# Audita request: coordinator execution controls
|
||||
|
||||
Status: proposed follow-up to PromptKit v0.22.0. This document describes
|
||||
consumer requirements; public API design and implementation remain upstream
|
||||
decisions.
|
||||
|
||||
## Purpose
|
||||
|
||||
PromptKit v0.22.0 supplies the conversation capture, continuation, and execution
|
||||
groups Audita requested. Audita can adopt those capabilities through its existing
|
||||
execution adapter. To also adopt `Engine.Coordinate` and remove its local turn
|
||||
loop, Audita needs two capabilities during coordinator-owned execution:
|
||||
|
||||
1. A fresh, application-selected timeout for each continuation operation.
|
||||
2. Access to the exact prepared request before generation, including for turns
|
||||
that subsequently fail without returning a result.
|
||||
|
||||
Both capabilities apply to applications that run bounded model operations and
|
||||
retain optional diagnostic evidence. Neither requires PromptKit to understand
|
||||
transcripts, correction proposals, or domain validation.
|
||||
|
||||
## Current workflow and integration gap
|
||||
|
||||
Audita's role-bound adapter currently derives a timeout context from its caller,
|
||||
calls `PrepareExecution`, retains `PreparedExecution.Details()`, and executes
|
||||
that same handle with `RunPrepared`. The operation deadline covers preparation,
|
||||
capacity waiting, transient retries, generation, and structural repair. Each
|
||||
model operation receives its own budget; application validation may make
|
||||
additional, separately bounded model calls.
|
||||
|
||||
When debug evidence is enabled, Audita retains the prepared messages and
|
||||
effective settings alongside the available response or failure information.
|
||||
It owns artifact destinations, application-specific redaction, and handling of
|
||||
optional diagnostic write failures. The same adapter supplies ordinary execution
|
||||
observers and classifies operation errors for the application.
|
||||
|
||||
In v0.22.0, the [coordinator](../../coordinate.go) accepts a callback returning a
|
||||
`RunRequest`, then directly calls `Engine.Run` with the coordinator's context.
|
||||
The callback cannot supply a fresh execution context or a prepared handle.
|
||||
There is no callback exposing the actual prepared request before that run.
|
||||
|
||||
A timeout around the entire coordinator bounds the conversation and application
|
||||
callbacks together; it does not preserve a separate timeout for each operation.
|
||||
Provider generation timeouts do not cover the whole operation either.
|
||||
Separately calling `Prepare` before returning a request duplicates preparation
|
||||
and does not bind the inspected snapshot to the execution. Successful exchange
|
||||
inspection cannot supply a failed turn's prepared request when no new exchange
|
||||
is returned. Existing metadata-only observations do not contain that content.
|
||||
|
||||
## Requested behavior
|
||||
|
||||
### Per-operation deadlines for coordinated turns
|
||||
|
||||
Allow the application to select a timeout for each requested continuation, with
|
||||
these semantics:
|
||||
|
||||
- Establish a fresh deadline when that continuation starts, before its
|
||||
preparation. Cover preparation, admission waiting, retries, generation, and
|
||||
structural repair under the same operation budget.
|
||||
- Respect caller cancellation and any earlier parent deadline. Expiry of a
|
||||
local operation budget must not cancel the parent context or independent
|
||||
branches.
|
||||
- End the operation's timeout scope before invoking the application's next-turn
|
||||
callback. Assessment calls made there can retain their own operation budgets.
|
||||
- Preserve useful error identity so Audita can distinguish a local deadline
|
||||
from cancellation of the caller. An execution timeout can end coordination
|
||||
under the existing operational-error rule; no automatic turn replay or new
|
||||
recovery policy is requested.
|
||||
|
||||
The existing additional-turn budget, transport retry budget, structural-repair
|
||||
budget, and provider generation timeout retain their separate meanings.
|
||||
|
||||
### Exact prepared-request access
|
||||
|
||||
Provide an opt-in way to obtain caller-owned details of the actual prepared
|
||||
continuation before its first generation attempt:
|
||||
|
||||
- Include the assembled captured history, follow-up definition messages,
|
||||
appended messages, and ordinary resolved execution metadata, using the
|
||||
existing [prepared-details contract](../../prepared_execution.go) where useful.
|
||||
- Expose the snapshot that execution will use, without a second rendering or
|
||||
input-reading pass. Access to details must not mutate that execution.
|
||||
- Let the application retain those details even if generation subsequently
|
||||
fails or is canceled and returns no ordinary result or captured exchange.
|
||||
If preparation itself fails, a complete prepared snapshot is not required.
|
||||
- Preserve existing credential-redaction semantics. Keep content-bearing access
|
||||
explicitly selected and separate from ordinary metadata-only observations.
|
||||
|
||||
Audita needs the logical prepared request, not raw HTTP envelopes or an archive
|
||||
of intermediate structural-repair requests. It can handle optional debug writes
|
||||
itself without requiring PromptKit to own artifact storage or reporting policy.
|
||||
|
||||
## API direction and ownership
|
||||
|
||||
Prefer small execution-level controls that the coordinator honors through its
|
||||
ordinary execution path. An optional operation timeout and a prepared-details
|
||||
callback are one possible shape, not proposed exported names or signatures.
|
||||
Their applicability to ordinary and prepared execution should follow a coherent
|
||||
lifecycle rather than introducing a second coordinator-specific executor.
|
||||
|
||||
An alternative is allowing a coordinator turn to delegate execution through a
|
||||
caller-controlled prepared-execution path. That could reuse Audita's adapter,
|
||||
but exposes more execution responsibility and requires clear ownership of
|
||||
capture, observers, admission release, and prepared-handle cleanup. Evaluate
|
||||
that option only if it is simpler than the narrow controls above.
|
||||
|
||||
PromptKit should continue owning history assembly, turn progression, execution,
|
||||
and observations. Audita retains response interpretation, validator calls,
|
||||
branch policy, diagnostic storage, and application error classification. Existing
|
||||
request observers, coordinator observers, and execution groups must remain
|
||||
usable together. This request does not reopen the accepted conversation history,
|
||||
final-turn delivery, or grouping contracts.
|
||||
|
||||
## Acceptance scenarios
|
||||
|
||||
1. Two successful continuation operations each finish within their own timeout,
|
||||
while their combined duration exceeds one operation's budget. Both succeed
|
||||
under an active parent context.
|
||||
2. Preparation or admission waiting consumes the same budget as generation and
|
||||
structural repair. Local expiry returns a recognizable deadline error and
|
||||
stops that coordinator without canceling its parent or a sibling branch.
|
||||
3. An earlier parent deadline remains effective. A validator called from the
|
||||
next-turn callback runs after admission is released, including with backend
|
||||
capacity one, under its own application-selected deadline.
|
||||
4. The application receives the prepared continuation details before generation.
|
||||
A later provider failure returns no result, but the retained details still
|
||||
describe that failed operation. Mutating a details copy does not change the
|
||||
messages executed.
|
||||
5. Diagnostic access uses the same prepared snapshot that executes, including
|
||||
when source inputs change afterward. It does not trigger another preparation
|
||||
or provider call.
