Prepare v0.23.0 release notes and retire completed roadmaps
This commit is contained in:
@@ -45,6 +45,10 @@ boundary and constraints that framework work must preserve.
|
|||||||
|
|
||||||
## Release Guidance
|
## Release Guidance
|
||||||
|
|
||||||
|
The [v0.23.0 release notes](docs/releases/v0.23.0.md) cover per-operation
|
||||||
|
timeouts and opt-in prepared-request notifications for ordinary and coordinated
|
||||||
|
execution.
|
||||||
|
|
||||||
The [v0.22.0 release notes](docs/releases/v0.22.0.md) cover captured conversation
|
The [v0.22.0 release notes](docs/releases/v0.22.0.md) cover captured conversation
|
||||||
exchanges, application-directed turn coordination, and explicit execution groups.
|
exchanges, application-directed turn coordination, and explicit execution groups.
|
||||||
|
|
||||||
|
|||||||
62
docs/releases/v0.23.0.md
Normal file
62
docs/releases/v0.23.0.md
Normal file
@@ -0,0 +1,62 @@
|
|||||||
|
# Promptkit v0.23.0
|
||||||
|
|
||||||
|
This minor release adds optional whole-operation timeouts and prepared-request
|
||||||
|
notifications to ordinary and coordinated execution. Applications can bound
|
||||||
|
each continuation independently and retain the request selected for execution
|
||||||
|
without replacing Promptkit's turn loop or preparing the same request twice.
|
||||||
|
|
||||||
|
## Bound Individual Operations
|
||||||
|
|
||||||
|
`RunRequest.OperationTimeout` selects a fresh cooperative budget covering
|
||||||
|
preparation and execution, including capacity waiting, retries, validation,
|
||||||
|
structural repair, and prepared-request notification. It is independent of the
|
||||||
|
provider generation timeout. Zero or negative values select no additional
|
||||||
|
timeout; existing parent cancellation and earlier deadlines remain effective.
|
||||||
|
|
||||||
|
For split execution, `PrepareExecution` retains the duration without starting
|
||||||
|
a timer. `RunPrepared` starts that budget after claiming the handle, so prior
|
||||||
|
preparation and idle time do not consume it. Callers can still supply one shared
|
||||||
|
deadline context to bound both calls together.
|
||||||
|
|
||||||
|
Local budget failures match both `ErrOperationTimeout` and
|
||||||
|
`context.DeadlineExceeded`. Each coordinated turn uses its selected budget;
|
||||||
|
expiry stops that coordination through the existing operational-error path
|
||||||
|
without canceling its parent or sibling work. Completed outcomes are fixed
|
||||||
|
before terminal observation and are not changed by a slow terminal observer.
|
||||||
|
Cancellation does not forcibly interrupt callbacks or collaborators that ignore
|
||||||
|
their context.
|
||||||
|
|
||||||
|
See the [execution-controls guide](../consumers/pkg-promptkit.md#bound-execution-and-retain-prepared-details)
|
||||||
|
and the [public request contract](../../types.go) and
|
||||||
|
[timeout error contract](../../engine.go) for exact behavior.
|
||||||
|
|
||||||
|
## Retain Prepared Details Before Generation
|
||||||
|
|
||||||
|
`RunRequest.OnPrepared` optionally receives a detached, credential-redacted
|
||||||
|
`PreparedRun` and the operation context before first generation. It uses the
|
||||||
|
actual prepared snapshot, including continuation history, without rereading
|
||||||
|
inputs or rerendering. Applications may retain these details even if generation
|
||||||
|
later fails without returning a result.
|
||||||
|
|
||||||
|
Notification is synchronous, at most once per logical execution, and runs while
|
||||||
|
logical admission is held. It is not repeated for retries or structural repair.
|
||||||
|
Preparation or admission failure can prevent delivery. The application owns
|
||||||
|
diagnostic storage and disclosure decisions; ordinary observers remain
|
||||||
|
metadata-only. See the [OnPrepared GoDoc](../../types.go) and updated
|
||||||
|
[offline observation example](../../examples/go-library/observe/main.go).
|
||||||
|
|
||||||
|
## Compatibility And Upgrade
|
||||||
|
|
||||||
|
Both controls are opt-in. Existing keyed requests and configuration files need
|
||||||
|
no migration from v0.22.0. `Prepare` and `ValidateRequest` continue using only
|
||||||
|
their supplied contexts and do not invoke `OnPrepared`. `RunRequest` gained
|
||||||
|
fields; consumers using positional struct literals must switch to keyed
|
||||||
|
literals. Prepared/result JSON representations are unchanged.
|
||||||
|
|
||||||
|
The Go consumer minimum remains 1.27.0, and dependency versions are unchanged.
