# Implementation Review Remediation
|
|
|
|
|
|
|
|
|
|
|
|
## ConfigKit v0.5.0 Review
|
|
|
|
|
|
|
|
|
|
|
|
Reviewed on 2026-10-03 at `bcf2ddf`, covering the five implementation
|
|
|
|
|
|
commits after `e1ce526`. The ConfigKit adoption and runtime ownership
|
|
|
|
|
|
boundaries match the accepted roadmap. No runtime defect, missing application
|
|
|
|
|
|
feature, or unrequested strengthening of contracts was identified. One
|
|
|
|
|
|
documentation handoff issue remains open below.
|
|
|
|
|
|
|
|
|
|
|
|
### R2: Correct The Completed Plan's Introductory Status
|
|
|
|
|
|
|
|
|
|
|
|
Priority: P3 (low). Status: Open.
|
|
|
|
|
|
|
|
|
|
|
|
Location: `docs/roadmap/implementation.md:5–9`.
|
|
|
|
|
|
|
|
|
|
|
|
The introduction still says "All five stages are pending" and directs the
|
|
|
|
|
|
reader to implement Stage 1 through Stage 5. Each stage is actually marked
|
|
|
|
|
|
Complete with completion evidence, and the feature roadmap identifies the
|
|
|
|
|
|
adoption as delivered. These contradictory directions leave the overall
|
|
|
|
|
|
handoff inaccurate and could lead a later coding agent to repeat completed
|
|
|
|
|
|
work.
|
|
|
|
|
|
|
|
|
|
|
|
This is a completion-documentation issue, not an unfinished runtime feature.
|
|
|
|
|
|
The [documentation policy](../policy/documentation.md) assigns implementation
|
|
|
|
|
|
status to roadmaps; the overall status should agree with the stage evidence.
|
|
|
|
|
|
|
|
|
|
|
|
Required change: update the introduction to state that all five stages are
|
|
|
|
|
|
complete. Describe the retained steps as implementation history and acceptance
|
|
|
|
|
|
evidence rather than instructions to start the work again. Preserve the
|
|
|
|
|
|
original planning baseline, completed stage records, deferred scope, and
|
|
|
|
|
|
separate release handoff. Do not change application code or rerun the feature
|
|
|
|
|
|
implementation to repair the wording.
|
|
|
|
|
|
|
|
|
|
|
|
Acceptance: the overall status, individual stages, and feature roadmap agree
|
|
|
|
|
|
that implementation is complete, while release preparation remains separate.
|
|
|
|
|
|
Review the documentation diff and run `git diff --check`; this correction
|
|
|
|
|
|
does not require new tests.
|
|
|
|
|
|
|
|
|
|
|
|
### Review Verification
|
|
|
|
|
|
|
|
|
|
|
|
- `go test -race -count=1 ./...` passed, including the new configuration,
|
|
|
|
|
|
inspection, and engine-adoption tests and existing shared-capacity coverage.
|
|
|
|
|
|
- `go vet ./...`, a native build outside the repository, and diff checks passed.
|
|
|
|
|
|
- All five maintained inheritance example commands succeeded with
|
|
|
|
|
|
`LOCAL_GPU_API_KEY` absent: validate, show, sources, explain, and render.
|
|
|
|
|
|
The child selected its own backend ID with the inherited endpoint, zero queue
|
|
|
|
|
|
capacity and false parameter remained explicit, and explanation retained
|
|
|
|
|
|
the parent/destination/directive relationship.
|
|
|
|
|
|
- Changed upstream documentation and notice links, affected local paths,
|
|
|
|
|
|
and the historical policy-plan reference resolved.
|
|
|
|
|
|
- The work set changes dependency pins, tests, examples, and documentation;
|
|
|
|
|
|
no production Go implementation was changed. ConfigKit v0.5.0 owns inheritance
|
|
|
|
|
|
through the existing single-load integration; Promptkit remains v0.11.2.
|
|
|
|
|
|
- The `extends` reservation is the explicitly accepted upstream compatibility
|
|
|
|
|
|
change, not a new Scriptorium restriction. Parameter and credential-reference
|
|
|
|
|
|
visibility, working-directory-relative paths, ordinary parent registration,
|
|
|
|
|
|
and existing shared server capacity remain as selected.
|
|
|
|
|
|
|
|
|
|
|
|
## Earlier Promptkit Upgrade Review (Resolved)
|
|
|
|
|
|
|
|
|
|
|
|
### Scope And Status
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
Review baseline: `e177d7c`, covering implementation commits after `5c3b0cf`.
|
2026-09-26 16:17:23 +00:00
|
|
|
|
This document records a resolved test-contract issue; it does not authorize
|
2026-09-26 16:14:16 +00:00
|
|
|
|
unrelated implementation changes. No runtime defect or missing planned feature
|
|
|
|
|
|
was identified in this review. Release preparation remains separate work.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
### R1: Remove The Unrequested Context-Identity Invariant
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
Priority: P3 (low). Status: Complete.