|
||||
6. Existing observers and selected execution groups continue receiving ordinary
|
||||
execution facts once per their existing contracts, including failure paths.
|
||||
Applications that select neither new capability retain existing behavior.
|
||||
|
||||
The consumer implementation motivating this request is Audita's
|
||||
`internal/framework/llm/adapter.go`, especially `RoleClient.CompleteStructured`.
|
||||
This gap affects full coordinator adoption; it does not block adopting v0.22.0
|
||||
capture, continuation, or execution groups independently.
|
||||
@@ -1,291 +0,0 @@
|
||||
# Execution Controls For Coordinated Turns
|
||||
|
||||
Status: all four design decisions accepted. This document defines the target
|
||||
state from v0.22.0; [implementation.md](implementation.md) selects the concrete
|
||||
API and staged implementation work. The feature is not yet implemented.
|
||||
|
||||
## Purpose
|
||||
|
||||
Enable applications using `Engine.Coordinate` to select a fresh timeout for each
|
||||
continuation and retain the exact prepared request before generation. These are
|
||||
execution capabilities useful for bounded operations and optional diagnostics,
|
||||
without assumptions about prompt content or application workflows.
|
||||
|
||||
[Audita's request](audita-request.md) supplies the motivating requirements.
|
||||
Audita already uses one child context across explicit preparation and execution,
|
||||
and retains prepared details for diagnostics. The goal is to make those controls
|
||||
available during coordinator-owned execution without requiring a downstream
|
||||
replacement for PromptKit's turn loop.
|
||||
|
||||
PromptKit owns history assembly, execution, cancellation propagation, and
|
||||
observations. Applications select budgets, interpret results, run validators,
|
||||
schedule branches, and own diagnostic destinations, disclosure policy, and write
|
||||
failure handling. This work adds no artifact store or reporting framework.
|
||||
|
||||
## Current Baseline
|
||||
|
||||
[PromptKit v0.22.0](../releases/v0.22.0.md) supplies captured exchanges,
|
||||
continuation, sequential coordination, and explicit execution groups.
|
||||
|
||||
- The [coordinator](../../coordinate.go) attaches the current exchange and composes
|
||||
request/coordinator observers, then calls `Engine.Run` with the parent context.
|
||||
Its callback returns a request, not an execution context or prepared handle.
|
||||
- Ordinary [run execution](../../internal/usecase/runner.go) resolves the target,
|
||||
obtains logical admission, completes preparation, and generates and validates
|
||||
the response. Admission is released before the next-turn callback.
|
||||
- Explicit [prepared execution](../../prepared_execution.go) already supplies
|
||||
detached `Details()` and executes the retained snapshot. Preparation and
|
||||
execution are separate calls; preparation does not reserve backend capacity.
|
||||
- Ordinary [observations](../internal/observation.md) are metadata-only. Ordinary
|
||||
runs observe preparation failures; split preparation itself emits no execution
|
||||
events. A claimed prepared handle starts its observation lifecycle at execution.
|
||||
|
||||
A timeout around the entire coordinator includes all turns and application
|
||||
callbacks. Provider timeouts cover a different scope. Neither provides a fresh
|
||||
whole-operation budget for each selected turn. Separately calling `Prepare`
|
||||
would duplicate preparation and would not bind the inspected details to the
|
||||
request actually executed. An exchange cannot supply a failed turn's prepared
|
||||
request when execution returns no result.
|
||||
|
||||
## Target End State
|
||||
|
||||
The selected approach is optional per-request controls honored by ordinary `Run`
|
||||
and therefore by `Coordinate`. The accepted decisions below specify their
|
||||
lifecycle; the coordinator does not delegate execution to an application executor.
|
||||
|
||||
### Optional Operation Timeout
|
||||
|
||||
An application can select a duration for each requested continuation. When that
|
||||
continuation starts, establish a fresh child deadline before preparation and use
|
||||
it for the entire operation: preparation, admission waiting, retries, generation,
|
||||
structural validation, and structural repair, including the prepared-details
|
||||
notification. Do not restart the budget between phases or attempts.
|
||||
|
||||
The selected timeout covers work according to the entry point:
|
||||
|
||||
| Entry point | Selected timeout behavior |
|
||||
| --- | --- |
|
||||
| `Run`, including coordinated turns | Starts before preparation and covers preparation and execution. |
|
||||
| `PrepareExecution` | Retains the duration for later execution; preparation uses its supplied context. |
|
||||
| `RunPrepared` | Starts the retained duration when invoked, covering the remaining execution. |
|
||||
|
||||
Idle time between split preparation and execution does not consume the retained
|
||||
execution budget. Applications wanting one budget across both calls can pass the
|
||||
same caller-created deadline context through them. `Prepare` and `ValidateRequest`
|
||||
continue using their supplied contexts without starting the execution timeout.
|
||||
|
||||
Respect parent cancellation and earlier parent deadlines. A local timeout ends
|
||||
the affected operation and coordination under the existing operational-error
|
||||
rule; it does not cancel the parent or siblings. Release child-context resources
|
||||
before returning to the application's next-turn callback. Assessment calls from
|
||||
that callback retain their own application-selected contexts and budgets.
|
||||
|
||||
Determine the execution result and any local-timeout identity before publishing
|
||||
the terminal observation, so the returned error and observed outcome agree.
|
||||
A slow terminal observer or subsequent child-context cleanup must not
|
||||
retroactively turn a completed operation into a timeout. Preserve the existing
|
||||
coordinator behavior for completed responses, parent cancellation before
|
||||
next-turn callback delivery, and the single undelivered response. No automatic
|
||||
replay or new recovery policy is added.
|
||||
|
||||
No selected timeout means existing context behavior. This adds no framework-wide
|
||||
recommended duration or mandatory cap. Additional-turn, transport-retry,
|
||||
structural-repair, and provider-generation budgets keep their existing meanings.
|
||||
Cancellation remains cooperative; a deadline does not forcibly terminate
|
||||
application callbacks or injected collaborators that ignore their context, or
|
||||
guarantee that the public call returns by that deadline.
|
||||
|
||||
### Opt-In Prepared Details Before Generation
|
||||
|
||||
Provide explicitly selected access to caller-owned details of the logical request
|
||||
selected for execution, after successful preparation and before its first
|
||||
generation attempt. Reuse the existing prepared-details representation and
|
||||
credential redaction where practical. Include assembled captured history, rendered
|
||||
follow-up messages, caller-appended messages, and ordinary resolved execution
|
||||
metadata.
|
||||
|
||||
Use the execution's prepared snapshot rather than rendering or reading inputs
|
||||
again. Retaining or modifying delivered details must not mutate the execution.
|
||||
Once delivered, details remain available to the application after provider failure
|
||||
or cancellation even when no ordinary result or exchange is returned. Diagnostic
|
||||
access is available only when execution reaches the prepared-notification point,
|
||||
not for every failed operation. Preparation failure requires no complete snapshot;
|
||||
ordinary admission failure or timeout may occur before preparation completes.