|
||||||
|
|
||||||
|
```sh
|
||||||
|
go get go.maximumdirect.net/promptkit@v0.23.0
|
||||||
|
```
|
||||||
|
|
||||||
|
[COPYRIGHT](https://forge.maximumdirect.net/base-layer/promptkit/src/tag/v0.23.0/COPYRIGHT) | [LICENSE](https://forge.maximumdirect.net/base-layer/promptkit/src/tag/v0.23.0/LICENSE) | [ATTRIBUTION](https://forge.maximumdirect.net/base-layer/promptkit/src/tag/v0.23.0/docs/oss/attribution.md)
|
||||||
@@ -1,139 +0,0 @@
|
|||||||
# Audita request: coordinator execution controls
|
|
||||||
|
|
||||||
Status: proposed follow-up to PromptKit v0.22.0. This document describes
|
|
||||||
consumer requirements; public API design and implementation remain upstream
|
|
||||||
decisions.
|
|
||||||
|
|
||||||
## Purpose
|
|
||||||
|
|
||||||
PromptKit v0.22.0 supplies the conversation capture, continuation, and execution
|
|
||||||
groups Audita requested. Audita can adopt those capabilities through its existing
|
|
||||||
execution adapter. To also adopt `Engine.Coordinate` and remove its local turn
|
|
||||||
loop, Audita needs two capabilities during coordinator-owned execution:
|
|
||||||
|
|
||||||
1. A fresh, application-selected timeout for each continuation operation.
|
|
||||||
2. Access to the exact prepared request before generation, including for turns
|
|
||||||
that subsequently fail without returning a result.
|
|
||||||
|
|
||||||
Both capabilities apply to applications that run bounded model operations and
|
|
||||||
retain optional diagnostic evidence. Neither requires PromptKit to understand
|
|
||||||
transcripts, correction proposals, or domain validation.
|
|
||||||
|
|
||||||
## Current workflow and integration gap
|
|
||||||
|
|
||||||
Audita's role-bound adapter currently derives a timeout context from its caller,
|
|
||||||
calls `PrepareExecution`, retains `PreparedExecution.Details()`, and executes
|
|
||||||
that same handle with `RunPrepared`. The operation deadline covers preparation,
|
|
||||||
capacity waiting, transient retries, generation, and structural repair. Each
|
|
||||||
model operation receives its own budget; application validation may make
|
|
||||||
additional, separately bounded model calls.
|
|
||||||
|
|
||||||
When debug evidence is enabled, Audita retains the prepared messages and
|
|
||||||
effective settings alongside the available response or failure information.
|
|
||||||
It owns artifact destinations, application-specific redaction, and handling of
|
|
||||||
optional diagnostic write failures. The same adapter supplies ordinary execution
|
|
||||||
observers and classifies operation errors for the application.
|
|
||||||
|
|
||||||
In v0.22.0, the [coordinator](../../coordinate.go) accepts a callback returning a
|
|
||||||
`RunRequest`, then directly calls `Engine.Run` with the coordinator's context.
|
|
||||||
The callback cannot supply a fresh execution context or a prepared handle.
|
|
||||||
There is no callback exposing the actual prepared request before that run.
|
|
||||||
|
|
||||||
A timeout around the entire coordinator bounds the conversation and application
|
|
||||||
callbacks together; it does not preserve a separate timeout for each operation.
|
|
||||||
Provider generation timeouts do not cover the whole operation either.
|
|
||||||
Separately calling `Prepare` before returning a request duplicates preparation
|
|
||||||
and does not bind the inspected snapshot to the execution. Successful exchange
|
|
||||||
inspection cannot supply a failed turn's prepared request when no new exchange
|
|
||||||
is returned. Existing metadata-only observations do not contain that content.
|
|
||||||
|
|
||||||
## Requested behavior
|
|
||||||
|
|
||||||
### Per-operation deadlines for coordinated turns
|
|
||||||
|
|
||||||
Allow the application to select a timeout for each requested continuation, with
|
|
||||||
these semantics:
|
|
||||||
|
|
||||||
- Establish a fresh deadline when that continuation starts, before its
|
|
||||||
preparation. Cover preparation, admission waiting, retries, generation, and
|
|
||||||
structural repair under the same operation budget.
|
|
||||||
- Respect caller cancellation and any earlier parent deadline. Expiry of a
|
|
||||||
local operation budget must not cancel the parent context or independent
|
|
||||||
branches.
|
|
||||||
- End the operation's timeout scope before invoking the application's next-turn
|
|
||||||
callback. Assessment calls made there can retain their own operation budgets.
|
|
||||||
- Preserve useful error identity so Audita can distinguish a local deadline
|
|
||||||
from cancellation of the caller. An execution timeout can end coordination
|
|
||||||
under the existing operational-error rule; no automatic turn replay or new
|
|
||||||
recovery policy is requested.
|
|
||||||
|
|
||||||
The existing additional-turn budget, transport retry budget, structural-repair
|
|
||||||
budget, and provider generation timeout retain their separate meanings.
