
|
||
`context.Canceled` and an unavailable canceled reconciliation. It returned
|
||
`State == Unknown`, retained the cancellation cause, and placed the asset in
|
||
`Uncertain`. The CLI's unknown-state branch maps that result to 3.
|
||
|
||
The broad documentation introduces a stronger cancellation guarantee than the
|
||
requested preflight behavior and conflicts with preserved write recovery.
|
||
|
||
The same integration issue affects the unqualified statement that credential
|
||
failures return status 2. With valid tagged source, a synthetic 401 on the first
|
||
repository preflight read returned status 2. When both repository preflight
|
||
reads succeeded and the hosted-tag read then returned 401, ordinary delivery
|
||
returned status 1. Later provider failures retain the existing delivery error
|
||
path and are not `DeliveryPreflightError` values. Successful preflight cannot
|
||
guarantee that authorization will remain valid during later operations.
|
||
|
||
**Required work:**
|
||
|
||
- Scope status 1 wording to preflight/preparation cancellation and cancellation
|
||
that leaves no unresolved write. State that an unresolved write retains
|
||
status 3, including when cancellation prevented verification.
|
||
- Align the CLI reference and unreleased v0.6.0 note. Keep implementation
|
||
behavior and unknown-write recovery intact.
|
||
- Qualify credential/access status 2 as applying to local credential loading
|
||
and classified preflight failures. Describe later authorization failures
|
||
through the existing delivery outcomes: known failure can return 1, while an
|
||
unresolved write retains 3. Do not reclassify later failures as preflight
|
||
failures or erase partial progress to satisfy overbroad prose.
|
||
- Reuse existing cancellation/recovery tests. If CLI coverage does not already
|
||
distinguish these cases, add a narrow case protecting unknown-write status
|
||
after cancellation; avoid an expanded cancellation matrix.
|
||
|
||
## 4. Align roadmap completion records — P3
|
||
|
||
Status: complete.
|
||
|
||
**Completed:** Marked the feature roadmap's implementation complete, labeled
|
||
both planning baselines as historical, and linked both plans to this
|
||
remediation record. Reviewed the status wording against the completed stages
|
||
and retained the plans for release-preparation cleanup.
|
||
|
||
**Evidence:** [feature roadmap](forge-boundary.md) and
|
||
[implementation plan](implementation.md).
|
||
|
||
The implementation plan marks all ten stages complete, while the feature
|
||
roadmap still says implementation has not started. The plan's introductory
|
||
baseline text also uses present-tense descriptions of the old implementation
|
||
and says the neutral destination and preflight are planned.
|
||
|
||
**Required work:** Mark the feature roadmap's implementation status accurately
|
||
and clearly label the implementation plan's original baseline as historical.
|
||
Keep these records consistent with the completed stages and remaining
|
||
remediation. Roadmap retirement can follow the existing release-preparation
|
||
cleanup; this finding does not require removing plans now.
|
||
|
||
## 5. Bind CI release identity before online preflight and preparation — P2
|
||
|
||
Status: complete.
|
||
|
||
**Completed:** CI now derives the selected module identity from the verified
|
||
event commit and checks the complete tag before credential loading, forge
|
||
requests, or dependency preparation. The optional launcher-module guard and
|
||
delivery's later source/preflight verification retain their responsibilities.
|
||
A focused page-only/binary regression covers a matching launcher selection
|
||
with a mismatched derived tag and verifies no forge or Go-tool work. That test
|
||
and existing valid CI/preflight/managed-delivery tests passed.
|
||
|
||
**Evidence:** [CI adapter](../../cmd/releasekit/main.go), especially
|
||
`runCIDelivery` and `checkExpectedModule`, and the existing identity/tag checks
|
||
in [shared delivery](../../internal/delivery/delivery.go).
|
||
|
||
Binary `ci-deliver` invokes standalone credential preflight and application
|
||
dependency preparation before `Deliver` derives the selected module's tag and
|
||
checks it against the CI event tag. `PrepareTaggedCheckout` proves that the
|
||
supplied Git tag and commit agree; it does not prove that this is the release
|
||
tag derived from the profile's module. The optional expected-module guard
|
||
compares selected directories and also does not establish that relationship.