|
||||
Do not add rendering or rearrange admission solely to manufacture diagnostics for
|
||||
those failures. Cancellation before notification does not promise delivery;
|
||||
follow the context checks in [Decision 3](#3-what-is-the-prepared-details-callback-contract).
|
||||
|
||||
This access exposes logical prepared content, not raw HTTP envelopes or internal
|
||||
structural-repair requests. Keep it separate from metadata-only observers and
|
||||
execution-group summaries. It is not another next-turn callback: ordinary
|
||||
execution may already hold backend admission at the notification point.
|
||||
|
||||
### Compatibility And Composition
|
||||
|
||||
Applications selecting neither capability retain existing behavior. Preserve
|
||||
conversation assembly, capture, final-turn delivery, branching, and grouping
|
||||
contracts. Request observers, coordinator observers, and explicitly selected
|
||||
groups continue receiving ordinary execution facts without duplicate lifecycle
|
||||
events or counting attempts twice.
|
||||
|
||||
Preserve ordinary admission, preparation-failure observation, and ownership
|
||||
behavior. A simple replacement of ordinary `Run` with the public
|
||||
`PrepareExecution`/`RunPrepared` sequence would change those behaviors. This does
|
||||
not freeze the internal call structure: consolidation or refactoring is welcome
|
||||
where it preserves the selected lifecycle.
|
||||
|
||||
Document which controls each entry point applies or retains. Execution-only
|
||||
controls need not take effect during `Prepare` or `ValidateRequest`; accepting
|
||||
request-shaped input there does not itself justify rejecting such controls or
|
||||
starting a timer. Follow the accepted split-preparation and callback semantics.
|
||||
|
||||
## Affected Areas
|
||||
|
||||
The target spans request controls, execution-context lifetime, detached prepared
|
||||
details, public error projection, and ordinary coordinator integration. It is an
|
||||
additive runtime feature; no collection-format or ConfigKit changes are needed.
|
||||
Public GoDoc will own exact API contracts, the
|
||||
[consumer guide](../consumers/pkg-promptkit.md) will explain use, and internal
|
||||
lifecycle documentation will describe the implementation when it lands.
|
||||
|
||||
The implementation plan owns API selections, task sequencing, concrete changes,
|
||||
and validation steps. Keep that work proportional to the two requested controls.
|
||||
|
||||
## Validation Targets
|
||||
|
||||
Use offline public-boundary tests and existing execution collaborators, with
|
||||
controlled cancellation and synchronization rather than fragile timing margins.
|
||||
Cover the consumer request's [acceptance scenarios](audita-request.md#acceptance-scenarios)
|
||||
and the accepted lifecycle choices:
|
||||
|
||||
- Successive turns receive fresh budgets: their combined duration may exceed one
|
||||
operation budget without exhausting either individual operation.
|
||||
- For ordinary and coordinated runs, preparation, admission waiting, retries,
|
||||
validation, and repair share the same operation deadline. Local expiry stops
|
||||
coordination without canceling parent or sibling work; earlier parent
|
||||
cancellation/deadlines remain effective.
|
||||
- Next-turn assessment uses the parent context after release, including another
|
||||
call to a backend with capacity one. Timeout identity survives public wrapping.
|
||||
- A slow terminal observer or child-context cleanup does not change a completed
|
||||
outcome into a local timeout; the returned error and terminal observation agree.
|
||||
- Prepared details precede generation, contain the assembled continuation, and
|
||||
remain available after later failure. Mutation of the delivered copy or source
|
||||
changes after preparation do not change the executed snapshot.
|
||||
- Diagnostic access introduces no additional preparation or inference calls,
|
||||
notification per internal repair, or duplicate observer lifecycle. Ordinary
|
||||
retries and structural repair remain allowed. Credential redaction remains
|
||||
intact.
|
||||
- Admission or preparation failure before the notification point does not require
|
||||
diagnostic delivery or additional rendering to produce a snapshot.
|
||||
- Preparation failure, cancellation around notification, and callback panic follow
|
||||
the selected delivery rules and do not strand admission or retained resources.
|
||||
- Split preparation uses its supplied context and retains the selected duration
|
||||
for `RunPrepared`; idle time does not consume that execution budget. A shared
|
||||
caller deadline can still bound both calls. Neither discarded nor unsuccessfully
|
||||
claimed handles start execution notifications.
|
||||
- The prepared notification receives detached details and the operation context,
|
||||
has no error return, and runs synchronously within the operation budget.
|
||||
- Local-budget expiry has a narrow inspectable identity while preserving standard
|
||||
context matching; parent and provider deadlines are not mislabeled as local.
|
||||
- Observers/groups retain ordinary facts on success and failure. No-option use,
|
||||
completed-result delivery, and final-turn behavior remain compatible.
|
||||
|
||||
## Accepted Decisions
|
||||
|
||||
All four decisions below are accepted. No significant product decisions remain
|
||||
open. The implementation plan selects public names, signatures, timeout-value
|
||||
conventions, and the Go representation of timeout identity.
|
||||
|
||||
### 1. Narrow Execution Controls Or Caller-Delegated Execution?
|
||||
|
||||
**Accepted approach:** add optional per-request execution controls honored by
|
||||
ordinary `Run` and thus by `Coordinate`, including a timeout and
|
||||
prepared-details callback. This keeps history, capture, admission, errors, and
|
||||
observers in their existing owners and makes the capability useful outside
|
||||
coordination. A caller can select different controls on each returned request;
|
||||
an additional coordinator-wide configuration layer is not needed for the
|
||||
demonstrated use case.
|
||||
|
||||
**Alternative considered, not selected:** let the coordinator delegate a turn
|
||||
to a caller-provided executor or prepared-execution adapter. This would reuse
|
||||
Audita's existing adapter and accommodate other execution customizations. It
|
||||
also requires a larger contract for exchange assembly, capture, observer
|
||||
composition, handle cleanup, and admission release. The narrow controls meet
|
||||
the demonstrated need with fewer ownership questions; caller-delegated
|
||||
execution is not part of this feature.
|
||||
|
||||
### 2. What Does A Timeout Mean For Split Preparation And Execution?
|
||||
|
||||
**Accepted approach:** bound each `Run` invocation from before preparation. For
|
||||
`PrepareExecution`, retain the selected duration as an execution control and
|
||||
apply it when `RunPrepared` starts; preparation itself continues using its
|
||||
supplied context. Do not retain a live timer across an idle prepared handle.
|
||||
Explicitly explain that this bounds the remaining execution, not preparation
|
||||
already done. Callers needing one total budget across both calls can continue
|
||||
passing the same caller-created deadline context, as Audita does today.
|
||||
|
||||
This preserves the distinction between executing now and preparing for later,
|
||||
while letting a prepared handle carry the same selected execution controls. It
|
||||
requires clear documentation: the duration alone does not retroactively cover
|
||||
split preparation. `Prepare` and `ValidateRequest` likewise do not become timed
|
||||
executions merely because they accept request-shaped input.
|
||||
|
||||
**Alternative considered, not selected:** start a budget during
|
||||
`PrepareExecution` and carry its remaining deadline into `RunPrepared`. This
|
||||
directly bounds preparation and execution together without caller context
|
||||
plumbing. It also counts idle time, requires timer/context ownership and
|
||||
discard semantics, and changes what a prepared handle retains. This is useful
|
||||
if a consumer needs a whole prepared operation lifetime, but exceeds the
|
||||
current coordinated-turn requirement.