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
Original location: `internal/adapter/http/handler_test.go:334–349`,
|
2026-09-26 16:14:16 +00:00
|
|
|
|
`TestHandlerRunTimeoutValidationAndContextMapping`, introduced in `7de2b02`.
|
|
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
The test's `child` field and `(ctx != parent) != tc.child` assertion required
|
2026-09-26 16:14:16 +00:00
|
|
|
|
the exact parent context object for omitted/null/zero timeouts and a distinct
|
|
|
|
|
|
object for a positive timeout. The requested contract concerns effective
|
|
|
|
|
|
deadlines and cancellation propagation, not Go interface identity. In
|
|
|
|
|
|
particular, a harmless derived context that preserves the parent's deadline,
|
|
|
|
|
|
values, and cancellation would fail the omission cases despite satisfying the
|
|
|
|
|
|
application contract.
|
|
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
This elevated an incidental implementation choice into a test-enforced
|
2026-09-26 16:14:16 +00:00
|
|
|
|
invariant, contrary to the [agent policy](../policy/agents.md) and
|
|
|
|
|
|
[testing policy](../policy/testing.md). The current handler's context behavior
|
|
|
|
|
|
is correct; this is a maintainability issue, not a runtime cancellation bug.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
#### Required Change
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
Remove the identity comparison and the identity-only table field. Retain
|
|
|
|
|
|
behavioral assertions that an earlier parent deadline is not extended and
|
|
|
|
|
|
parent cancellation reaches execution. For omitted/null/zero values, verify
|
|
|
|
|
|
that no deadline is introduced when the parent has none. Retain coverage of
|
|
|
|
|
|
positive deadlines and the distinction between a canceled execution context
|
|
|
|
|
|
and a provider-attempt timeout while the execution context remains live.
|
|
|
|
|
|
|
|
|
|
|
|
Use the existing runner seam and focused cases; do not introduce a context
|
|
|
|
|
|
wrapper framework, timer abstraction, new public guarantee, or production
|
|
|
|
|
|
refactor solely to change this test.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
#### Completion Criteria
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
- Tests protect effective deadline/cancellation behavior without requiring
|
|
|
|
|
|
context object identity.
|
|
|
|
|
|
- A semantically equivalent derived context does not fail merely because it
|
|
|
|
|
|
is a different object.
|
|
|
|
|
|
- Existing timeout validation and HTTP outcome coverage remains intact.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
#### Resolution And Validation
|
2026-09-26 16:17:23 +00:00
|
|
|
|
|
|
|
|
|
|
Removed the identity-only table field and context comparisons. The test now
|
|
|
|
|
|
checks effective deadlines, including omitted/null/zero requests with no
|
|
|
|
|
|
parent deadline, and explicitly checks that parent cancellation reaches the
|
|
|
|
|
|
runner. Existing positive-deadline integration tests and live-context
|
|
|
|
|
|
provider-timeout mapping remain intact. No production code changed.
|
|
|
|
|
|
|
|
|
|
|
|
Focused HTTP timeout tests, `go test ./...`, `go test -race ./...`,
|
|
|
|
|
|
`go vet ./...`, a native build outside the repository, and `git diff --check`
|
|
|
|
|
|
all passed after remediation.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
### Original Review Verification
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
- `go test -race -count=1 ./...` passed, including retry, shared-capacity,
|
|
|
|
|
|
deadline, report, definition-conformance, and architecture-boundary tests.
|
|
|
|
|
|
- `go vet ./...` passed.
|
|
|
|
|
|
- A native `cmd/scriptorium` build passed, with output outside the repository.
|
|
|
|
|
|
- The selected dependency is Promptkit v0.11.0 with its intended v2 catalogs.
|
|
|
|
|
|
- Application code, tests, release automation, and historical releases were
|
|
|
|
|
|
not changed during this review.
|
|
|
|
|
|
|
|
|
|
|
|
The runtime ownership boundaries remain as intended: Promptkit owns framework
|
|
|
|
|
|
formats, execution, retries, and backend admission; Scriptorium owns executable
|
|
|
|
|
|
adapters, application settings, HTTP artifact policy, deadlines, and terminal
|
|
|
|
|
|
report presentation. No additional runtime restrictions, durable workflow
|
|
|
|
|
|
state, or extra release compliance gates were identified in the reviewed diff.
|