|
||
|
||
A temporary CLI fixture had a clean tagged checkout at `v1.2.3`, a profile
|
||
selecting committed module `child`, and valid repository credentials. The
|
||
selected module's derived tag was `child/v1.2.3`. With `--prepared` and
|
||
`--expected-module child`, both profile variants eventually returned the same
|
||
tag-mismatch error, but their earlier effects differed:
|
||
|
||
| Profile | Forge requests | Dependency preparation |
|
||
| --- | --- | --- |
|
||
| Page-only | None | Skipped |
|
||
| Binary | Two credential-preflight reads | Invoked before the mismatch was reported |
|
||
|
||
Neither variant made a hosted release write; the existing late guard still
|
||
prevents delivery under the wrong module tag.
|
||
|
||
The dependency command was intercepted by a temporary local Go wrapper;
|
||
no application dependencies were fetched for the reproduction. A real binary
|
||
job can perform avoidable downloads or let a preparation failure obscure the
|
||
already determinable identity mismatch. A preflight credential failure can
|
||
likewise hide the source-selection error.
|
||
|
||
Dependency preparation already preceded this guard before the feature work.
|
||
The new standalone preflight adds hosted credential requests to that existing
|
||
ordering gap. Page-only delivery continues to reach the shared identity check
|
||
before any hosted requests, so the integration now has inconsistent early
|
||
validation behavior across the two supported CI paths.
|
||
|
||
**Required work:**
|
||
|
||
- After verifying the event checkout and loading its profile, derive the
|
||
committed selected-module release identity and apply the existing full-tag
|
||
comparison before the first forge probe or application dependency download.
|
||
Reuse the existing identity derivation and keep the optional launcher-module
|
||
comparison's responsibility separate.
|
||
- Preserve credential preflight before expensive dependency/build work, with
|
||
normal delivery verification after preparation. This moves an existing
|
||
acceptance check earlier; it adds no module map, source-publication gate,
|
||
candidate test suite, or extra requirement to standalone `PreflightDelivery`.
|
||
- Add a focused CI regression for a valid Git tag/commit and matching
|
||
`--expected-module` whose derived module tag differs. Cover page-only and
|
||
binary profiles, asserting the identity diagnostic and absence of forge
|
||
requests or dependency preparation. Retain the valid binary path's early
|
||
credential check and subsequent delivery behavior.
|
||
|
||
## 6. Make pending-asset bookkeeping linear — P3
|
||
|
||
Status: open.
|
||
|
||
**Evidence:** `uploadMissingAssets`, `reconcileAssetUpload`, and
|
||
`removeIdentity` in [shared asset delivery](../../internal/delivery/remote_assets.go).
|
||
|
||
Every acknowledged upload removes its filename from `result.Pending` through
|
||
`removeIdentity`. That helper searches the slice and shifts its remaining tail.
|
||
For `k` initially missing assets uploaded successfully in their pending order,
|
||
the searches find the first element immediately, but the deletions still move
|
||
`(k-1) + (k-2) + ... + 1 = k(k-1)/2` identities. Bookkeeping alone is therefore
|
||
Theta(`k²`), independently of network and content processing. A different
|
||
pending order can also incur repeated linear searches. Reconciled uploads use
|
||
the same removal helper.
|
||
|
||
**Refactoring opportunity:** Track pending membership or per-filename state in
|
||
a map, update it in expected constant time per completed/reconciled upload,
|
||
and materialize `Pending` with one pass through the initial pending order when
|
||
returning. For `n` declarations, this permits O(`n`) total category bookkeeping
|
||
and O(`n`) metadata space. Keep the current category ordering during this
|
||
refactor; a final pass avoids repeated shifts without requiring swap deletion.
|
||
Apply finalization to every return path so partial, conflicting, and unknown
|
||
outcomes retain later missing assets and disjoint categories.
|
||
|
||
Existing progress/reconciliation tests should remain useful. Add a focused
|
||
case only if needed to protect pending results after early termination. The
|
||
usual small target sets limit practical impact; this finding establishes an
|
||
avoidable asymptotic cost without claiming measured release-time savings.
