2026-10-03 17:52:18 +00:00
|
|
|
|
# Implementation Review Remediation
|
|
|
|
|
|
|
2026-10-04 13:57:36 +00:00
|
|
|
|
## PromptKit v0.12.0 Review
|
|
|
|
|
|
|
|
|
|
|
|
Reviewed on 2026-10-04 at
|
|
|
|
|
|
`58cb02f9732b09740ff7e22096d2a4072ddfddca`, covering the thirteen implementation
|
|
|
|
|
|
commits after `b1bb55a`. The runtime architecture matches the accepted
|
|
|
|
|
|
[feature roadmap](promptkit.md) and [implementation plan](implementation.md).
|
|
|
|
|
|
No runtime regression, missing framework capability, or newly imposed runtime
|
|
|
|
|
|
restriction was identified. Three low-priority documentation/help gaps need
|
|
|
|
|
|
correction. The first retains a loading guarantee that is incompatible with
|
|
|
|
|
|
the deliberately selected full-source engine construction.
|
|
|
|
|
|
|
|
|
|
|
|
### R3: Correct The Definition-Inspection Loading Contract
|
|
|
|
|
|
|
|
|
|
|
|
Priority: P3 (low). Status: Open.
|
|
|
|
|
|
|
|
|
|
|
|
Locations: `docs/cli.md:208–224`; related orientation in
|
|
|
|
|
|
`docs/internal/adapters.md:49–56`. The CLI wording was retained in `b913ef0`
|
|
|
|
|
|
despite the engine-wiring change in `0df2aad`.
|
|
|
|
|
|
|
|
|
|
|
|
The profile-inspection reference still says it never loads a prompt. Both
|
|
|
|
|
|
definition-inspection commands now construct the same complete selected engine
|
|
|
|
|
|
as execution. PromptKit resolves and validates all final definitions and
|
|
|
|
|
|
captures their message content before the selected inspection runs. Consequently,
|
|
|
|
|
|
an unused prompt with invalid syntax or an unreadable `content_file` can prevent
|
|
|
|
|
|
inspection of an otherwise valid profile. Prompt inspection's unqualified
|
|
|
|
|
|
claim that it does not resolve a profile also needs to distinguish engine
|
|
|
|
|
|
assembly from request-specific target resolution.
|
|
|
|
|
|
|
|
|
|
|
|
Evidence: inspecting a valid profile in a selected combined file with an
|
|
|
|
|
|
unused prompt referring to a missing message file exits 1 before emitting a
|
|
|
|
|
|
profile report. The existing
|
|
|
|
|
|
`TestProfileInspectionUsesCombinedSourcesAndValidatesUnusedPrompts` also
|
|
|
|
|
|
protects this intentional eager-validation boundary.
|
|
|
|
|
|
|
|
|
|
|
|
Required change: explain that both commands construct and validate the full
|
|
|
|
|
|
selected configuration, including unused definitions and message resources,
|
|
|
|
|
|
before inspecting the chosen definition. Preserve the distinction that they
|
|
|
|
|
|
do not prepare an execution request, load request-time schemas/artifacts,
|
|
|
|
|
|
resolve credential values, reserve capacity, or call a provider. Clarify that
|
|
|
|
|
|
no prompt collection is mandatory, but selected prompts are not ignored.
|
|
|
|
|
|
Align the internal summary with the CLI contract rather than restating a
|
|
|
|
|
|
stronger independence guarantee. Do not restore the empty-prompt-filesystem
|
|
|
|
|
|
workaround or weaken eager validation to satisfy the stale wording.
|
|
|
|
|
|
|
|
|
|
|
|
Acceptance: the owning contract and internal summary agree with the roadmap,
|
|
|
|
|
|
shared engine construction, and existing tests. Review the documentation diff
|
|
|
|
|
|
and links; no production-code change or new runtime guarantee is needed.
|
|
|
|
|
|
|
|
|
|
|
|
### R4: Update The Composed-Example Description
|
|
|
|
|
|
|
|
|
|
|
|
Priority: P3 (low). Status: Open.
|
|
|
|
|
|
|
|
|
|
|
|
Location: `docs/config.md:95–96`, after the example migration in `2027b80`.
|
|
|
|
|
|
|
|
|
|
|
|
The reference says `examples/config.composed.yml` imports two application
|
|
|
|
|
|
fragments. It now imports only `config-fragments/sources.yml`; the former
|
|
|
|
|
|
backend fragment became `examples/framework/backends.yml`, selected through
|
|
|
|
|
|
`promptkit_sources` rather than imported into the application document.
|
|
|
|
|
|
The example and code are correct, but the explanation confuses the two source
|
|
|
|
|
|
boundaries introduced by this migration.
