From 029cb863280c37cb9688162e4542ddd5cba23ef4 Mon Sep 17 00:00:00 2001 From: Eric Rakestraw Date: Tue, 24 Nov 2026 15:18:19 +0000 Subject: [PATCH] Record concurrency audit findings --- docs/roadmap/audit/04-concurrency.md | 162 +++++++++++++++++++++++++++ 1 file changed, 162 insertions(+) create mode 100644 docs/roadmap/audit/04-concurrency.md diff --git a/docs/roadmap/audit/04-concurrency.md b/docs/roadmap/audit/04-concurrency.md new file mode 100644 index 0000000..b0782be --- /dev/null +++ b/docs/roadmap/audit/04-concurrency.md @@ -0,0 +1,162 @@ +# Concurrency Audit + +Reviewed on 2026-11-24 at source revision +`900d956aee54eb1e471358211107b3a132ffa6c8`. + +## Scope And Results + +Reviewed application-owned shared state, goroutine/channel ownership, +cancellation, shutdown, CLI acquisition/delivery, and concurrency-sensitive +tests. Used codebase-memory-mcp to locate concurrency primitives, state, and +their callers, then checked source and the relevant library contracts. +Checked PromptKit's public concurrency/observer contract in the selected +v0.25.0 module, rather than assuming a local upstream checkout matched it. +This was not an exhaustive audit of upstream library implementations. + +Two findings warrant consideration: the existing production artifact-reader +cancellation defect, reconfirmed across an actual HTTP connection, and a +test-only worker-lifetime weakness. No additional production data race, +deadlock, or unsafe channel operation was substantiated. Passing race tests +do not establish cancellation or liveness correctness. + +## Current Architecture + +ConfigKit resolves configuration before engine construction. CommandKit and +its integrations own native CLI acquisition and presentation; PromptKit owns +execution, retries, admission, and backend queues. The HTTP service constructs +one engine and shares it across requests. Handler options and restricted-reader +settings are initialized before serving; execution inputs and optional report +collectors are request-local. ReleaseKit owns release mechanics. See the +[component overview](../../internal/overview.md) and +[adapter internals](../../internal/adapters.md). + +## 1. File Acquisition Can Outlive Request Cancellation (P2, Previously Known) + +**Relevant code:** `restrictedArtifactReader.Read`, `readFileArtifact`, and +`readArtifactFile` in +[artifact_reader.go](../../../internal/adapter/http/artifact_reader.go), +lines 52–67, 84–96, and 123–148; their invocation through +`Handler.ServeHTTP` in +[handler.go](../../../internal/adapter/http/handler.go). + +**Circumstances:** A file read starts while its context is live, then the +client disconnects, an operation budget expires, or shutdown cancels the +request. The reader checks context only on entry and does not pass it to the +file helpers. An existing FIFO inside the allowed root can block opening or +remain in `io.ReadAll` while a writer keeps it open without completing input. +The configured byte limit does not bound that wait. + +**Consequences:** The HTTP handler/engine invocation can remain pending after +the request context is canceled, retaining a request goroutine and potentially +an open file until an external filesystem participant releases it. Repeated +abandoned requests can accumulate pending work in a long-running server. The +reader can subsequently return successful data despite cancellation. This is +not a claim that input preparation has already acquired a backend admission +slot, or that every synchronous filesystem call must stop immediately. + +**Evidence:** A temporary standalone diagnostic used the real HTTP handler and +restricted reader with a small Runner stub, a loopback HTTP connection, and a +synthetic FIFO. Opening its writer established that acquisition had passed the +initial context check. Canceling the HTTP client canceled the server request +context, but the handler was still pending after a bounded 200 ms observation. +Only writing and closing the FIFO released it; the reader returned a nil error +with `ctx.Err() == context.Canceled`. The diagnostic then joined the handler, +client, and server and completed under the race detector without a race report. +The real-engine operation-budget manifestation is already documented in +[finding 3 of the correctness audit](01-correctness.md#3-restricted-file-reads-discard-cancellation-and-can-stall-on-fifos-p2). +This is the same unresolved defect, not a second independent production bug. + +**Potential remediation:** Thread the context through acquisition and check it +during reads and before successful completion. Align unsupported-file handling +with the selected upstream ordinary reader, which avoids opening an existing +FIFO as a regular artifact. If non-regular streaming sources are intended, +their acquisition needs an explicitly cancellation-aware design. Preserve the +existing lexical-root and byte-limit policy. A goroutine wrapper that merely +abandons a blocked read would conceal, rather than fix, the lifetime problem. +No symlink sandbox, forced-interruption guarantee, or graceful-drain guarantee +is needed to address this defect. + +## 2. Shared-Capacity Test Does Not Own Workers On Failure Paths (P3, Test