|
||||
|
||||
### 3. What Is The Prepared-Details Callback Contract?
|
||||
|
||||
**Accepted approach:** a synchronous notification receiving the operation
|
||||
context and a detached prepared value, with no error return. Invoke it once
|
||||
after the snapshot is ready and before generation, only when execution proceeds
|
||||
to that point. For prepared handles, retain the callback until execution and
|
||||
clear it on claim/discard like the existing observer; inspection remains
|
||||
available earlier through `Details()` without triggering the notification.
|
||||
|
||||
Check context before notification and again before generation. Include callback
|
||||
time in the operation budget and retain ordinary cooperative cancellation and
|
||||
panic propagation, with resource cleanup on unwind. Do not add background delivery
|
||||
or stronger terminal-event guarantees. The application can retain details and
|
||||
perform optional writes under its own policy; it need not turn a diagnostic write
|
||||
failure into an inference failure.
|
||||
|
||||
Under the current ordinary run path this notification executes while logical
|
||||
admission is held. Document that fact rather than promise the next-turn callback's
|
||||
capacity-one nested-execution behavior. Do not prohibit arbitrary callback work;
|
||||
applications must account for the held capacity and operation budget. Releasing
|
||||
and reacquiring admission solely for notification is not necessary for this scope.
|
||||
|
||||
**Alternative considered, not selected:** let the callback return an error to
|
||||
veto generation. This supports mandatory audit persistence or an application
|
||||
pre-generation check, with ordinary cleanup and error propagation. It also
|
||||
makes the callback an execution gate and requires failure classification
|
||||
semantics absent from the optional-diagnostics request. The selected
|
||||
notification satisfies that request; a generation veto would require a separate
|
||||
demonstrated need.
|
||||
|
||||
### 4. How Precisely Should Local Timeout Errors Be Identified?
|
||||
|
||||
**Accepted approach:** preserve standard context matching and provide a narrow,
|
||||
inspectable operation-timeout identity when this newly selected budget causes
|
||||
termination. Keep parent cancellation/deadlines and provider-local failures
|
||||
under their existing identities. The marker must survive public wrapping and
|
||||
must not be inferred from any arbitrary `DeadlineExceeded` returned by a
|
||||
collaborator. Its Go representation is selected in the implementation plan;
|
||||
no new error-report hierarchy or terminal-event category is implied.
|
||||
|
||||
This lets callers distinguish the requested local budget from an earlier parent
|
||||
or provider deadline without retaining the internal child context. Define cause
|
||||
selection around races using the child context's recorded cause; do not promise
|
||||
perfect ordering of independently simultaneous cancellations.
|
||||
|
||||
**Alternative considered, not selected:** return only existing context errors
|
||||
and let callers inspect their parent context. This is smaller and often
|
||||
sufficient when the parent remains active. However, `DeadlineExceeded` alone
|
||||
may also originate in a provider timeout, and a parent may become canceled
|
||||
before the caller inspects it. That weaker attribution does not meet the
|
||||
selected distinction as directly as a narrow operation-timeout identity.
|
||||
@@ -1,457 +0,0 @@
|
||||
# Execution Controls Implementation Plan
|
||||
|
||||
## Objective And Sprint Scope
|
||||
|
||||
Implement the accepted target in [execution-controls.md](execution-controls.md)
|
||||
from the v0.22.0 execution architecture. The feature roadmap owns intent and the
|
||||
four accepted lifecycle decisions; this document selects the API and the work
|
||||
needed to implement them. [Audita's request](audita-request.md) supplies the
|
||||
consumer scenarios.
|
||||
|
||||
Work through Stage 1 through Stage 8 in order. Each stage is scoped for one Luna
|
||||
coding-agent prompt. This is one end-to-end sprint: intermediate stages may
|
||||
temporarily fail to compile or leave wiring incomplete. Do not build temporary
|
||||
compatibility layers merely to make intermediate commits green. There are no
|
||||
intermediate human-review or external-publication gates. Completion requires
|
||||
the assembled feature and its validation, not just completion of individual
|
||||
stages.
|
||||
|
||||
Read [development.md](../development.md), the [agent policy](../policy/agents.md),
|
||||
and the applicable architecture, testing, and documentation policies before
|
||||
work. Preserve unrelated changes. Follow the existing commit policy for finished
|
||||
units; report intermediate validation honestly. This plan authorizes no release,
|
||||
push, dependency update, configuration-format change, or new consumer workflow
|
||||
beyond the execution controls described here.
|
||||
|
||||
## Selected API And Semantics
|
||||
|
||||
Add these fields to the existing public `RunRequest`, without introducing an
|
||||
execution-options object, coordinator executor, or general hook framework:
|
||||
|
||||
```go
|
||||
OperationTimeout time.Duration `json:"-" yaml:"-"`
|
||||
OnPrepared func(context.Context, PreparedRun) `json:"-" yaml:"-"`
|
||||
```
|
||||
|
||||
Add one public sentinel, alongside the current execution errors:
|
||||
|
||||
```go
|
||||
var ErrOperationTimeout = errors.New("operation timeout exceeded")
|
||||
```
|
||||
|
||||
The spelling of an error message is not a contract. No exported timeout error
|
||||
type, new observer event, or new failure-category enum is needed.
|
||||
|
||||
### Entry-Point Contract
|
||||
|
||||
| Entry point | OperationTimeout | OnPrepared |
|
||||
| --- | --- | --- |
|
||||
| `Run` | A positive value starts a fresh child budget before preparation, covering preparation and execution. | Notify once if execution reaches the prepared point before first generation. |
|
||||
| `Coordinate` | Each returned request receives ordinary `Run` semantics with a fresh scope. | Ordinary per-request notification; no coordinator-specific copy of the option. |
|
||||
| `PrepareExecution` | Retain the value privately, without starting a timer. Preparation uses its supplied context. | Retain the selected function privately without invoking it. |
|
||||
| `RunPrepared` | Start the retained positive duration after the successful claim, before execution callbacks, credential revalidation, and admission. | Notify once when the claimed execution reaches the prepared point. |
|
||||
| `Prepare`, `ValidateRequest` | Do not start a timer; use the supplied context as today. | Do not invoke or retain the notification. |
|
||||
| `PreparedExecution.Details`, `Discard` | Do not start a timer. | Do not invoke the notification. Discard drops its retained reference. |
|
||||
|
||||
- A positive duration opts in. Zero and negative durations select no additional
|
||||
timeout. This follows a nonpositive-means-unselected convention, avoids a new
|
||||
request rejection rule, and leaves the parent deadline effective. There is no
|
||||
default operation duration, upper bound, profile setting, or engine setting.
|
||||
- The provider's existing generation timeout remains independent. Do not copy
|
||||
`OperationTimeout` into `ExecutionTarget`, provider JSON, or prepared/result
|
||||
metadata. Neither control changes prompt hashes or configuration inspection.