|
|
|
|
|
|
|
|
|
|
|
|
Required change: describe the actual source-selection fragment and separately
|
|
|
|
|
|
selected framework backend file, with links where useful. Do not reintroduce
|
|
|
|
|
|
an application backend mapping or add an unnecessary fragment merely to match
|
|
|
|
|
|
the old prose. The old backend fragment had no application defaults to preserve.
|
|
|
|
|
|
|
|
|
|
|
|
Acceptance: the description matches the maintained files and the existing
|
|
|
|
|
|
composed-overlay render command still succeeds offline.
|
|
|
|
|
|
|
|
|
|
|
|
### R5: Include Framework Configuration Inspection In Built-In Usage
|
|
|
|
|
|
|
|
|
|
|
|
Priority: P3 (low). Status: Open.
|
|
|
|
|
|
|
|
|
|
|
|
Location: `internal/adapter/cli/run.go:742–749` (`printUsage`), following the
|
|
|
|
|
|
new command-family implementation in `2ba2ce1` and `411a67b`.
|
|
|
|
|
|
|
|
|
|
|
|
The top-level usage lists `inspect prompt`, `inspect profile`, and application
|
|
|
|
|
|
`config`, but omits the implemented `inspect configuration` family entirely.
|
|
|
|
|
|
Invoking the binary without arguments reproduces this omission, so users
|
|
|
|
|
|
relying on its built-in command summary cannot discover the new framework
|
|
|
|
|
|
validation/provenance interface or distinguish it from application inspection.
|
|
|
|
|
|
|
|
|
|
|
|
Required change: add a concise usage line identifying all four operations,
|
|
|
|
|
|
the supported selection flags, and the `--path` requirement for `explain`.
|
|
|
|
|
|
Preserve existing exit behavior and command parsing; this does not require a
|
|
|
|
|
|
new help subsystem or aliases. Protect discoverability with a small CLI-entry
|
|
|
|
|
|
assertion for the family/operations, not a snapshot of the entire usage text
|
|
|
|
|
|
or its incidental ordering.
|
|
|
|
|
|
|
|
|
|
|
|
Acceptance: built-in usage advertises the actual family and remains consistent
|
|
|
|
|
|
with `docs/cli.md`; the focused CLI check and development baseline pass.
|
|
|
|
|
|
|
|
|
|
|
|
### Review Verification
|
|
|
|
|
|
|
|
|
|
|
|
- `go test -count=1 ./...`, `go test -race -count=1 ./...`, and
|
|
|
|
|
|
`go vet ./...` passed. A native binary built outside the repository.
|
|
|
|
|
|
- Changed Go files are formatted; diff whitespace checks passed.
|
|
|
|
|
|
- All four maintained application configurations passed both application and
|
|
|
|
|
|
framework validation with provider credentials unset. Both render scripts,
|
|
|
|
|
|
composed-overlay render, and inheritance render passed offline.
|
|
|
|
|
|
- All four captured framework inspection operations passed against the complete
|
|
|
|
|
|
example. Focused tests cover native layering/imports/resource capture,
|
|
|
|
|
|
literal IDs, presence/null inheritance, partial-profile completion, scoped
|
|
|
|
|
|
effective/history redaction, and unchanged existing inspection behavior.
|
|
|
|
|
|
- The selected graph is PromptKit v0.12.0, ConfigKit v0.5.0, and the two `/v3`
|
|
|
|
|
|
catalogs at v3.20260930.0, without a local replacement or workspace. Selected
|
|
|
|
|
|
PromptKit contract and notice links resolved.
|
|
|
|
|
|
- The broader redaction in the new framework-report family, removed legacy
|
|
|
|
|
|
source fields/flags, and eager definition capture are explicitly approved
|
|
|
|
|
|
changes, not accidental strengthening. Shared server capacity, request
|
|
|
|
|
|
independence, HTTP wire behavior, and lexical artifact containment remain
|
|
|
|
|
|
intact. No implementation fixes were made during this review.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
## ConfigKit v0.5.0 Review
|
|
|
|
|
|
|
|
|
|
|
|
Reviewed on 2026-10-03 at `bcf2ddf`, covering the five implementation
|
|
|
|
|
|
commits after `e1ce526`. The ConfigKit adoption and runtime ownership
|
|
|
|
|
|
boundaries match the accepted roadmap. No runtime defect, missing application
|
|
|
|
|
|
feature, or unrequested strengthening of contracts was identified. One
|
2026-10-04 13:57:36 +00:00
|
|
|
|
documentation handoff issue was identified; its current status is recorded below.
