Clarify shared history migration and sprint acceptance
This commit is contained in:
@@ -163,9 +163,14 @@ changed.
|
||||
|
||||
Keep the contextual meaning of parsed numeric tokens across historical states
|
||||
and the one-entry-per-canonical-pointer enumeration of `HistoricalPaths`.
|
||||
Indexes and compact derived records may remain, but their attribution must come
|
||||
from the shared evidence. Metadata queries should not require full configuration
|
||||
replay or YAML rendering to obtain definition and origin records.
|
||||
Historical-path membership and enumeration must also derive from the shared
|
||||
evidence. Preserve the existing inventory of default-only paths, displaced
|
||||
descendants, consumed inheritance controls, and historical mapping-key and
|
||||
sequence-index shapes, including evidence that a public projection coalesces or
|
||||
omits. Indexes and compact derived records may remain, but their membership and
|
||||
attribution must come from that evidence. Metadata queries should not require
|
||||
full configuration replay or YAML rendering to obtain definition and origin
|
||||
records.
|
||||
|
||||
#### Distinct Public Projections
|
||||
|
||||
@@ -197,6 +202,8 @@ the following owners to their replacements:
|
||||
| Current owner | Required change |
|
||||
| --- | --- |
|
||||
| History-building portions of `metadataFromDecoded`, `applyOverlayMetadata`, and `appendPostDecodeCLIHistory` in [load_metadata.go](../../internal/engine/load_metadata.go) and [override_context.go](../../internal/engine/override_context.go) | Produce or project shared evidence instead of independently reconstructing pointer-keyed histories. Retain effective-field construction where it is still needed. |
|
||||
| Resolution-history construction in `applyResolutionMetadata` and `appendResolutionDescendantHistory` in [load_metadata.go](../../internal/engine/load_metadata.go) | Derive resolution records and previous origins through common semantic selection and attribution. Retain the effective-field updates still needed by final metadata. |
|
||||
| Historical-path inventory in `finalizeMetadataPaths` in [metadata.go](../../internal/engine/metadata.go) | Derive historical membership, shape indexes, and enumeration from the shared evidence while preserving the existing path inventory. Retain effective-path indexing where needed. |
|
||||
| Previous-origin reconstruction and inheritance insertion in [inheritance_history.go](../../internal/engine/inheritance_history.go) | Use common semantic selection and attribution while preserving the existing inheritance projection rules. |
|
||||
| Relevance and chronology orchestration in [explain.go](../../internal/engine/explain.go) | Consume the shared model; retain useful value reconstruction and redaction helpers. |
|
||||
| Separate published inheritance evidence for metadata and explanation in [load_result.go](../../internal/engine/load_result.go) | Consolidate under the frozen history owner where independent copies are unnecessary; keep required output detachment. |
|
||||
@@ -232,6 +239,12 @@ a full document copy per event, a new quota, or a new concurrency guarantee.
|
||||
Reduced duplication is a design benefit to evaluate, not a promised memory or
|
||||
speed improvement.
|
||||
|
||||
Preserve final retained-history budget admission before effective secret lookup
|
||||
and application validation. Do not defer that check to publication or a later
|
||||
query. Count the resulting retained ownership graph; tests should exercise its
|
||||
budget boundary and failure timing without requiring obsolete duplicate copies
|
||||
or the old representation's exact node totals.
|
||||
|
||||
### 4. Preserve Composition Claimant Order Through Diagnostics
|
||||
|
||||
Keep the order produced by `compositionConflictDiagnostic` in
|
||||
@@ -275,9 +288,16 @@ dependency-ready scheduling unchanged.
|
||||
6. Review the integrated result, run applicable development checks, and update
|
||||
affected implementation documentation and finding status.
|
||||
|
||||
These are high-level dependencies, not a requirement to combine unrelated fixes
|
||||
in one commit. The implementation plan should select concrete edits and test
|
||||
commands while keeping the four findings individually traceable.
|
||||
This work will be completed in one implementation sprint. Intermediate stages
|
||||
and commits need not be coherent or compile, and will not be made available to
|
||||
consumers. The order above describes dependencies within that sprint. It does
|
||||
not require temporary adapters or parallel implementations merely to keep each
|
||||
stage buildable.
|
||||
|
||||
Keep changes focused and the four findings individually traceable. Run focused
|
||||
checks when the affected surface is buildable, and complete any pending checks
|
||||
against the integrated result. The final sprint result must compile, pass the
|
||||
applicable development checks, and satisfy the full completion criteria below.
|
||||
|
||||
## Validation And Completion
|
||||
|
||||
@@ -294,8 +314,10 @@ The focused cases should cover:
|
||||
Check explicitness and recorded origins through final metadata and explanation.
|
||||
- Shape-changing CLI and resolution history, checking exact definitions,
|
||||
`Previous`, and genuine ancestor replacement/removal. Include contextual
|
||||
enumeration/query coverage and preserve existing inheritance and overlay cases;
|
||||
add another case only where those integrations expose an unprotected risk.
|
||||
enumeration/query coverage, including historical paths whose evidence is
|
||||
coalesced or omitted by a public projection. Preserve existing inheritance and
|
||||
overlay cases; add another case only where those integrations expose an
|
||||
unprotected risk.
|
||||
- Shared-model projections across composite mapping origins, typed decoding and
|
||||
default reconciliation, equal-valued writes, inheritance controls/transfers,
|
||||
mapped sequence replacements and removed descendants, and overlapping
|
||||
@@ -304,8 +326,9 @@ The focused cases should cover:
|
||||
agreement on attribution.
|
||||
- Historical sensitivity/dependency propagation, diagnostic source-location
|
||||
fallback, detached returned records, and complete retained-history accounting
|
||||
under the new ownership graph. Use small controlled budget cases and existing
|
||||
disclosure fixtures rather than memory or timing thresholds.
|
||||
under the new ownership graph. Preserve budget rejection before effective
|
||||
secret lookup and application validation. Use small controlled budget cases
|
||||
and existing disclosure fixtures rather than memory or timing thresholds.
|
||||
- A composition conflict whose acquisition and assembly orders differ, using the
|
||||
audit fixture. Check both published diagnostics and rendered related-location
|
||||
order, while retaining coverage for ordinary diagnostic canonicalization.
|
||||
@@ -318,9 +341,10 @@ No benchmark campaign, broader audit, or new release gate is part of this roadma
|
||||
Completion requires all four findings to have implementation and regression
|
||||
evidence, appropriate development checks, and both history interfaces deriving
|
||||
semantic attribution from the shared model. Review the final producer/consumer
|
||||
map to confirm superseded independent reconstruction has been removed and
|
||||
internal attribution readers have migrated. Passing the four defect regressions
|
||||
while retaining the old parallel attribution machinery is not completion.
|
||||
map to confirm superseded independent reconstruction has been removed,
|
||||
historical-path discovery derives from shared evidence, and internal attribution
|
||||
readers have migrated. Passing the four defect regressions while retaining the
|
||||
old parallel attribution machinery is not completion.
|
||||
|
||||
The audit's previous passing suite is not validation of these future changes.
|
||||
Scope here does not promise identical output from different inspection interfaces
|
||||
|
||||
Reference in New Issue
Block a user