|
||||
- The budget is continuous across preparation, capacity waiting, notification,
|
||||
generation, transient retries/backoff, validation, and structural repair. It
|
||||
is not restarted between phases, attempts, or repair generations.
|
||||
- Split preparation retains a duration, not a context, deadline, timer, or
|
||||
cancel function. Idle time does not count. A shared caller-created deadline
|
||||
remains the way to bound preparation and later execution together.
|
||||
- A nil notification selects no diagnostic copying. A selected function receives
|
||||
the operation context and a detached, credential-redacted `PreparedRun` value
|
||||
representing the logical request. Its nested mutable values belong to the
|
||||
application. Reuse the existing projection used by `Details()`.
|
||||
- Notification is synchronous, has no error return, and runs after successful
|
||||
preparation and admission, before the first generation. Logical admission is
|
||||
still held. Its time consumes the selected operation budget. It may retain
|
||||
details for later diagnostics; PromptKit does not own writes or write errors.
|
||||
- Check context before notification and again before generation after it
|
||||
returns. A callback may block or ignore context; do not introduce a goroutine
|
||||
to interrupt it. Callback panic propagates after deferred resource cleanup,
|
||||
without a new terminal-event guarantee.
|
||||
- Callback selection is copied as a function value, not as a deep copy of its
|
||||
closure. Shared callback state is application-synchronized; separate runs can
|
||||
invoke a common callback concurrently. Later reassignment of the original
|
||||
request field cannot replace a prepared handle's retained function.
|
||||
- Notification is conditional on reaching that execution point. Admission or
|
||||
preparation failure can prevent it. Do not render again, reorder admission,
|
||||
or promise a diagnostic snapshot for every failed operation. Split callers
|
||||
can still inspect a successfully prepared handle through `Details()`.
|
||||
|
||||
### Timeout Attribution And Completion
|
||||
|
||||
Use the standard library's `context.WithTimeoutCause` with a distinct cause
|
||||
value for each selected scope. Record the scope's own cause identity so an
|
||||
inherited timeout from an enclosing operation cannot be mistaken for this
|
||||
invocation's timer. Do not classify by error text or by `DeadlineExceeded`
|
||||
alone. No strict ordering of independently racing cancellations is promised.
|
||||
|
||||
When an execution fails through its context deadline and the child context's
|
||||
recorded cause is this scope's own timer cause, return an error matching both
|
||||
`ErrOperationTimeout` and `context.DeadlineExceeded`. Preserve existing operation
|
||||
and collaborator error identities. An earlier parent deadline/cancellation or
|
||||
a provider deadline must not acquire the local marker merely because it is a
|
||||
deadline error. An unrelated failure must not acquire it merely because the
|
||||
timer has also expired. Parent-provided error causes, if any, retain their
|
||||
existing behavior; this feature need not reinterpret them.
|
||||
|
||||
Finalize attribution from the operation's returned error before canceling its
|
||||
child scope and before terminal observer delivery. A nil execution error remains
|
||||
a completed result, including a completed structural rejection. Do not add a
|
||||
post-terminal `ctx.Err()` check that converts it into an error. Slow terminal
|
||||
observers and deferred context cleanup cannot change the chosen outcome. This
|
||||
does not strengthen cancellation into forced interruption or a guarantee that
|
||||
every context-ignoring collaborator will return by the deadline.
|
||||
|
||||
The terminal event continues using the existing deadline failure category for
|
||||
a timeout error. Groups continue aggregating those ordinary terminal facts.
|
||||
The child scope is cleaned up before `Run`/`RunPrepared` returns to the next-turn
|
||||
callback; that callback receives the coordinator parent context, not the child.
|
||||
Existing parent cancellation and undelivered-result rules remain unchanged.
|
||||
|
||||
## Implementation Map
|
||||
|
||||
Use existing owners rather than adding a new public package:
|
||||
|
||||
- Public declarations and contract: [types.go](../../types.go),
|
||||
[engine.go](../../engine.go), and [prepared_execution.go](../../prepared_execution.go).
|
||||
- Public conversion and error projection: [convert.go](../../convert.go),
|
||||
[errors.go](../../errors.go), and [observations.go](../../observations.go).
|
||||
- Internal request values: [domain.go](../../internal/domain/domain.go).
|
||||
- Timeout lifecycle and notification orchestration: `internal/usecase`, chiefly
|
||||
[runner.go](../../internal/usecase/runner.go) and
|
||||
[prepared_execution.go](../../internal/usecase/prepared_execution.go).
|
||||
- Existing private operation-error representation:
|
||||
[operation_error.go](../../internal/usecase/operation_error.go).
|
||||
- Ordinary coordinator integration: [coordinate.go](../../coordinate.go) and
|
||||
[internal coordinator](../../internal/usecase/coordinate.go).
|
||||
|
||||
The root remains a facade. Keep timer construction and cause-attribution logic
|
||||
in a small internal helper; the facade may establish that scope and project its
|
||||
errors while managing its existing observation lifecycle. Internal packages must
|
||||
not import the root package or depend on the public `PreparedRun` representation.
|
||||
Private helper names and equivalent internal organization may change; the
|
||||
selected public behavior and ownership boundaries are what matter.
|
||||
|
||||
## Stage 1: Add The Request Contract And Conversion
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: the selected API and internal request plumbing exist, ready for the
|
||||
execution stages to consume.
|
||||
|
||||
1. Add `OperationTimeout`, `OnPrepared`, and `ErrOperationTimeout` to the public
|
||||
declarations above. Write their GoDoc from the entry-point and ownership
|
||||
contract in this plan, explicitly separating operation and provider timeouts.
|
||||
2. Extend `domain.RunRequest` with the duration and an internal callback of shape
|
||||
`func(context.Context, *domain.PreparedRun)`. Document the callback argument
|
||||
as borrowed read-only internal state. It is not a public mutable snapshot.
|
||||
3. Extend `toDomainRunRequest` to copy the duration and capture the selected
|
||||
public callback function in a local variable. Only when it is non-nil, adapt
|
||||
it by projecting the supplied prepared state through `fromDomainPreparedRun`
|
||||
and passing the resulting value. This projection is the public ownership
|
||||
boundary; do not deep-copy the domain snapshot first as well.
|
||||
4. Keep these fields out of public prepared/result JSON and opaque handle
|
||||
details. Request conversion does not start a timer, invoke a callback, or
|
||||
reject an execution-only control on preparation-only entry points.
|
||||
5. Add the private timeout error identity in `internal/usecase`, using the same
|
||||
existing separation between internal and public sentinels. Add its public
|
||||
projection to `errors.go` when introducing the attribution wrapper in Stage 2.
|
||||
|
||||
Validation: focused conversion tests should establish option forwarding and
|
||||
conditional adaptation. Reuse existing nested-value projection tests instead of
|
||||
retesting every existing `PreparedRun` field. Compilation may remain incomplete
|
||||
until the execution wiring lands; do not claim the feature works at this stage.
|
||||
|
||||
## Stage 2: Bound Ordinary Execution And Preserve Its Error Outcome
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: `Engine.Run` owns one continuous optional budget and returns the same
|
||||
failure classification it publishes to observers.