Only) + +**Relevant code:** `TestHandlerSharesBackendCapacityAcrossConcurrentRequests`, +particularly lines 1087–1118 of +[handler_test.go](../../../internal/adapter/http/handler_test.go), and its +`blockingLLMClient.Generate`, lines 437–456. + +**Circumstances:** The first handler runs in a goroutine with an uncancelable +request context. Its fake generator waits for `client.release` or context +cancellation. The test closes `release` only on the successful path, after +several assertions. An earlier `t.Fatal` bypasses that release and the normal +join. Separately, if a capacity regression admits the second request to the +blocking client, the test's synchronous second `ServeHTTP` call waits for the +release that the test will perform only after that call returns. That call has +no test-controlled deadline or cancellation. + +**Consequences:** A failing assertion can leave the first worker pending; +a capacity regression can stall the test instead of producing a bounded, +useful failure. The first-start and first-completion timers do not protect +the intervening synchronous call. This affects test reliability and regression +diagnosis, not production capacity enforcement. + +**Evidence:** Source inspection of the failure/control-flow paths. The current +successful path passed both the full race suite and five focused repetitions; +those runs do not exercise the missing failure cleanup. No capacity regression +was introduced to force this test to fail. + +**Potential remediation:** Give the requests test-controlled cancellable +contexts, register cleanup before launching the first worker, and cancel and +join owned work on failure as well as success. Bound the second request so +unexpected admission cannot trap the test before its cleanup runs. Keep one +clear owner for closing `release`, and retain the existing behavioral checks +for capacity rejection, shared peak concurrency, and response privacy. This +needs focused cleanup, not a new fixture framework or production time limit. + +## Other Ownership And Ordering Checks + +- **Server shutdown:** In `serveWithListener`, lines 57–64 of + [server.go](../../../internal/adapter/cli/server.go), the AfterFunc callback + writes `cancellationCloseErr` before closing `closed`. If stopping the callback + succeeds, it cannot run; otherwise the serving goroutine receives from + `closed` before reading the error. This supplies the required synchronization + without a mutex. Callback ownership and channel closure are single-owner. + `Server.Close` intentionally closes connections without joining arbitrary + context-ignoring handler work; that is the selected + [shutdown contract](../../operations.md#http-deployment-and-shutdown), not an + additional finding. +- **Shared engine and reader:** One engine is constructed before serving; + request overrides do not rewrite its defaults. PromptKit supports concurrent + runs and owns backend synchronization. Restricted-reader settings are + read-only during service, with per-call handles and bodies. Existing tests + protect cross-request admission, retry sharing, and canceled capacity waits. +- **Report observation:** Each opted-in request creates its own + [collector](../../../internal/report/report.go). PromptKit delivers observer + callbacks synchronously; the handler snapshots only after Run returns. + No collector is shared between requests or handed to an application-owned + background goroutine. Its lack of a mutex is not a race in this lifecycle. +- **CLI and configuration:** The bootstrap sink belongs to its invocation. + Server acquisition occurs before listening; native comparison effects are + sequential. The process environment is deliberately shared under ConfigKit's + native bootstrap semantics, not a per-request credential snapshot. No + concurrent reload path was found. Delivery is sequential and report-file + rendering occurs outside reporter callbacks, avoiding reentrant rendering. + Caller-owned output paths have no cross-process serialization contract. +- **Process and tests:** Signal-context registration is released with its + deferred stop function. Reviewed lifecycle tests use cancellation, channel + handoffs, and atomic counters; response/buffer reads follow completion on + their normal paths. The specific missing failure cleanup is identified above. + No parallel tests changing cwd/environment were found. The local release + launcher introduces no separate background-worker ownership. + +## Validation And Limits + +- Go 1.27.0 on Linux/amd64: `go test -race -count=1 ./...` passed. +- Five race-enabled repetitions of the existing server cancellation/bootstrap, + concurrent-report isolation, shared backend capacity, retry-capacity, and + canceled-capacity-wait tests passed. +- `go vet ./...` passed. Documentation links and whitespace were checked. +- The temporary cancellation diagnostic used no provider, credentials, or + external service; all its pending work was released and joined. +- No production code or repository tests were changed or added. Race detection + covers executed paths, not all schedules; this audit does not establish a + universal absence of races, deadlocks, or leaks in dependencies or unexercised + paths.