Update toolchain and release integration
This commit is contained in:
@@ -35,6 +35,11 @@ unrelated [deferred features](future.md) outside the sprint.
|
||||
|
||||
## Stage 1: Establish the toolchain and ReleaseKit integration
|
||||
|
||||
**Completed.** The existing ConfigKit and PromptKit callers still use their old
|
||||
module identities; their migration and removal of transitive old dependencies
|
||||
remain in the following assignments. Final assembled release validation remains
|
||||
in Stage 15.
|
||||
|
||||
Read the [selected modules](library-adoption.md#baseline-and-selected-dependency-set)
|
||||
and [ReleaseKit contract](library-adoption.md#releasekit-adoption-work). Work in
|
||||
`go.mod`, `go.sum`, `scripts/release.sh`, `.woodpecker/release.yml`,
|
||||
|
||||
Reference in New Issue
Block a user