Record core operation ownership and audit resolutions
This commit is contained in:
@@ -194,7 +194,8 @@ broader consolidation.
|
||||
## 5. Producer State And Shared Reconciliation Lifecycle
|
||||
|
||||
**Findings:** CAT-015 and CAT-016; coordinate CAT-007.
|
||||
**Status:** Expanded API direction accepted; implementation planned separately.
|
||||
**Status:** Implemented for the selected core/integration boundary; see
|
||||
[ADR-0026](../../adr/0026-core-owned-operation-preparation-and-execution.md).
|
||||
|
||||
The discussion selected a clear core/integration boundary, core ownership of as
|
||||
much demonstrated shared lifecycle responsibility as practical, and a clean,
|
||||
@@ -204,16 +205,16 @@ that target. Internal integration interfaces may change to achieve it.
|
||||
|
||||
The [Core And Integration API Roadmap](../core-integration-api.md) now owns the
|
||||
targeted end state, accepted API decisions, migration work, and verification.
|
||||
Execute that initiative before the remaining audit remediation, then reassess
|
||||
which findings remain against the resulting architecture. Items 1–4 remain
|
||||
That initiative implemented the selected lifecycle and the catalog records the
|
||||
reassessment. Remaining audit remediation is separate. Items 1–4 remain
|
||||
accepted; later discussion items are not silently accepted by this change.
|
||||
|
||||
CAT-007's native usability/error-detail correction is accepted and included in
|
||||
that roadmap. Producer disposition and validator unavailability remain distinct;
|
||||
CAT-007's native usability/error-detail correction was implemented with that
|
||||
roadmap. Producer disposition and validator unavailability remain distinct;
|
||||
no new structural repair loop or budget is selected.
|
||||
|
||||
**Decision:** Accepted direction and API choices; implementation details and status
|
||||
are maintained in the linked roadmap.
|
||||
are maintained in the linked roadmap and current internal guides.
|
||||
|
||||
## 6. Finalization, Completed Diagnostics, And Intermediate Lifetimes
|
||||
|
||||
@@ -322,8 +323,8 @@ every catalog entry through code changes is not itself the goal.
|
||||
|
||||
Recommended approach:
|
||||
|
||||
1. Fix narrow correctness defects with focused regressions: CAT-001/CAT-002,
|
||||
CAT-011–CAT-013, and native classification/test-oracle handling in CAT-007.
|
||||
1. Fix narrow correctness defects with focused regressions: CAT-001/CAT-002 and
|
||||
CAT-011–CAT-013. Native classification/test-oracle handling in CAT-007 is resolved.
|
||||
Preserve supported inputs rather than imposing new restrictions. Reproduce
|
||||
static counterexamples at their real boundaries when implementing the fixes.
|
||||
2. Prioritize ordinary-run costs in CAT-003–CAT-005 alongside failure visibility
|
||||
@@ -354,7 +355,7 @@ end-to-end speedups should be claimed only if measured.
|
||||
Update canonical behavior documentation when implementation lands. Record any
|
||||
significant changed architectural decision without rewriting accepted ADR bodies.
|
||||
Keep the catalog's evidence and qualifications linked rather than duplicating
|
||||
all ten reports in an implementation plan. CAT-034 is already resolved and
|
||||
requires no further remediation.
|
||||
all ten reports in an implementation plan. CAT-007, CAT-015, CAT-016, and
|
||||
CAT-034 are resolved and require no further remediation within their stated scope.
|
||||
|
||||
**Decision:** Pending.
|
||||
|
||||