Files
notarius/docs/roadmap/implementation.md

18 KiB

ReleaseKit Implementation Plan

Objective And Execution Rules

Implement Native ReleaseKit Adoption. That roadmap owns the approved scope: ReleaseKit v0.10.0, annotated source tags, hosted release notes, and native Linux/amd64 binary/checksum delivery. This document owns the ordered implementation steps. Each numbered stage is one Luna coding-agent prompt.

Execute all seven stages in order as one sprint. Intermediate stages may leave temporarily broken references or commands; do not add compatibility wrappers or duplicate machinery merely to make every intermediate commit independently usable. The final state must satisfy the whole roadmap.

Start with docs/development.md and docs/policy/agents.md. Apply the architecture, testing, documentation, OSS, and release policies to their respective changes. The existing release policy's lightweight-tag/source-only clauses are deliberately replaced in Stage 5; preserve unrelated compatibility and versioning choices. Follow the agent policy for committing completed units, without empty commits.

Throughout the sprint:

  • Use go.maximumdirect.net/releasekit v0.10.0, reviewed commit 82bac1a3ab935beddd4b8789d1e07f52135d4243. Inspect that selected source rather than silently adopting later main changes. Use the version-pinned upstream links in the feature roadmap for canonical behavior.
  • Keep the Go consumer minimum and selected release toolchain at Go 1.27.0. ReleaseKit's own Go 1.27.4 maintainer choice does not change this decision.
  • Do not read, print, copy, validate remotely, or commit the real .releasekit/gitea-token. Its directory and ignore rule are already prepared. Preserve the file and its permissions. Use synthetic credentials only if a local integration test needs them.
  • Do not publish to origin, push branches/tags, create hosted releases, upload assets, or run production inference. Actual release publication is a later, separately authorized task.
  • Do not change pipelines, artifact contracts, model settings, cache behavior, or runtime application configuration. Do not add extra release gates, targets, signing, custom packaging, or application-owned release orchestration.

Stage 1: Register ReleaseKit And Adopt Native Runtime Identity

Status: Complete. Native version wiring and the pinned tool were verified with the focused CLI test and offline application and tool version commands.

Goal: Select the upstream tool and replace Notarius's runtime version logic.

Inspect go.mod, go.sum, internal/buildinfo/, internal/cli/run.go, internal/cli/command_contract_test.go, and the selected upstream adoption and runtime-version guides. Use graph discovery to locate other buildinfo callers.

  1. Register the tool with go get -tool go.maximumdirect.net/releasekit/cmd/releasekit@v0.10.0 using the selected Go toolchain and the repository's ordinary private-module access.
  2. Import go.maximumdirect.net/releasekit/buildinfo in CLI composition and pass buildinfo.Version() directly to NewApplication. Remove the obsolete error path for Notarius's stable-version parser. Preserve other composition failures.
  3. Remove internal/buildinfo and its tests after replacing all imports. Do not retain the old linker variable, stable-version restriction, or a wrapper translating native dev back to development.
  4. Rewrite the affected CLI version test without mutable buildinfo globals. Exercise normal CLI wiring against the native accessor; use the existing NewApplication version argument to test an explicitly supplied release identity through CommandKit. Delete the old invalid-linker-identity case, which tests behavior intentionally removed by this migration.
  5. Run go mod tidy with GOWORK=off. Review shared module selection and sums. Keep the tool directive and do not add local replacements or import the release facade into runtime orchestration.

Acceptance: The runtime uses the native accessor, no private buildinfo package/import remains, and the registered tool is pinned to v0.10.0. No application-owned release service was added.

Validation: With GOTOOLCHAIN=go1.27.0 and GOWORK=off, run focused CLI version tests and go run ./cmd/notarius version. Run the tool's version command by full package path with GOOS/GOARCH selected from go env GOHOSTOS/GOHOSTARCH. Use offline/readonly module settings after dependency preparation. Full-suite verification belongs to Stage 7.

Stage 2: Add The Native Profile And Thin Launcher

Status: Complete. The profile selects the requested destination and one target; launcher syntax, version, usage failure, and credential ignore were checked.

Goal: Provide the complete native configuration and one small tool entry point.

Inspect the selected upstream docs/config.md, adoption guide, build guide, and delivery guide before writing the profile. Create root releasekit.json with these exact selections:

{
  "product": "Notarius",
  "remote": "origin",
  "build": {
    "main_package": "./cmd/notarius",
    "binary_name": "notarius",
    "targets": ["linux/amd64"]
  },
  "delivery": {
    "forge": "gitea",
    "base_url": "https://forge.maximumdirect.net",
    "owner": "eric",
    "repository": "notarius",
    "token_env": "RELEASEKIT_GITEA_TOKEN",
    "token_file": ".releasekit/gitea-token"
  }
}

Omit module_dir, extra checks, optional validation gates, and expected_push_url. Native defaults and the chosen remote suffice; no exact-URL restriction was selected. One profile supplies both candidate validation builds and tagged-source delivery. It contains a token path, never a token value.