|
||
|
||
## 7. Order the missing upload set once — P3
|
||
|
||
Status: open.
|
||
|
||
**Evidence:** `orderedExpected`, `orderMissing`, and `uploadMissingAssets` in
|
||
[shared asset delivery](../../internal/delivery/remote_assets.go).
|
||
|
||
`orderedExpected` copies and sorts all `n` declarations before validation and
|
||
classification. This happens even when every asset matches, a conflict stops
|
||
delivery, or an unverifiable asset prevents uploads. If uploads proceed, the
|
||
coordinator copies and sorts the full list again, then skips entries outside
|
||
the missing set. The first full sort requires O(`n log n`) comparisons in the
|
||
worst case. The second sort receives already ordered input, so its actual cost
|
||
can be lower, but its full-list copy and ordering pass are still redundant.
|
||
|
||
**Refactoring opportunity:** Collect declarations without ordering, validate
|
||
and classify them in a linear pass, and return immediately when classification
|
||
prevents or eliminates uploads. Collect only the `k` missing declarations and
|
||
sort that worklist once, retaining filename order and `SHA256SUMS` last.
|
||
Declaration/classification/ordering work becomes O(`n + k log k`), with O(`n`)
|
||
metadata space, and O(`n`) work when no upload is needed. This also removes
|
||
redundant full-list copies. These bounds treat filename operations as unit
|
||
cost and exclude inline-content hashing, which remains linear in its bytes.
|
||
|
||
Keep complete sorted manifest generation and all validation. The plan selected
|
||
the upload ordering and manifest format; this opportunity concerns the size
|
||
and duplication of the scheduling work, not either selected behavior. The
|
||
existing ordering, matching-manifest, and no-write-on-conflict tests cover the
|
||
main behavior that the refactor should preserve. Combined with finding 6,
|
||
successful upload coordination can avoid its quadratic bookkeeping term.
|
||
|
||
## 8. Preserve asset-inspection failure causes during aggregation — P2
|
||
|
||
Status: open.
|
||
|
||
**Evidence:** `inspectRemoteAssets` and `uploadMissingAssets` in
|
||
[shared asset delivery](../../internal/delivery/remote_assets.go), and the
|
||
cause-preservation requirement in the
|
||
[implementation plan](implementation.md#internal-ownership-and-dependencies).
|
||
|
||
An asset-open or content-read failure is retained in `AssetInspection.Err` and
|
||
classified as `AssetUnverifiable`. `uploadMissingAssets` then discards those
|
||
errors and returns a fresh generic `FailureUnverifiable` message. `Deliver`
|
||
returns that aggregate error, so callers lose the underlying diagnostic and
|
||
cannot use `errors.Is` or `errors.As` to recognize its cause.
|
||
|
||
A temporary test overlay supplied one existing asset whose `OpenAsset` returned
|
||
`context.Canceled`, then repeated the case with a distinct read-failure
|
||
sentinel. Inspection retained each cause. Aggregation correctly reported
|
||
`NotAttempted`, one uncertain asset, and no uploads, but `errors.Is` could find
|
||
neither cause in its returned error. Whole-list failures already return their
|
||
original cause directly; this finding concerns per-asset failures folded into
|
||
an otherwise successful inspection.
|
||
|
||
**Required work:** Collect relevant non-nil observation errors during the
|
||
existing classification pass and wrap or join them with the aggregate summary.
|
||
Preserve actionable asset context, cancellation identity, and the existing
|
||
conflict precedence, asset categories, and delivery states. Read-only failures
|
||
remain distinct from unresolved writes. This takes O(`n`) traversal and O(`u`)
|
||
error references for `u` unverifiable observations, without a new public error
|
||
type or protocol operation. Retain a focused regression asserting cause
|
||
identity through the returned delivery error, including cancellation.
|
||
|
||
## Verification performed
|
||
|
||
Using Go 1.26.10 on linux/amd64 with module/toolchain downloads disabled:
|
||
|
||
- `go test ./...` passed.
|
||
- `go run ./internal/apicheck` passed for the current repository.
|
||
- `go test -race ./internal/delivery ./internal/gitea` passed.