|
|
||||||
|
|
||||||
### Exact prepared-request access
|
|
||||||
|
|
||||||
Provide an opt-in way to obtain caller-owned details of the actual prepared
|
|
||||||
continuation before its first generation attempt:
|
|
||||||
|
|
||||||
- Include the assembled captured history, follow-up definition messages,
|
|
||||||
appended messages, and ordinary resolved execution metadata, using the
|
|
||||||
existing [prepared-details contract](../../prepared_execution.go) where useful.
|
|
||||||
- Expose the snapshot that execution will use, without a second rendering or
|
|
||||||
input-reading pass. Access to details must not mutate that execution.
|
|
||||||
- Let the application retain those details even if generation subsequently
|
|
||||||
fails or is canceled and returns no ordinary result or captured exchange.
|
|
||||||
If preparation itself fails, a complete prepared snapshot is not required.
|
|
||||||
- Preserve existing credential-redaction semantics. Keep content-bearing access
|
|
||||||
explicitly selected and separate from ordinary metadata-only observations.
|
|
||||||
|
|
||||||
Audita needs the logical prepared request, not raw HTTP envelopes or an archive
|
|
||||||
of intermediate structural-repair requests. It can handle optional debug writes
|
|
||||||
itself without requiring PromptKit to own artifact storage or reporting policy.
|
|
||||||
|
|
||||||
## API direction and ownership
|
|
||||||
|
|
||||||
Prefer small execution-level controls that the coordinator honors through its
|
|
||||||
ordinary execution path. An optional operation timeout and a prepared-details
|
|
||||||
callback are one possible shape, not proposed exported names or signatures.
|
|
||||||
Their applicability to ordinary and prepared execution should follow a coherent
|
|
||||||
lifecycle rather than introducing a second coordinator-specific executor.
|
|
||||||
|
|
||||||
An alternative is allowing a coordinator turn to delegate execution through a
|
|
||||||
caller-controlled prepared-execution path. That could reuse Audita's adapter,
|
|
||||||
but exposes more execution responsibility and requires clear ownership of
|
|
||||||
capture, observers, admission release, and prepared-handle cleanup. Evaluate
|
|
||||||
that option only if it is simpler than the narrow controls above.
|
|
||||||
|
|
||||||
PromptKit should continue owning history assembly, turn progression, execution,
|
|
||||||
and observations. Audita retains response interpretation, validator calls,
|
|
||||||
branch policy, diagnostic storage, and application error classification. Existing
|
|
||||||
request observers, coordinator observers, and execution groups must remain
|
|
||||||
usable together. This request does not reopen the accepted conversation history,
|
|
||||||
final-turn delivery, or grouping contracts.
|
|
||||||
|
|
||||||
## Acceptance scenarios
|
|
||||||
|
|
||||||
1. Two successful continuation operations each finish within their own timeout,
|
|
||||||
while their combined duration exceeds one operation's budget. Both succeed
|
|
||||||
under an active parent context.
|
|
||||||
2. Preparation or admission waiting consumes the same budget as generation and
|
|
||||||
structural repair. Local expiry returns a recognizable deadline error and
|
|
||||||
stops that coordinator without canceling its parent or a sibling branch.
|
|
||||||
3. An earlier parent deadline remains effective. A validator called from the
|
|
||||||
next-turn callback runs after admission is released, including with backend
|
|
||||||
capacity one, under its own application-selected deadline.
|
|
||||||
4. The application receives the prepared continuation details before generation.
|
|
||||||
A later provider failure returns no result, but the retained details still
|
|
||||||
describe that failed operation. Mutating a details copy does not change the
|
|
||||||
messages executed.
|
|
||||||
5. Diagnostic access uses the same prepared snapshot that executes, including
|
|
||||||
when source inputs change afterward. It does not trigger another preparation
|
|
||||||
or provider call.
|
|
||||||
6. Existing observers and selected execution groups continue receiving ordinary
|
|
||||||
execution facts once per their existing contracts, including failure paths.
|
|
||||||
Applications that select neither new capability retain existing behavior.
|
|
||||||
|
|
||||||
The consumer implementation motivating this request is Audita's
|
|
||||||
`internal/framework/llm/adapter.go`, especially `RoleClient.CompleteStructured`.
|
|
||||||
This gap affects full coordinator adoption; it does not block adopting v0.22.0
|
|
||||||
capture, continuation, or execution groups independently.
|
|
||||||
@@ -1,291 +0,0 @@
|
|||||||
# Execution Controls For Coordinated Turns
|
|
||||||
|
|
||||||
Status: all four design decisions accepted. This document defines the target
|
|
||||||
state from v0.22.0; [implementation.md](implementation.md) selects the concrete
|
|
||||||
API and staged implementation work. The feature is not yet implemented.
|
|
||||||
|
|
||||||
## Purpose
|
|
||||||
|
|
||||||
Enable applications using `Engine.Coordinate` to select a fresh timeout for each
|
|
||||||
continuation and retain the exact prepared request before generation. These are
|
|
||||||
execution capabilities useful for bounded operations and optional diagnostics,
|
|
||||||
without assumptions about prompt content or application workflows.