|
||||
|
||||
1. Add a small internal operation-scope helper using `WithTimeoutCause`. For
|
||||
nonpositive durations, reuse the parent context without a timer. For positive
|
||||
durations, retain a fresh per-invocation cause token and a cancel function.
|
||||
Use a real distinct identity, not a shared sentinel or zero-sized token whose
|
||||
pointer identity cannot distinguish scopes.
|
||||
2. Give the helper an error-finalization operation: for a non-nil returned error,
|
||||
require both a match to the operation context's deadline error and equality
|
||||
of its recorded cause with this scope's token before adding the private
|
||||
timeout identity. Leave nil errors and unrelated errors unchanged. Preserve
|
||||
the original error as a cause.
|
||||
3. Reuse `usecase.OperationError` with the private timeout category to carry the
|
||||
marker around the existing error, rather than creating a public error
|
||||
hierarchy. Project that category to `ErrOperationTimeout` through the
|
||||
existing `publicOperationError` machinery. Keep the original phase category
|
||||
and context cause inspectable through the nested chain.
|
||||
4. Establish the ordinary scope in the facade's `Run` entry, after masking
|
||||
inherited execution-observation state and before start-event delivery and
|
||||
request preparation. Both observed and unobserved runs use it. Pass its
|
||||
context through request conversion, internal engine delegation, admission,
|
||||
preparation, and all generation/validation work. Do not also start a second
|
||||
timer inside `Runner.Run`.
|
||||
5. Adjust the private facade `run` path as needed to finalize the execution
|
||||
error before applying public error projection once. On normal return, freeze
|
||||
attribution and the returned result/error, clean up the child, then classify
|
||||
and deliver the existing terminal event. Preserve normal observation of
|
||||
request conversion and preparation failures. Handle all early returns; install
|
||||
cleanup before any user callback can panic.
|
||||
6. Do not change provider timeouts, retry eligibility, repair limits, scheduling,
|
||||
or existing result timing conventions to implement this feature. A timer
|
||||
expiring while terminal observation runs is not another execution failure.
|
||||
|
||||
Validation: narrow helper tests cover disabled scopes, local expiry, parent
|
||||
deadline/cancellation, inherited operation causes, unrelated errors, and nil
|
||||
completion. Add public `Run` tests proving the marker survives phase wrapping
|
||||
and agrees with an ordinary deadline terminal event. Provider-only deadline
|
||||
errors while the operation child is active must not gain the marker.
|
||||
|
||||
## Stage 3: Retain Controls Across Split Preparation
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: prepared execution carries the selected duration and notification,
|
||||
without keeping a live operation scope while idle.
|
||||
|
||||
1. Extend `preparedExecutionPayload` with the duration and internal notification.
|
||||
`PrepareExecution` copies them from the converted request only after its
|
||||
ordinary successful preparation. Preparation itself uses its supplied
|
||||
context, without starting the selected timer or calling the notification.
|
||||
2. Extend payload clearing for both fields. Preserve the existing atomic claim,
|
||||
owner checks, foreign/reused-handle behavior, and durable redacted details.
|
||||
A discard or completed/unwound claim drops PromptKit's callback reference.
|
||||
3. After a successful `Runner.RunPrepared` claim, establish the scope with the
|
||||
retained duration, before the retained observer's start delivery, credential
|
||||
revalidation, and admission. Defer payload and scope cleanup before callback
|
||||
work. A failed claim neither starts notification nor changes existing silent
|
||||
invalid-handle behavior.
|
||||
4. Pass the child through execution and finalize the returned error with the
|
||||
same helper before cleanup and facade terminal classification. Keep this
|
||||
lifecycle in the internal prepared runner rather than borrowing duration or
|
||||
callback state from an unclaimed handle in the facade.
|
||||
5. `RunPrepared`'s facade projects the resulting error and emits its one existing
|
||||
terminal event after resource release. Do not reapply the timer at the facade
|
||||
or retain the preparation context. Namespace views keep their shared-owner
|
||||
behavior and use the handle's original selections.
|
||||
|
||||
Validation: extend prepared-execution coverage to show that preparation and an
|
||||
idle delay longer than the selected duration do not consume its execution
|
||||
budget; later execution does. Reassignment of the original request does not
|
||||
change the retained duration/callback. Cover earlier caller deadlines and a
|
||||
shared caller deadline across preparation and execution. Existing claim-race,
|
||||
discard, foreign-owner, credential, and error-identity tests remain applicable.
|
||||
Notification invocation itself is completed in Stage 4.
|
||||
|
||||
## Stage 4: Notify From The Actual Shared Prepared Snapshot
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: ordinary and prepared execution expose one detached logical request
|
||||
before first generation, without repeating preparation.
|
||||
|
||||
1. Thread the internal notification from `Runner.Run` and the claimed payload
|
||||
into the existing shared `executePreparedRun` entry. At that entry, preparation
|
||||
is complete and logical admission is held on both paths.
|
||||
2. When selected, check the operation context, invoke the internal adapter with
|
||||
the actual retained prepared state, and check context again before entering
|
||||
generation. A context failure at this boundary follows the existing
|
||||
generation operation-error wrapping, preserving context identity and gaining
|
||||
local-timeout identity only through the scope finalizer.
|
||||
3. Invoke once per executing logical request, not per transport retry or repair.
|
||||
Do not call `Prepare`, `Details`, artifact readers, renderers, or schema
|
||||
preparation again to produce the notification. With nil `OnPrepared`, avoid
|
||||
constructing a public details copy.
|
||||
4. Keep the prepared state's API key redacted. Generation still receives its
|
||||
private direct credential through the existing separate path. Preserve the
|
||||
complete assembled messages, schema, settings, input hashes, session,
|
||||
ancestry, and preparation metadata in the delivered public value.
|
||||
5. Leave logical admission held; do not release/reacquire it around notification.
|
||||
Invoke application code without holding the handle mutex or a capacity
|
||||
manager lock. Preserve panic propagation while defers release the lease,
|
||||
timer, and claimed payload. A panic does not make a handle reusable.
|
||||
|
||||
Validation: one ordinary and one split public test establish ordering before
|
||||
generation and exact callback selection. Add focused context-before/after
|
||||
notification tests and an internal cleanup regression if the public capacity
|
||||
probe alone cannot demonstrate payload cleanup. More extensive ownership and
|
||||
failure assertions belong to Stage 6, not duplicate tests here.
|
||||
|
||||
## Stage 5: Verify Continuous Budgets Across Execution Phases
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: tests demonstrate that one scope reaches all relevant collaborators,
|
||||
with correct attribution and observation on failure.
|
||||
|
||||
1. Add focused tests for preparation expiry through a context-aware injected
|
||||
artifact reader, generation-capacity waiting on a real limited backend,
|
||||
interrupted built-in retry backoff, and structural repair expiry. Verify
|
||||
standard context matching, local marker, and retained phase identity where
|
||||
that phase already supplies one. Cover ordinary and split paths without
|
||||
mechanically duplicating every case on both.
