Record remaining implementation review issues
This commit is contained in:
@@ -2,8 +2,10 @@
|
|||||||
|
|
||||||
## Status and scope
|
## Status and scope
|
||||||
|
|
||||||
Remediation complete against baseline `59bb074`. The implementation plan
|
The planned remediation was implemented against baseline `59bb074`. A
|
||||||
records stage and validation evidence.
|
post-implementation review of `6796310` found two follow-up issues below;
|
||||||
|
remediation remains open until they are addressed. The implementation plan
|
||||||
|
records the original stage and validation evidence.
|
||||||
|
|
||||||
This roadmap defines the desired behavior and scope for all three findings in
|
This roadmap defines the desired behavior and scope for all three findings in
|
||||||
the [functional correctness audit](correctness.md) and all five findings in the
|
the [functional correctness audit](correctness.md) and all five findings in the
|
||||||
@@ -106,3 +108,106 @@ policy. They introduce no new public configuration knobs, compatibility shims,
|
|||||||
release procedure, pilot release, or intermediate human-review requirement.
|
release procedure, pilot release, or intermediate human-review requirement.
|
||||||
The targeted sprint reaches this complete end state through local repository
|
The targeted sprint reaches this complete end state through local repository
|
||||||
work and automated validation.
|
work and automated validation.
|
||||||
|
|
||||||
|
## Post-implementation review findings
|
||||||
|
|
||||||
|
The review compared implementation commits `0632aa5` through `6796310` with the
|
||||||
|
agreed target and the plan at `730e638`. It examined production changes, new
|
||||||
|
regressions, current documentation, and the final package boundaries. The
|
||||||
|
following findings require follow-up; the other planned corrections are present.
|
||||||
|
|
||||||
|
### 1. Damaged checkout metadata can silently select standalone preparation
|
||||||
|
|
||||||
|
**Priority:** medium. **Status:** open.
|
||||||
|
|
||||||
|
**Code:** `DiscoverRepositoryRoot` in
|
||||||
|
[internal/git/source.go](../../internal/git/source.go), particularly the
|
||||||
|
recognized no-repository branch, and public `PrepareBuildDependencies` in
|
||||||
|
[preparation.go](../../preparation.go).
|
||||||
|
|
||||||
|
The discovery code treats exit status 128 and the recognized no-repository
|
||||||
|
diagnostic as conclusive evidence of standalone use. Git emits that same
|
||||||
|
diagnostic when a checkout's `.git` directory remains present but its `HEAD`
|
||||||
|
file is missing. The marker inspection used when Git is unavailable does not
|
||||||
|
run on this branch. A broken `.git` file has coverage, but this damaged-directory
|
||||||
|
case does not.
|
||||||
|
|
||||||
|
**Reproduction:** a temporary public-API probe created and committed root and
|
||||||
|
child modules, then called preparation from the child with empty `ModuleDir`.
|
||||||
|
With healthy metadata it selected the root. After moving `.git/HEAD` out of the
|
||||||
|
disposable checkout, the same request returned nil and ran Go in the child.
|
||||||
|
A local Go recording shim observed the directory without downloading anything.
|
||||||
|
|
||||||
|
**Expected:** damaged checkout discovery fails before dependency preparation;
|
||||||
|
the request does not silently acquire a different selection base. This follows
|
||||||
|
the agreed treatment of broken metadata and other discovery failures.
|
||||||
|
|
||||||
|
**Actual consequence:** in a multi-module repository, metadata damage can make
|
||||||
|
an unchanged request prepare another module's graph and report success. This
|
||||||
|
is a remaining gap in checkout selection and failure handling.
|
||||||
|
|
||||||
|
**Correction:** establish that the no-repository result represents standalone
|
||||||
|
use before accepting it as a fallback. Account for relevant existing checkout
|
||||||
|
metadata and preserve the Git failure when that metadata is damaged. Keep Git's
|
||||||
|
normal discovery boundaries and genuine standalone/Go-only use; do not turn
|
||||||
|
this into a general directory-name restriction or a new public option. Add a
|
||||||
|
real damaged-`.git`-directory regression through the public preparation facade,
|
||||||
|
asserting an error and no Go invocation, alongside healthy and standalone
|
||||||
|
controls. The original plan's diagnostic-only classification also needs this
|
||||||
|
refinement; reproducing its algorithm alone is insufficient completion evidence.