|
|
||||||
|
|
||||||
[Audita's request](audita-request.md) supplies the motivating requirements.
|
|
||||||
Audita already uses one child context across explicit preparation and execution,
|
|
||||||
and retains prepared details for diagnostics. The goal is to make those controls
|
|
||||||
available during coordinator-owned execution without requiring a downstream
|
|
||||||
replacement for PromptKit's turn loop.
|
|
||||||
|
|
||||||
PromptKit owns history assembly, execution, cancellation propagation, and
|
|
||||||
observations. Applications select budgets, interpret results, run validators,
|
|
||||||
schedule branches, and own diagnostic destinations, disclosure policy, and write
|
|
||||||
failure handling. This work adds no artifact store or reporting framework.
|
|
||||||
|
|
||||||
## Current Baseline
|
|
||||||
|
|
||||||
[PromptKit v0.22.0](../releases/v0.22.0.md) supplies captured exchanges,
|
|
||||||
continuation, sequential coordination, and explicit execution groups.
|
|
||||||
|
|
||||||
- The [coordinator](../../coordinate.go) attaches the current exchange and composes
|
|
||||||
request/coordinator observers, then calls `Engine.Run` with the parent context.
|
|
||||||
Its callback returns a request, not an execution context or prepared handle.
|
|
||||||
- Ordinary [run execution](../../internal/usecase/runner.go) resolves the target,
|
|
||||||
obtains logical admission, completes preparation, and generates and validates
|
|
||||||
the response. Admission is released before the next-turn callback.
|
|
||||||
- Explicit [prepared execution](../../prepared_execution.go) already supplies
|
|
||||||
detached `Details()` and executes the retained snapshot. Preparation and
|
|
||||||
execution are separate calls; preparation does not reserve backend capacity.
|
|
||||||
- Ordinary [observations](../internal/observation.md) are metadata-only. Ordinary
|
|
||||||
runs observe preparation failures; split preparation itself emits no execution
|
|
||||||
events. A claimed prepared handle starts its observation lifecycle at execution.
|
|
||||||
|
|
||||||
A timeout around the entire coordinator includes all turns and application
|
|
||||||
callbacks. Provider timeouts cover a different scope. Neither provides a fresh
|
|
||||||
whole-operation budget for each selected turn. Separately calling `Prepare`
|
|
||||||
would duplicate preparation and would not bind the inspected details to the
|
|
||||||
request actually executed. An exchange cannot supply a failed turn's prepared
|
|
||||||
request when execution returns no result.
|
|
||||||
|
|
||||||
## Target End State
|
|
||||||
|
|
||||||
The selected approach is optional per-request controls honored by ordinary `Run`
|
|
||||||
and therefore by `Coordinate`. The accepted decisions below specify their
|
|
||||||
lifecycle; the coordinator does not delegate execution to an application executor.
|
|
||||||
|
|
||||||
### Optional Operation Timeout
|
|
||||||
|
|
||||||
An application can select a duration for each requested continuation. When that
|
|
||||||
continuation starts, establish a fresh child deadline before preparation and use
|
|
||||||
it for the entire operation: preparation, admission waiting, retries, generation,
|
|
||||||
structural validation, and structural repair, including the prepared-details
|
|
||||||
notification. Do not restart the budget between phases or attempts.
|
|
||||||
|
|
||||||
The selected timeout covers work according to the entry point:
|
|
||||||
|
|
||||||
| Entry point | Selected timeout behavior |
|
|
||||||
| --- | --- |
|
|
||||||
| `Run`, including coordinated turns | Starts before preparation and covers preparation and execution. |
|
|
||||||
| `PrepareExecution` | Retains the duration for later execution; preparation uses its supplied context. |
|
|
||||||
| `RunPrepared` | Starts the retained duration when invoked, covering the remaining execution. |
|
|
||||||
|
|
||||||
Idle time between split preparation and execution does not consume the retained
|
|
||||||
execution budget. Applications wanting one budget across both calls can pass the
|
|
||||||
same caller-created deadline context through them. `Prepare` and `ValidateRequest`
|
|
||||||
continue using their supplied contexts without starting the execution timeout.
|
|
||||||
|
|
||||||
Respect parent cancellation and earlier parent deadlines. A local timeout ends
|
|
||||||
the affected operation and coordination under the existing operational-error
|
|
||||||
rule; it does not cancel the parent or siblings. Release child-context resources
|
|
||||||
before returning to the application's next-turn callback. Assessment calls from
|
|
||||||
that callback retain their own application-selected contexts and budgets.
|
|
||||||
|
|
||||||
Determine the execution result and any local-timeout identity before publishing
|
|
||||||
the terminal observation, so the returned error and observed outcome agree.
|
|
||||||
A slow terminal observer or subsequent child-context cleanup must not
|
|
||||||
retroactively turn a completed operation into a timeout. Preserve the existing
|
|
||||||
coordinator behavior for completed responses, parent cancellation before
|
|
||||||
next-turn callback delivery, and the single undelivered response. No automatic
|
|
||||||
replay or new recovery policy is added.