|
||||
2. Use a narrow internal runner test for validation-phase expiry, since validation
|
||||
collaborators are not a public injection API. Check the same deadline reaches
|
||||
preparation, validation, and generation; do not add a new public testing seam.
|
||||
3. Test that notification time consumes the same budget and that expiry there
|
||||
prevents generation. Cover an earlier parent deadline and parent cancellation
|
||||
separately from a provider's own deadline. Preserve original injected error
|
||||
identities and do not relabel a non-context error after timer expiry.
|
||||
4. On both ordinary and split public execution, exercise a terminal observer
|
||||
that outlasts the operation budget after successful completion. The result
|
||||
stays successful and the terminal remains successful. Include the timeout
|
||||
failure case to ensure public error mapping happens before terminal delivery.
|
||||
5. After expiry, prove capacity remains usable and the caller parent stays
|
||||
active. Respect the current capacity model: logical admission may reject
|
||||
immediately, while admitted work can wait for an active generation permit.
|
||||
Do not introduce a new blocking admission queue to satisfy a test label.
|
||||
|
||||
Use channels for ordering and `testing/synctest` for controlled elapsed-time
|
||||
scenarios where its bubble rules apply. This repository's Go minimum supports
|
||||
it. Prefer in-memory fixtures and controlled transports; avoid real short sleeps
|
||||
or close-to-deadline assertions. Reuse the existing generation tests for retry
|
||||
policy rather than building a second retry matrix. There is no production clock
|
||||
framework, live provider probe, allocation threshold, or performance gate here.
|
||||
|
||||
Validation: run focused use-case/generation tests and the new public execution
|
||||
control tests under the race detector. The new cases should protect deadline
|
||||
propagation and classification, not private helper call sequences.
|
||||
|
||||
## Stage 6: Verify Notification Ownership And Failure Lifecycles
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: applications can safely retain diagnostic details without altering
|
||||
execution or acquiring new lifecycle guarantees.
|
||||
|
||||
1. Add a representative continuation request containing history, follow-up
|
||||
messages, appended cache-control metadata, input hashes, session, settings
|
||||
with nested provider values, and a structured schema. Inside `OnPrepared`,
|
||||
retain and mutate the delivered mutable values; the model request, captured
|
||||
exchange, and later prepared-handle `Details()` remain unchanged. Use
|
||||
synthetic direct/environment credentials and verify their values are absent
|
||||
from diagnostic details while the existing client credential path still works.
|
||||
2. Demonstrate snapshot fidelity when mutable input/schema sources change after
|
||||
preparation and before execution. Reuse existing frozen-preparation fixtures;
|
||||
notification must describe the executed snapshot, not reread the changed
|
||||
sources. A later provider failure or cancellation may return no result, while
|
||||
the application still retains the delivered details.
|
||||
3. Verify absence of notification for preparation failure and ordinary admission
|
||||
rejection, without requiring extra reads to produce diagnostics. For split
|
||||
execution cover invalid/foreign/discarded/reused handles and pre-notification
|
||||
cancellation. `Details()`, `Prepare`, `ValidateRequest`, and preparation of an
|
||||
executable handle never notify or start this execution timer.
|
||||
4. Verify that retries and structural repair do not repeat notification. Reuse
|
||||
an existing retry-plus-repair integration scenario with an added notification
|
||||
assertion rather than duplicating its full event/usage test elsewhere.
|
||||
5. Recover a notification panic only in test code, then verify ordinary capacity
|
||||
is reusable and a claimed handle stays consumed. Do not require a terminal
|
||||
event after panic or impose a prohibition on callback reentrancy. A capacity
|
||||
one probe documents held admission rather than promising nested success.
|
||||
|
||||
Validation: run affected public contract and private payload-cleanup tests under
|
||||
the race detector. Mutable callback state in concurrent tests must be protected
|
||||
by the test; do not make PromptKit serialize application callbacks globally.
|
||||
|
||||
## Stage 7: Verify Coordinated Turns And Observer Composition
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: coordination obtains the controls through ordinary `Run`, retaining
|
||||
its existing branching and delivery semantics.
|
||||
|
||||
1. Check the coordinator's existing request-value copy preserves both new
|
||||
controls while it replaces `ContinueFrom` and composes observers. No separate
|
||||
coordinator timeout, executor, or public prepare/run sequence is needed.
|
||||
2. Add a controlled-time, two-continuation success case. Each turn finishes
|
||||
within its own timeout while their combined execution exceeds one turn's
|
||||
duration. Callback details contain each turn's assembled history; no timer
|
||||
from an earlier turn controls a later turn.
|
||||
3. In the next-turn callback, verify the parent context is active and the prior
|
||||
child context has been cleaned up. Run an explicitly selected assessment on
|
||||
the same backend with concurrency one and queue capacity zero, using its own
|
||||
timeout. This differs from `OnPrepared`, where admission is still held.
|
||||
4. Exercise a locally timed-out continuation: coordination returns its ordinary
|
||||
operational error with the marker, does not fabricate an outcome or completed
|
||||
exchange, and leaves the parent and a sibling continuation usable. Retained
|
||||
details are available if notification occurred before failure. Do not promise
|
||||
them if execution stopped earlier.
|
||||
5. Compose request and coordinator observers with an explicit execution group.
|
||||
Check one ordinary lifecycle per selected run, normal terminal usage/attempt
|
||||
totals, and no implicit membership for assessment calls. Reuse existing
|
||||
final-turn and parent-cancellation/undelivered-result cases to verify that
|
||||
cleanup and slow terminal observation have not changed delivery semantics.
|
||||
|
||||
Validation: run the coordinator, observation, group, and new execution-control
|
||||
contract cases together under the race detector. Keep tests at the public
|
||||
boundary for the assembled behavior; the internal coordinator loop need not
|
||||
be redesigned solely because its ordinary run gained options.
|
||||
|
||||
## Stage 8: Document, Demonstrate, And Validate The Assembled Feature
|
||||
|
||||
Status: complete.
|
||||
|
||||
Outcome: the implementation and its supported consumer workflow are complete,
|
||||
with documentation in the canonical owners.
|
||||
|
||||
1. Finish GoDoc on `RunRequest`, `ErrOperationTimeout`, `Run`, `Prepare`,
|
||||
`ValidateRequest`, `PrepareExecution`, `RunPrepared`, and `PreparedExecution`.
|
||||
Cross-reference the owning field/error contract rather than duplicating its
|
||||
entire definition. Explain conditional notification, held admission,
|
||||
cooperative cancellation, split preparation, callback ownership, and outcome
|
||||
finalization before terminal observation.
|
||||
2. Update the [consumer guide](../consumers/pkg-promptkit.md) with small ordinary,
|
||||
coordinated, and split usage sketches linked to GoDoc. Show a caller-owned
|
||||
retained `PreparedRun` on failure, `errors.Is` checks for both timeout
|
||||
identities, and a separate budget for callback-owned assessment. Do not add
|
||||
persistence, log destinations, redaction policy, or a mandatory diagnostic
|
||||
write gate.