Create executable scripts/releasekit as a small POSIX launcher: change to the repository root relative to the launcher, select host OS/architecture using the upstream adoption example, and exec go tool go.maximumdirect.net/releasekit/cmd/releasekit "$@". Preserve ordinary workspace, toolchain, credential, and cache settings; native operations own their Go child environments. Do not validate versions, parse profiles, push main, create tags, aggregate exit statuses, or retry operations in this launcher.

Acceptance: All eight native commands are available through direct forwarding; the sole application build target is Linux/amd64. The existing ignored credential file remains untouched. No custom release configuration loader exists.

Validation: Run sh -n scripts/releasekit, launcher version, and a benign invalid invocation to verify the native usage failure is forwarded. Confirm git check-ignore .releasekit/gitea-token without displaying the file. Actual native profile/build verification is consolidated in Stage 7.

Stage 3: Retire Duplicate Machinery And Maintain Notices

Goal: Remove the replaced release implementation and account for adopted material.

Delete scripts/release.sh, scripts/check-release-source.sh, and scripts/release_test.go. Do not port their Git publication fixtures or guard assertions into a new local suite; ReleaseKit owns those behaviors. Retain consumer-specific version tests from Stage 1.

Inspect ReleaseKit's selected COPYRIGHT, LICENSE, and attribution notices. Update docs/oss/attribution.md for the runtime dependency and any copied launcher material under the local OSS policy, using the reviewed commit. Add any missing standard license text only when applicable; reuse existing texts. Distinguish runtime-incorporated material from tool-only transitive dependencies rather than automatically attributing the entire Go tool module graph. Include copied CI material in that factual identification when Stage 4 lands.

Acceptance: The old publication/check implementation and its duplicate suite are gone; notices match the actual runtime and copied material. The only retained release script is the thin native launcher.

Validation: Search current code for the removed buildinfo import and linker override. Review notice links against the selected source. Current-document and CI references may remain temporarily until their owning stages below.

Stage 4: Replace Advisory Tag CI With Native Delivery

Goal: Deliver the committed release note and Linux/amd64 assets through ReleaseKit's maintained consumer bootstrap.

Inspect .woodpecker/release.yml and the selected upstream examples/woodpecker/tag-delivery.yml plus its delivery guide. Replace the existing job in .woodpecker/release.yml using that consumer template, not ReleaseKit's self-building source-only workflow.

  • Retain the upstream event-tag/peeled-commit verification, clean detached source selection, temporary module-file bootstrap, host target selection, full tool package invocation, and native ci-deliver --prepared handoff.
  • Set the image selection to golang:1.27.0, matching Notarius's selected toolchain. Keep the template's Woodpecker escaping and temporary-directory lifecycle. Do not simplify away tagged-source tool-version selection.
  • Map Woodpecker secret releasekit_gitea_token to RELEASEKIT_GITEA_TOKEN in the delivery step. Preserve ordinary private-module access requirements; deployment secret provisioning is a maintainer action, not a tracked token.
  • Let the committed root profile select the sole build target and destination. Do not add check, publish, go test, asset naming, hashing, or upload logic to the delivery job. Source publication has already validated the candidate.
  • Preserve native delivery status and failure handling. CI delivery failure does not undo the source release, trigger a new source version by itself, or require source publication to poll the job.

Acceptance: Tag CI performs native binary/page delivery, not repeated candidate validation. Bootstrap code differs from the selected upstream template only for Notarius's selected toolchain and necessary consumer wiring. Update the copied material's attribution from Stage 3 if needed.

Validation: Parse YAML with an available local validator and compare the bootstrap to the pinned template. Inspect secret mapping and native arguments. Do not execute the job against the real remote or use the local API token. Generic bootstrap/publication behavior remains upstream-owned; do not introduce a large local shell-fixture suite to retest it. Report external CI secret/access setup as pending operator setup when it cannot be verified locally.

Stage 5: Align Release Policy And Rewrite The Maintainer Runbook

Goal: Make the canonical release contract and practical workflow agree.

Read the release and documentation policies, then update docs/policy/release.md and rewrite docs/release.md. Preserve the policy's upstream baseline metadata; use the actual edit date for local maintenance and identify the relevant local adaptation without claiming a new upstream policy adoption.

Policy changes must cover annotated tags; main already published at the candidate before native publication; a single native offline suite plus selected Linux/amd64 build/native version verification; hosted page/binary/checksum delivery; and separately reported source-publication and delivery outcomes. Remove contradictory source-only, lightweight-tag, temporary-products-only, no-hosted-page, and no-asynchronous-delivery claims throughout the policy, including its footer, guard, recovery, and runbook requirements.

Preserve stable-version selection, compatibility, immutability, proportionate gates, no routine CI polling, and historical notes/tags. Extra native validation features stay disabled. Vet or link checking used during this migration must not become a new permanent publication gate.