|
|
||||||
|
|
||||||
No selected timeout means existing context behavior. This adds no framework-wide
|
|
||||||
recommended duration or mandatory cap. Additional-turn, transport-retry,
|
|
||||||
structural-repair, and provider-generation budgets keep their existing meanings.
|
|
||||||
Cancellation remains cooperative; a deadline does not forcibly terminate
|
|
||||||
application callbacks or injected collaborators that ignore their context, or
|
|
||||||
guarantee that the public call returns by that deadline.
|
|
||||||
|
|
||||||
### Opt-In Prepared Details Before Generation
|
|
||||||
|
|
||||||
Provide explicitly selected access to caller-owned details of the logical request
|
|
||||||
selected for execution, after successful preparation and before its first
|
|
||||||
generation attempt. Reuse the existing prepared-details representation and
|
|
||||||
credential redaction where practical. Include assembled captured history, rendered
|
|
||||||
follow-up messages, caller-appended messages, and ordinary resolved execution
|
|
||||||
metadata.
|
|
||||||
|
|
||||||
Use the execution's prepared snapshot rather than rendering or reading inputs
|
|
||||||
again. Retaining or modifying delivered details must not mutate the execution.
|
|
||||||
Once delivered, details remain available to the application after provider failure
|
|
||||||
or cancellation even when no ordinary result or exchange is returned. Diagnostic
|
|
||||||
access is available only when execution reaches the prepared-notification point,
|
|
||||||
not for every failed operation. Preparation failure requires no complete snapshot;
|
|
||||||
ordinary admission failure or timeout may occur before preparation completes.
|
|
||||||
Do not add rendering or rearrange admission solely to manufacture diagnostics for
|
|
||||||
those failures. Cancellation before notification does not promise delivery;
|
|
||||||
follow the context checks in [Decision 3](#3-what-is-the-prepared-details-callback-contract).
|
|
||||||
|
|
||||||
This access exposes logical prepared content, not raw HTTP envelopes or internal
|
|
||||||
structural-repair requests. Keep it separate from metadata-only observers and
|
|
||||||
execution-group summaries. It is not another next-turn callback: ordinary
|
|
||||||
execution may already hold backend admission at the notification point.
|
|
||||||
|
|
||||||
### Compatibility And Composition
|
|
||||||
|
|
||||||
Applications selecting neither capability retain existing behavior. Preserve
|
|
||||||
conversation assembly, capture, final-turn delivery, branching, and grouping
|
|
||||||
contracts. Request observers, coordinator observers, and explicitly selected
|
|
||||||
groups continue receiving ordinary execution facts without duplicate lifecycle
|
|
||||||
events or counting attempts twice.
|
|
||||||
|
|
||||||
Preserve ordinary admission, preparation-failure observation, and ownership
|
|
||||||
behavior. A simple replacement of ordinary `Run` with the public
|
|
||||||
`PrepareExecution`/`RunPrepared` sequence would change those behaviors. This does
|
|
||||||
not freeze the internal call structure: consolidation or refactoring is welcome
|
|
||||||
where it preserves the selected lifecycle.
|
|
||||||
|
|
||||||
Document which controls each entry point applies or retains. Execution-only
|
|
||||||
controls need not take effect during `Prepare` or `ValidateRequest`; accepting
|
|
||||||
request-shaped input there does not itself justify rejecting such controls or
|
|
||||||
starting a timer. Follow the accepted split-preparation and callback semantics.
|
|
||||||
|
|
||||||
## Affected Areas
|
|
||||||
|
|
||||||
The target spans request controls, execution-context lifetime, detached prepared
|
|
||||||
details, public error projection, and ordinary coordinator integration. It is an
|
|
||||||
additive runtime feature; no collection-format or ConfigKit changes are needed.
|
|
||||||
Public GoDoc will own exact API contracts, the
|
|
||||||
[consumer guide](../consumers/pkg-promptkit.md) will explain use, and internal
|
|
||||||
lifecycle documentation will describe the implementation when it lands.
|
|
||||||
|
|
||||||
The implementation plan owns API selections, task sequencing, concrete changes,
|
|
||||||
and validation steps. Keep that work proportional to the two requested controls.
|
|
||||||
|
|
||||||
## Validation Targets
|
|
||||||
|
|
||||||
Use offline public-boundary tests and existing execution collaborators, with
|
|
||||||
controlled cancellation and synchronization rather than fragile timing margins.
|
|
||||||
Cover the consumer request's [acceptance scenarios](audita-request.md#acceptance-scenarios)
|
|
||||||
and the accepted lifecycle choices:
|
|
||||||
|
|
||||||
- Successive turns receive fresh budgets: their combined duration may exceed one
|
|
||||||
operation budget without exhausting either individual operation.