|
2026-10-03 17:52:18 +00:00
|
|
|
|
|
|
|
|
|
|
### R2: Correct The Completed Plan's Introductory Status
|
|
|
|
|
|
|
2026-10-04 13:57:36 +00:00
|
|
|
|
Priority: P3 (low). Status: Superseded; no action against the current plan.
|
2026-10-03 17:52:18 +00:00
|
|
|
|
|
|
|
|
|
|
Location: `docs/roadmap/implementation.md:5–9`.
|
|
|
|
|
|
|
|
|
|
|
|
The introduction still says "All five stages are pending" and directs the
|
|
|
|
|
|
reader to implement Stage 1 through Stage 5. Each stage is actually marked
|
|
|
|
|
|
Complete with completion evidence, and the feature roadmap identifies the
|
|
|
|
|
|
adoption as delivered. These contradictory directions leave the overall
|
|
|
|
|
|
handoff inaccurate and could lead a later coding agent to repeat completed
|
|
|
|
|
|
work.
|
|
|
|
|
|
|
|
|
|
|
|
This is a completion-documentation issue, not an unfinished runtime feature.
|
|
|
|
|
|
The [documentation policy](../policy/documentation.md) assigns implementation
|
|
|
|
|
|
status to roadmaps; the overall status should agree with the stage evidence.
|
|
|
|
|
|
|
|
|
|
|
|
Required change: update the introduction to state that all five stages are
|
|
|
|
|
|
complete. Describe the retained steps as implementation history and acceptance
|
|
|
|
|
|
evidence rather than instructions to start the work again. Preserve the
|
|
|
|
|
|
original planning baseline, completed stage records, deferred scope, and
|
|
|
|
|
|
separate release handoff. Do not change application code or rerun the feature
|
|
|
|
|
|
implementation to repair the wording.
|
|
|
|
|
|
|
|
|
|
|
|
Acceptance: the overall status, individual stages, and feature roadmap agree
|
|
|
|
|
|
that implementation is complete, while release preparation remains separate.
|
|
|
|
|
|
Review the documentation diff and run `git diff --check`; this correction
|
|
|
|
|
|
does not require new tests.
|
|
|
|
|
|
|
2026-10-04 13:57:36 +00:00
|
|
|
|
The ConfigKit plan was replaced by the PromptKit plan in `b1bb55a`. Its
|
|
|
|
|
|
historical snapshot remains in Git, while the current introduction correctly
|
|
|
|
|
|
states that all thirteen PromptKit stages are complete. This old finding does
|
|
|
|
|
|
not direct changes to the new plan or repetition of either implementation.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
### Review Verification
|
|
|
|
|
|
|
|
|
|
|
|
- `go test -race -count=1 ./...` passed, including the new configuration,
|
|
|
|
|
|
inspection, and engine-adoption tests and existing shared-capacity coverage.
|
|
|
|
|
|
- `go vet ./...`, a native build outside the repository, and diff checks passed.
|
|
|
|
|
|
- All five maintained inheritance example commands succeeded with
|
|
|
|
|
|
`LOCAL_GPU_API_KEY` absent: validate, show, sources, explain, and render.
|
|
|
|
|
|
The child selected its own backend ID with the inherited endpoint, zero queue
|
|
|
|
|
|
capacity and false parameter remained explicit, and explanation retained
|
|
|
|
|
|
the parent/destination/directive relationship.
|
|
|
|
|
|
- Changed upstream documentation and notice links, affected local paths,
|
|
|
|
|
|
and the historical policy-plan reference resolved.
|
|
|
|
|
|
- The work set changes dependency pins, tests, examples, and documentation;
|
|
|
|
|
|
no production Go implementation was changed. ConfigKit v0.5.0 owns inheritance
|
|
|
|
|
|
through the existing single-load integration; Promptkit remains v0.11.2.
|
|
|
|
|
|
- The `extends` reservation is the explicitly accepted upstream compatibility
|
|
|
|
|
|
change, not a new Scriptorium restriction. Parameter and credential-reference
|
|
|
|
|
|
visibility, working-directory-relative paths, ordinary parent registration,
|
|
|
|
|
|
and existing shared server capacity remain as selected.
|
|
|
|
|
|
|
|
|
|
|
|
## Earlier Promptkit Upgrade Review (Resolved)
|
|
|
|
|
|
|
|
|
|
|
|
### Scope And Status
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
Review baseline: `e177d7c`, covering implementation commits after `5c3b0cf`.
|
2026-09-26 16:17:23 +00:00
|
|
|
|
This document records a resolved test-contract issue; it does not authorize
|
2026-09-26 16:14:16 +00:00
|
|
|
|
unrelated implementation changes. No runtime defect or missing planned feature
|
|
|
|
|
|
was identified in this review. Release preparation remains separate work.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
### R1: Remove The Unrequested Context-Identity Invariant
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
Priority: P3 (low). Status: Complete.