The runbook should be short and executable, containing:

  • Notarius's selected toolchain, Git/module access prerequisites, main/origin, and separate dependency preparation before offline validation.
  • Version/note preparation, actual immutable-tag license-footer URLs, committing the candidate, and explicit git push origin main before native publication.
  • ./scripts/releasekit publish VERSION as the publication command. check is optional diagnosis, not a required repeated validation step.
  • Native tag CI delivery and the required Woodpecker secret name; local ./scripts/releasekit deliver VERSION as the alternative from matching clean tagged source. Do not imply every release runs both delivery routes.
  • The local token path, environment override, and upstream credential guidance; never display a token. Explain that Git publication does not use this token.
  • Separate publication and delivery results, native saved-record recovery links, and native retained-output/receipt retry guidance when original asset bytes must be retained. No blind overwrite, republishing source, or invented local reconciliation machinery.

Link the selected upstream CLI, configuration, publication/recovery, and delivery guides for detailed behavior. Do not reproduce their manuals, record formats, credential internals, or full exit-status tables. No new ADR or actual release note/tag is needed for this sprint.

Acceptance: A maintainer has one unambiguous native workflow and recovery entry point, with separate source/delivery outcomes. Every release-policy clause agrees with that workflow and the actual selected profile.

Validation: Read policy and runbook together; check commands against the selected native CLI contract and local launcher. Verify local links and intended footer file paths without requiring future tag URLs to resolve remotely.

Stage 6: Refresh Installation And Contributor Guidance

Goal: Document the delivered product without duplicating upstream features.

Update README installation guidance for the Linux/amd64 binary and native checksum assets while retaining source installation. Derive the filename from ReleaseKit's selected build contract (notarius-<version>-linux-amd64); link the actual Notarius hosted release location. Do not claim the new binaries already exist for historical releases. A generic pinned-version example is sufficient; do not invent a published version or add packaging support.

Update docs/cli.md for the native dev fallback; keep CommandKit version/report semantics unchanged. Update docs/internal/overview.md to remove the deleted buildinfo package entry, and adjust docs/internal/cli.md and docs/development.md where needed for version wiring and release navigation. Only add a separate ReleaseKit integration document if there is substantive Notarius-specific content that the runbook does not already own; normally the runbook's pinned upstream links are sufficient.

Reconcile the packaged-release backlog bullet in docs/roadmap/future.md: remove the now-implemented Linux/amd64 native-distribution scope, preserving broader packaging or target ideas only as deferred ideas, not promised deliverables. Do not retire this active feature roadmap/plan or rewrite historical release notes during the sprint.

Acceptance: Current documentation describes the implemented native workflow and chosen binary scope. There are no active links to deleted scripts/packages, no contradictory source-only claim, and no copied upstream feature reference.

Validation: Check local links and search active documentation for release.sh, check-release-source.sh, internal/buildinfo, development, lightweight, and source-only. Review matches in context; historical records and baseline descriptions in roadmaps are not current-contract errors.

Stage 7: Verify The Assembled Migration

Goal: Prove the final integration locally without publishing anything.

  1. Prepare dependencies if necessary, then use GOWORK=off, GOTOOLCHAIN=go1.27.0, and offline module access (GOPROXY=off) for checks. Run go test -mod=readonly ./... and go vet -mod=readonly ./.... Existing default tests cover maintained application examples.
  2. Run launcher version and ordinary go run -mod=readonly ./cmd/notarius version. Confirm ReleaseKit v0.10.0 and native application version fallback for an unversioned checkout. Confirm no configuration/credential requirement was added to the application version command.
  3. Create an external temporary output directory with mktemp -d. Run native ./scripts/releasekit build --output ABSOLUTE_TEMP_DIR v0.0.0 as a synthetic local build, not a publication attempt. It needs no new release note/tag or unused version on the remote. Check the selected Linux/amd64 artifact and native receipt; on Linux/amd64 run its version command and confirm notarius v0.0.0. On another host rely on ReleaseKit's built-in temporary native version check; do not attempt to execute the foreign artifact.
  4. Review CI/profile mapping against the selected upstream template and confirm exactly one build target. A live hosted-delivery test is not necessary. If supplementary consumer tests are justified, use local disposable inputs and fake external transport, never the real token or Notarius remote.
  5. Check relevant links, attribution, obsolete imports/paths, and git diff --check. Verify that no generated build files, credential contents, temporary profiles, Go workspace files, or local replacements entered the tracked change set. Confirm the credential path is ignored without reading it.
  6. Review the feature roadmap requirement by requirement against actual code, profile, CI, and documentation. Fix any gaps. Record checks run and any externally unverified CI setup; do not claim a live delivery occurred.

Acceptance: The complete roadmap is implemented, the native tool and real version-injected CLI work, default tests and migration checks pass, current docs agree, and no custom release machinery remains beyond the thin launcher and consumer configuration. Only Linux/amd64 is selected for distribution. Report any external CI secret/access setup required before the first actual delivery.

Commit the final nonempty unit under the agent policy and report the completed sprint. Do not push, publish, upload, or delete these planning documents without separate user direction.