|
|
||||||
- For ordinary and coordinated runs, preparation, admission waiting, retries,
|
|
||||||
validation, and repair share the same operation deadline. Local expiry stops
|
|
||||||
coordination without canceling parent or sibling work; earlier parent
|
|
||||||
cancellation/deadlines remain effective.
|
|
||||||
- Next-turn assessment uses the parent context after release, including another
|
|
||||||
call to a backend with capacity one. Timeout identity survives public wrapping.
|
|
||||||
- A slow terminal observer or child-context cleanup does not change a completed
|
|
||||||
outcome into a local timeout; the returned error and terminal observation agree.
|
|
||||||
- Prepared details precede generation, contain the assembled continuation, and
|
|
||||||
remain available after later failure. Mutation of the delivered copy or source
|
|
||||||
changes after preparation do not change the executed snapshot.
|
|
||||||
- Diagnostic access introduces no additional preparation or inference calls,
|
|
||||||
notification per internal repair, or duplicate observer lifecycle. Ordinary
|
|
||||||
retries and structural repair remain allowed. Credential redaction remains
|
|
||||||
intact.
|
|
||||||
- Admission or preparation failure before the notification point does not require
|
|
||||||
diagnostic delivery or additional rendering to produce a snapshot.
|
|
||||||
- Preparation failure, cancellation around notification, and callback panic follow
|
|
||||||
the selected delivery rules and do not strand admission or retained resources.
|
|
||||||
- Split preparation uses its supplied context and retains the selected duration
|
|
||||||
for `RunPrepared`; idle time does not consume that execution budget. A shared
|
|
||||||
caller deadline can still bound both calls. Neither discarded nor unsuccessfully
|
|
||||||
claimed handles start execution notifications.
|
|
||||||
- The prepared notification receives detached details and the operation context,
|
|
||||||
has no error return, and runs synchronously within the operation budget.
|
|
||||||
- Local-budget expiry has a narrow inspectable identity while preserving standard
|
|
||||||
context matching; parent and provider deadlines are not mislabeled as local.
|
|
||||||
- Observers/groups retain ordinary facts on success and failure. No-option use,
|
|
||||||
completed-result delivery, and final-turn behavior remain compatible.
|
|
||||||
|
|
||||||
## Accepted Decisions
|
|
||||||
|
|
||||||
All four decisions below are accepted. No significant product decisions remain
|
|
||||||
open. The implementation plan selects public names, signatures, timeout-value
|
|
||||||
conventions, and the Go representation of timeout identity.
|
|
||||||
|
|
||||||
### 1. Narrow Execution Controls Or Caller-Delegated Execution?
|
|
||||||
|
|
||||||
**Accepted approach:** add optional per-request execution controls honored by
|
|
||||||
ordinary `Run` and thus by `Coordinate`, including a timeout and
|
|
||||||
prepared-details callback. This keeps history, capture, admission, errors, and
|
|
||||||
observers in their existing owners and makes the capability useful outside
|
|
||||||
coordination. A caller can select different controls on each returned request;
|
|
||||||
an additional coordinator-wide configuration layer is not needed for the
|
|
||||||
demonstrated use case.
|
|
||||||
|
|
||||||
**Alternative considered, not selected:** let the coordinator delegate a turn
|
|
||||||
to a caller-provided executor or prepared-execution adapter. This would reuse
|
|
||||||
Audita's existing adapter and accommodate other execution customizations. It
|
|
||||||
also requires a larger contract for exchange assembly, capture, observer
|
|
||||||
composition, handle cleanup, and admission release. The narrow controls meet
|
|
||||||
the demonstrated need with fewer ownership questions; caller-delegated
|
|
||||||
execution is not part of this feature.
|
|
||||||
|
|
||||||
### 2. What Does A Timeout Mean For Split Preparation And Execution?
|
|
||||||
|
|
||||||
**Accepted approach:** bound each `Run` invocation from before preparation. For
|
|
||||||
`PrepareExecution`, retain the selected duration as an execution control and
|
|
||||||
apply it when `RunPrepared` starts; preparation itself continues using its
|
|
||||||
supplied context. Do not retain a live timer across an idle prepared handle.
|
|
||||||
Explicitly explain that this bounds the remaining execution, not preparation
|
|
||||||
already done. Callers needing one total budget across both calls can continue
|
|
||||||
passing the same caller-created deadline context, as Audita does today.
|
|
||||||
|
|
||||||
This preserves the distinction between executing now and preparing for later,
|
|
||||||
while letting a prepared handle carry the same selected execution controls. It
|
|
||||||
requires clear documentation: the duration alone does not retroactively cover
|
|
||||||
split preparation. `Prepare` and `ValidateRequest` likewise do not become timed
|
|
||||||
executions merely because they accept request-shaped input.