|
||||
3. Extend the maintained [observation example](../../examples/go-library/observe/main.go)
|
||||
and its semantic test with a positive operation budget on continuation,
|
||||
selected prepared-details retention, and a separately budgeted next-turn
|
||||
assessment. Keep it offline, synthetic, and successful; Stage 5/6 tests own
|
||||
failure demonstrations. Do not add another standalone example framework.
|
||||
4. Update [runner documentation](../internal/runner.md),
|
||||
[observation documentation](../internal/observation.md), and the
|
||||
[component inventory](../internal/overview.md) only where responsibilities or
|
||||
lifecycle descriptions changed. No ConfigKit, collection-format, provider
|
||||
payload, or architectural policy change is required by this work.
|
||||
5. Review Audita's six acceptance scenarios and the feature roadmap's validation
|
||||
targets against the completed tests. Consolidate duplicate tests; do not
|
||||
expand this into a full cross-product of all entry points, phases, observers,
|
||||
and callback behaviors. Retain existing no-option regression coverage.
|
||||
6. Select the newest installed Go toolchain per the development guide. Format
|
||||
changed Go files, run `go test -race ./...` and `go vet ./...` with
|
||||
`GOTOOLCHAIN=local` and `GOWORK=off`, and run `git diff --check`. The full Go
|
||||
suite includes the maintained examples; no second example execution gate is
|
||||
needed. Use writable caches as required by the development environment.
|
||||
Validate local links and inspect the full diff for unintended files/secrets.
|
||||
|
||||
Do not edit published v0.22.0 release notes, create a new release/tag, or require
|
||||
CI or external publication to finish the sprint. Release preparation and
|
||||
retirement of these roadmaps are subsequent work.
|
||||
|
||||
## Completion Criteria
|
||||
|
||||
- Ordinary and coordinated runs apply one optional whole-operation budget;
|
||||
split handles retain duration and callback selection without live idle timers.
|
||||
- Deadline attribution survives public wrapping, distinguishes this scope's
|
||||
recorded timer cause, and agrees with terminal observation before cleanup.
|
||||
- Notification supplies a detached redacted view of the actual logical prepared
|
||||
request, once before generation when reached, without repeated preparation.
|
||||
- Failure, cancellation, and panic paths preserve existing resource, handle,
|
||||
error, observation, grouping, and continuation behavior.
|
||||
- The maintained example, canonical documentation, focused tests, full race
|
||||
suite, and vet are complete. No-option use stays compatible.
|
||||
|
||||
No significant open questions remain. The API and nonpositive-duration choices
|
||||
above complete the planning decisions left by the accepted feature roadmap.
|
||||
@@ -1,72 +0,0 @@
|
||||
# Execution Controls Review
|
||||
|
||||
Reviewed implementation stages 1–8 against commit `57b62d3`, the
|
||||
[implementation plan](implementation.md), the accepted
|
||||
[feature roadmap](execution-controls.md), and the applicable architecture,
|
||||
testing, documentation, and agent policies.
|
||||
|
||||
## 1. Complete The Public Prepared-Notification Contract
|
||||
|
||||
Priority: P3. Status: complete. Owning stage: Stage 8.
|
||||
|
||||
Location: [RunRequest.OnPrepared GoDoc](../../types.go#L97).
|
||||
|
||||
The public GoDoc describes synchronous delivery, detached ownership, held
|
||||
admission, and split preparation, but omits two explicitly selected lifecycle
|
||||
facts:
|
||||
|
||||
- Notification occurs at most once per logical execution, when execution
|
||||
reaches that point before the first generation. Transient retries and
|
||||
structural repair do not repeat it.
|
||||
- The callback receives the operation context, including the selected operation
|
||||
deadline when enabled and inherited parent cancellation. In coordination this
|
||||
is distinct from the parent context delivered to the next-turn callback.
|
||||
|
||||
These facts are already implemented by the
|
||||
[shared execution boundary](../../internal/usecase/runner.go#L186) and covered
|
||||
by the notification, retry/repair, and coordinator contract tests. They are also
|
||||
expressly selected in the roadmap's
|
||||
[accepted callback decision](execution-controls.md#3-what-is-the-prepared-details-callback-contract).
|
||||
However, Go declarations and GoDoc own the exact public API contract; consumers
|
||||
should not need a temporary roadmap or implementation inspection to discover
|
||||
invocation cardinality or the scope of their callback's context.
|
||||
|
||||
Required remediation: add these two facts to the field's GoDoc. Preserve
|
||||
conditional delivery and cooperative cancellation; do not promise notification
|
||||
for every failed request, forced callback interruption, or terminal observation
|
||||
after panic. This is a documentation completion, not a runtime change. Existing
|
||||
behavioral tests already cover these semantics; duplicate tests are unnecessary.
|
||||
|
||||
Completion: expanded the field's GoDoc to state invocation cardinality,
|
||||
non-repetition during retry/repair, and operation-context scope, including the
|
||||
distinction from the coordinator's next-turn callback context. Runtime behavior
|
||||
is unchanged. GoDoc rendering and the existing focused race-enabled notification,
|
||||
retry/repair, and coordinated-budget tests passed.
|
||||
|
||||
## Stage Review Summary
|
||||
|
||||
| Stage | Result |
|
||||
| --- | --- |
|
||||
| 1 — API and conversion | Selected fields and sentinel are present; callback conversion captures the chosen function and detaches details only when selected. |
|
||||
| 2 — Ordinary timeout | One internal scope covers ordinary execution; per-invocation cause attribution and public error projection precede terminal observation. |
|
||||
| 3 — Split preparation | Handles retain duration and callback without an idle timer; claim/discard and cleanup behavior are preserved. |
|
||||
| 4 — Prepared notification | Both execution paths use the actual shared snapshot, with context checks and held admission; retries and repair do not notify again. |
|
||||
| 5 — Phase budgets | Tests cover preparation, capacity waiting, retry backoff, generation/repair, validation, notification time, and stable terminal outcomes. |
|
||||
| 6 — Ownership and failures | Public tests cover detached messages, cache metadata, nested parameters, schema, credentials, frozen sources, retained diagnostics, and panic cleanup. |
|
||||
| 7 — Coordination | Fresh turn budgets, parent-context assessment, released capacity, sibling use, observer composition, and explicit grouping are covered. |
|
||||
| 8 — Documentation and example | Maintained example, consumer/internal documentation, and the completed canonical GoDoc reflect the feature; finding 1 is resolved. |
|
||||
|
||||
No runtime correctness defect, additional architectural gap, or inadvertently
|
||||
strengthened caller restriction or guarantee was identified in this review.
|
||||
|
||||
## Validation
|
||||
|
||||
- The complete package suite passed under `go test -race ./...` when combining
|
||||
the initial run with successful reruns of `internal/configuration` and
|
||||
`internal/llm`. Those two packages initially failed solely because the sandbox
|
||||
disallowed their local `httptest` listeners; their reruns permitted listeners.
|
||||
- `go vet ./...` passed using Go 1.27.3 with `GOTOOLCHAIN=local`, `GOWORK=off`,
|
||||
and offline module resolution.
|
||||
- Changed Go files are formatted. `git diff --check` and local document-target
|
||||
checks passed. No implementation, dependency, policy, or release files were
|
||||
changed during the review.
|
||||