|
||
- Temporary review fixtures reproduced findings 1 and 2, and confirmed the
|
||
cancellation outcome underlying finding 3. The runtime-boundary reproduction
|
||
intentionally failed its assertion because the prohibited graph was accepted.
|
||
- An additional temporary HTTP/1.1 and HTTP/2 check confirmed that a large upload
|
||
rejected before its body was consumed returns promptly as a known rejection;
|
||
that investigated path produced no finding.
|
||
|
||
Temporary fixtures and test overlays were kept outside the checkout. No
|
||
implementation files or permanent tests were changed during this review.
|
||
|
||
### Follow-up integration audit
|
||
|
||
The same Go 1.26.10 toolchain and offline environment were used. Existing full
|
||
suite, API-boundary, and focused race results above remain applicable because
|
||
the production source was unchanged. Additional checks comprised:
|
||
|
||
- A fresh CLI integration run covering tagged CI preparation, managed/prebuilt
|
||
delivery and stale receipts, module-relative output, multi-module dispatch,
|
||
Woodpecker workflows, and source-tool bootstrap; all selected tests passed.
|
||
- Focused token-file precedence, repository-root token-file loading,
|
||
forbidden-file validation, and check/publication integration tests passed.
|
||
- Temporary CLI fixtures demonstrating finding 5 and the initial-versus-later
|
||
401 exit-status difference in finding 3, using a local HTTP server and an
|
||
intercepted dependency command.
|
||
|
||
The build, receipt, publication, candidate-validation, dependency-preparation,
|
||
and Go-tool implementation owners were also compared with the pre-feature
|
||
baseline. Their production code is unchanged; the confirmed new interaction
|
||
occurs in the CI adapter's composition and the phase-specific error contract.
|
||
|
||
### Algorithmic audit
|
||
|
||
The audit covered the implemented plan's facade/CLI adaptation, backend
|
||
contract and preflight, page coordination/recovery, local artifact mechanics,
|
||
remote inspection/upload bookkeeping, Gitea read/write transport, and dependency
|
||
checks. It compared the moved code with the pre-feature baseline. Bounds below
|
||
describe collection/content work with ordinary expected constant-time map
|
||
operations and unit-cost metadata comparisons; variable-length names and URLs
|
||
add their corresponding byte-processing costs.
|
||
|
||
| Reviewed operation | Assessment |
|
||
| --- | --- |
|
||
| Remote asset inspection | Expected O(`n + r + B`) time for `n` declarations, `r` listed assets, and `B` downloaded bytes; filename maps avoid nested list searches, and content hashing is streamed. |
|
||
| Artifact declaration and local verification | Map-based identity/duplicate checks are linear; hashing is linear in content bytes. Complete manifest sorting remains the selected O(`n log n`) algorithm. |
|
||
| Page matching and recovery | Note comparisons are linear in note bytes; shared coordination uses the selected bounded follow-up lookup. |
|
||
| Gitea adaptation and transport | Metadata conversion is linear in listed entries; uploads stream bytes. Redirect tracking uses a visited map rather than repeated scans. |
|
||
| Facade result conversion and dependency checks | Result conversion is linear in category entries. Dependency traversal uses visited sets from a fixed number of roots, O(`V + E`) in the reachable graph. |
|
||
| Upload scheduling and pending state | Findings 6 and 7 identify avoidable work beyond the selected ordering and recovery behavior. |
|
||
|
||
The audit preserved explicitly selected algorithms: complete sorted manifests,
|
||
filename upload ordering with the manifest last, full local verification before
|
||
writes, streamed remote comparisons, one follow-up reconciliation per ambiguous
|
||
write, current asset listing behavior, and fresh credential checks around CI
|
||
preparation. It proposes no batching, pagination, concurrency, validation cache,
|
||
or altered recovery policy.
|
||
|
||
Fresh offline tests for `internal/delivery`, `internal/artifact`, and
|
||
`internal/gitea` and the API/dependency-boundary check passed. A temporary
|
||
overlay intentionally failed two cause-preservation assertions to reproduce
|
||
finding 8; it was removed after the check. Findings 6 and 7 follow from
|
||
source-level operation counts. No benchmarks
|
||
or real-world performance measurements were run, and no production code or
|
||