|
|
||||||
|
|
||||||
**Alternative considered, not selected:** start a budget during
|
|
||||||
`PrepareExecution` and carry its remaining deadline into `RunPrepared`. This
|
|
||||||
directly bounds preparation and execution together without caller context
|
|
||||||
plumbing. It also counts idle time, requires timer/context ownership and
|
|
||||||
discard semantics, and changes what a prepared handle retains. This is useful
|
|
||||||
if a consumer needs a whole prepared operation lifetime, but exceeds the
|
|
||||||
current coordinated-turn requirement.
|
|
||||||
|
|
||||||
### 3. What Is The Prepared-Details Callback Contract?
|
|
||||||
|
|
||||||
**Accepted approach:** a synchronous notification receiving the operation
|
|
||||||
context and a detached prepared value, with no error return. Invoke it once
|
|
||||||
after the snapshot is ready and before generation, only when execution proceeds
|
|
||||||
to that point. For prepared handles, retain the callback until execution and
|
|
||||||
clear it on claim/discard like the existing observer; inspection remains
|
|
||||||
available earlier through `Details()` without triggering the notification.
|
|
||||||
|
|
||||||
Check context before notification and again before generation. Include callback
|
|
||||||
time in the operation budget and retain ordinary cooperative cancellation and
|
|
||||||
panic propagation, with resource cleanup on unwind. Do not add background delivery
|
|
||||||
or stronger terminal-event guarantees. The application can retain details and
|
|
||||||
perform optional writes under its own policy; it need not turn a diagnostic write
|
|
||||||
failure into an inference failure.
|
|
||||||
|
|
||||||
Under the current ordinary run path this notification executes while logical
|
|
||||||
admission is held. Document that fact rather than promise the next-turn callback's
|
|
||||||
capacity-one nested-execution behavior. Do not prohibit arbitrary callback work;
|
|
||||||
applications must account for the held capacity and operation budget. Releasing
|
|
||||||
and reacquiring admission solely for notification is not necessary for this scope.
|
|
||||||
|
|
||||||
**Alternative considered, not selected:** let the callback return an error to
|
|
||||||
veto generation. This supports mandatory audit persistence or an application
|
|
||||||
pre-generation check, with ordinary cleanup and error propagation. It also
|
|
||||||
makes the callback an execution gate and requires failure classification
|
|
||||||
semantics absent from the optional-diagnostics request. The selected
|
|
||||||
notification satisfies that request; a generation veto would require a separate
|
|
||||||
demonstrated need.
|
|
||||||
|
|
||||||
### 4. How Precisely Should Local Timeout Errors Be Identified?
|
|
||||||
|
|
||||||
**Accepted approach:** preserve standard context matching and provide a narrow,
|
|
||||||
inspectable operation-timeout identity when this newly selected budget causes
|
|
||||||
termination. Keep parent cancellation/deadlines and provider-local failures
|
|
||||||
under their existing identities. The marker must survive public wrapping and
|
|
||||||
must not be inferred from any arbitrary `DeadlineExceeded` returned by a
|
|
||||||
collaborator. Its Go representation is selected in the implementation plan;
|
|
||||||
no new error-report hierarchy or terminal-event category is implied.
|
|
||||||
|
|
||||||
This lets callers distinguish the requested local budget from an earlier parent
|
|
||||||
or provider deadline without retaining the internal child context. Define cause
|
|
||||||
selection around races using the child context's recorded cause; do not promise
|
|
||||||
perfect ordering of independently simultaneous cancellations.
|
|
||||||
|
|
||||||
**Alternative considered, not selected:** return only existing context errors
|
|
||||||
and let callers inspect their parent context. This is smaller and often
|
|
||||||
sufficient when the parent remains active. However, `DeadlineExceeded` alone
|
|
||||||
may also originate in a provider timeout, and a parent may become canceled
|
|
||||||
before the caller inspects it. That weaker attribution does not meet the
|
|
||||||
selected distinction as directly as a narrow operation-timeout identity.
|
|
||||||
@@ -1,457 +0,0 @@
|
|||||||
# Execution Controls Implementation Plan
|
|
||||||
|
|
||||||
## Objective And Sprint Scope
|
|
||||||
|
|
||||||
Implement the accepted target in [execution-controls.md](execution-controls.md)
|
|
||||||
from the v0.22.0 execution architecture. The feature roadmap owns intent and the
|
|
||||||
four accepted lifecycle decisions; this document selects the API and the work
|
|
||||||
needed to implement them. [Audita's request](audita-request.md) supplies the
|
|
||||||
consumer scenarios.
|
|
||||||
|
|
||||||
Work through Stage 1 through Stage 8 in order. Each stage is scoped for one Luna
|
|
||||||
coding-agent prompt. This is one end-to-end sprint: intermediate stages may
|
|
||||||
temporarily fail to compile or leave wiring incomplete. Do not build temporary
|
|
||||||
compatibility layers merely to make intermediate commits green. There are no
|
|
||||||
intermediate human-review or external-publication gates. Completion requires
|
|
||||||
the assembled feature and its validation, not just completion of individual
|
|
||||||
stages.