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
Original location: `internal/adapter/http/handler_test.go:334–349`,
|
2026-09-26 16:14:16 +00:00
|
|
|
|
`TestHandlerRunTimeoutValidationAndContextMapping`, introduced in `7de2b02`.
|
|
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
The test's `child` field and `(ctx != parent) != tc.child` assertion required
|
2026-09-26 16:14:16 +00:00
|
|
|
|
the exact parent context object for omitted/null/zero timeouts and a distinct
|
|
|
|
|
|
object for a positive timeout. The requested contract concerns effective
|
|
|
|
|
|
deadlines and cancellation propagation, not Go interface identity. In
|
|
|
|
|
|
particular, a harmless derived context that preserves the parent's deadline,
|
|
|
|
|
|
values, and cancellation would fail the omission cases despite satisfying the
|
|
|
|
|
|
application contract.
|
|
|
|
|
|
|
2026-09-26 16:17:23 +00:00
|
|
|
|
This elevated an incidental implementation choice into a test-enforced
|
2026-09-26 16:14:16 +00:00
|
|
|
|
invariant, contrary to the [agent policy](../policy/agents.md) and
|
|
|
|
|
|
[testing policy](../policy/testing.md). The current handler's context behavior
|
|
|
|
|
|
is correct; this is a maintainability issue, not a runtime cancellation bug.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
#### Required Change
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
Remove the identity comparison and the identity-only table field. Retain
|
|
|
|
|
|
behavioral assertions that an earlier parent deadline is not extended and
|
|
|
|
|
|
parent cancellation reaches execution. For omitted/null/zero values, verify
|
|
|
|
|
|
that no deadline is introduced when the parent has none. Retain coverage of
|
|
|
|
|
|
positive deadlines and the distinction between a canceled execution context
|
|
|
|
|
|
and a provider-attempt timeout while the execution context remains live.
|
|
|
|
|
|
|
|
|
|
|
|
Use the existing runner seam and focused cases; do not introduce a context
|
|
|
|
|
|
wrapper framework, timer abstraction, new public guarantee, or production
|
|
|
|
|
|
refactor solely to change this test.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
#### Completion Criteria
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
- Tests protect effective deadline/cancellation behavior without requiring
|
|
|
|
|
|
context object identity.
|
|
|
|
|
|
- A semantically equivalent derived context does not fail merely because it
|
|
|
|
|
|
is a different object.
|
|
|
|
|
|
- Existing timeout validation and HTTP outcome coverage remains intact.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
#### Resolution And Validation
|
2026-09-26 16:17:23 +00:00
|
|
|
|
|
|
|
|
|
|
Removed the identity-only table field and context comparisons. The test now
|
|
|
|
|
|
checks effective deadlines, including omitted/null/zero requests with no
|
|
|
|
|
|
parent deadline, and explicitly checks that parent cancellation reaches the
|
|
|
|
|
|
runner. Existing positive-deadline integration tests and live-context
|
|
|
|
|
|
provider-timeout mapping remain intact. No production code changed.
|
|
|
|
|
|
|
|
|
|
|
|
Focused HTTP timeout tests, `go test ./...`, `go test -race ./...`,
|
|
|
|
|
|
`go vet ./...`, a native build outside the repository, and `git diff --check`
|
|
|
|
|
|
all passed after remediation.
|
|
|
|
|
|
|
2026-10-03 17:52:18 +00:00
|
|
|
|
### Original Review Verification
|
2026-09-26 16:14:16 +00:00
|
|
|
|
|
|
|
|
|
|
- `go test -race -count=1 ./...` passed, including retry, shared-capacity,
|
|
|
|
|
|
deadline, report, definition-conformance, and architecture-boundary tests.
|
|
|
|
|
|
- `go vet ./...` passed.
|
|
|
|
|
|
- A native `cmd/scriptorium` build passed, with output outside the repository.
|
|
|
|
|
|
- The selected dependency is Promptkit v0.11.0 with its intended v2 catalogs.
|
|
|
|
|
|
- Application code, tests, release automation, and historical releases were
|
|
|
|
|
|
not changed during this review.
|
|
|
|
|
|
|
|
|
|
|
|
The runtime ownership boundaries remain as intended: Promptkit owns framework
|
|
|
|
|
|
formats, execution, retries, and backend admission; Scriptorium owns executable
|
|
|
|
|
|
adapters, application settings, HTTP artifact policy, deadlines, and terminal
|
|
|
|
|
|
report presentation. No additional runtime restrictions, durable workflow
|
|
|
|
|
|
state, or extra release compliance gates were identified in the reviewed diff.
|