|
||||||
|
|
||||||
|
### 2. The deadline regression starts its timeout before inspection readiness
|
||||||
|
|
||||||
|
**Priority:** low. **Status:** open.
|
||||||
|
|
||||||
|
**Code:** `TestBuildSourceInspectionCancellation/deadline` in
|
||||||
|
[build_source_cancellation_test.go](../../build_source_cancellation_test.go).
|
||||||
|
|
||||||
|
The deadline context starts with a three-second timeout before public `Build`
|
||||||
|
resolves the repository and module and reaches `cleanSource`. The test waits
|
||||||
|
for the inspection wrapper's readiness marker afterward, but that marker does
|
||||||
|
not control when expiration begins. The separate 45-second readiness watchdog
|
||||||
|
cannot prevent this earlier deadline from expiring during unrelated setup.
|
||||||
|
|
||||||
|
**Reproduction:** running only this subtest with a temporary delegating Git
|
||||||
|
wrapper that delays `rev-parse --show-toplevel` by four seconds fails with
|
||||||
|
`build ended before inspection` and a repository-resolution deadline error.
|
||||||
|
The test never exercises source inspection. The ordinary suite passes without
|
||||||
|
the injected startup delay.
|
||||||
|
|
||||||
|
**Expected:** the deadline regression exercises expiration during the blocked
|
||||||
|
source-inspection command, as required by the plan's synchronized-readiness
|
||||||
|
case. Unrelated setup latency does not determine whether that path is tested.
|
||||||
|
|
||||||
|
**Actual consequence:** a slower runner can fail the default suite for timing
|
||||||
|
outside the behavior being tested. This is a test reliability gap; the probe
|
||||||
|
does not demonstrate another production cancellation defect.
|
||||||
|
|
||||||
|
**Correction:** make the expiration case readiness-controlled, or isolate it at
|
||||||
|
the source-inspection helper boundary so earlier repository/module work cannot
|
||||||
|
consume its deadline. Retain public cancellation and partial-artifact coverage,
|
||||||
|
bounded cleanup, and the `errors.Is(context.DeadlineExceeded)` assertion.
|
||||||
|
Increasing the whole-operation timeout alone does not establish the intended
|
||||||
|
inspection-specific synchronization. Verify the revised case under delayed
|
||||||
|
unrelated setup as well as normal and race-enabled execution.
|
||||||
|
|
||||||
|
## Review validation and scope assessment
|
||||||
|
|
||||||
|
The ordinary offline `go test ./...` suite and compiled
|
||||||
|
`go run ./internal/apicheck` check passed on the reviewed code with
|
||||||
|
`GOTOOLCHAIN=local GOPROXY=off GOSUMDB=off`. Race-enabled Git, Gitea, Go-tool, and
|
||||||
|
candidate package checks also passed. The temporary delayed-startup test above
|
||||||
|
failed as expected and substantiated finding 2; it is separate from the ordinary
|
||||||
|
passing suite. Focused public preparation, publication, cancellation, delivery,
|
||||||
|
and CLI regressions also passed with the race detector. Probes used disposable
|
||||||
|
local repositories and command wrappers, with no production changes or new
|
||||||
|
committed tests.
|
||||||
|
|
||||||
|
The root orchestration facade, separate runtime facade, neutral forge boundary,
|
||||||
|
and Gitea adapter retain their responsibilities. Ref finalization, candidate tag
|
||||||
|
validation, cancellation error propagation, module-file override, and asset-use
|
||||||
|
failure classification follow the selected approach. The review found no
|
||||||
|
additional public types, configuration knobs, receipt changes, stronger page-only
|
||||||
|
response requirements, or broader source/preflight guarantees introduced by the
|
||||||
|
implementation. The two findings concern incomplete realization of the agreed
|
||||||
|
behavior and regression reliability rather than an intentional scope expansion.
|
||||||
|
|||||||
Reference in New Issue