|
|
||||||
|
|
||||||
Read [development.md](../development.md), the [agent policy](../policy/agents.md),
|
|
||||||
and the applicable architecture, testing, and documentation policies before
|
|
||||||
work. Preserve unrelated changes. Follow the existing commit policy for finished
|
|
||||||
units; report intermediate validation honestly. This plan authorizes no release,
|
|
||||||
push, dependency update, configuration-format change, or new consumer workflow
|
|
||||||
beyond the execution controls described here.
|
|
||||||
|
|
||||||
## Selected API And Semantics
|
|
||||||
|
|
||||||
Add these fields to the existing public `RunRequest`, without introducing an
|
|
||||||
execution-options object, coordinator executor, or general hook framework:
|
|
||||||
|
|
||||||
```go
|
|
||||||
OperationTimeout time.Duration `json:"-" yaml:"-"`
|
|
||||||
OnPrepared func(context.Context, PreparedRun) `json:"-" yaml:"-"`
|
|
||||||
```
|
|
||||||
|
|
||||||
Add one public sentinel, alongside the current execution errors:
|
|
||||||
|
|
||||||
```go
|
|
||||||
var ErrOperationTimeout = errors.New("operation timeout exceeded")
|
|
||||||
```
|
|
||||||
|
|
||||||
The spelling of an error message is not a contract. No exported timeout error
|
|
||||||
type, new observer event, or new failure-category enum is needed.
|
|
||||||
|
|
||||||
### Entry-Point Contract
|
|
||||||
|
|
||||||
| Entry point | OperationTimeout | OnPrepared |
|
|
||||||
| --- | --- | --- |
|
|
||||||
| `Run` | A positive value starts a fresh child budget before preparation, covering preparation and execution. | Notify once if execution reaches the prepared point before first generation. |
|
|
||||||
| `Coordinate` | Each returned request receives ordinary `Run` semantics with a fresh scope. | Ordinary per-request notification; no coordinator-specific copy of the option. |
|
|
||||||
| `PrepareExecution` | Retain the value privately, without starting a timer. Preparation uses its supplied context. | Retain the selected function privately without invoking it. |
|
|
||||||
| `RunPrepared` | Start the retained positive duration after the successful claim, before execution callbacks, credential revalidation, and admission. | Notify once when the claimed execution reaches the prepared point. |
|
|
||||||
| `Prepare`, `ValidateRequest` | Do not start a timer; use the supplied context as today. | Do not invoke or retain the notification. |
|
|
||||||
| `PreparedExecution.Details`, `Discard` | Do not start a timer. | Do not invoke the notification. Discard drops its retained reference. |
|
|
||||||
|
|
||||||
- A positive duration opts in. Zero and negative durations select no additional
|
|
||||||
timeout. This follows a nonpositive-means-unselected convention, avoids a new
|
|
||||||
request rejection rule, and leaves the parent deadline effective. There is no
|
|
||||||
default operation duration, upper bound, profile setting, or engine setting.
|
|
||||||
- The provider's existing generation timeout remains independent. Do not copy
|
|
||||||
`OperationTimeout` into `ExecutionTarget`, provider JSON, or prepared/result
|
|
||||||
metadata. Neither control changes prompt hashes or configuration inspection.
|
|
||||||
- The budget is continuous across preparation, capacity waiting, notification,
|
|
||||||
generation, transient retries/backoff, validation, and structural repair. It
|
|
||||||
is not restarted between phases, attempts, or repair generations.
|
|
||||||
- Split preparation retains a duration, not a context, deadline, timer, or
|
|
||||||
cancel function. Idle time does not count. A shared caller-created deadline
|
|
||||||
remains the way to bound preparation and later execution together.
|
|
||||||
- A nil notification selects no diagnostic copying. A selected function receives
|
|
||||||
the operation context and a detached, credential-redacted `PreparedRun` value
|
|
||||||
representing the logical request. Its nested mutable values belong to the
|
|
||||||
application. Reuse the existing projection used by `Details()`.
|
|
||||||
- Notification is synchronous, has no error return, and runs after successful
|
|
||||||
preparation and admission, before the first generation. Logical admission is
|
|
||||||
still held. Its time consumes the selected operation budget. It may retain
|
|
||||||
details for later diagnostics; PromptKit does not own writes or write errors.
|
|
||||||
- Check context before notification and again before generation after it
|
|
||||||
returns. A callback may block or ignore context; do not introduce a goroutine
|
|
||||||
to interrupt it. Callback panic propagates after deferred resource cleanup,
|
|
||||||
without a new terminal-event guarantee.
|
|
||||||
- Callback selection is copied as a function value, not as a deep copy of its
|
|
||||||
closure. Shared callback state is application-synchronized; separate runs can
|
|
||||||
invoke a common callback concurrently. Later reassignment of the original
|
|
||||||
request field cannot replace a prepared handle's retained function.
|
|
||||||
- Notification is conditional on reaching that execution point. Admission or
|
|
||||||
preparation failure can prevent it. Do not render again, reorder admission,
|
|
||||||
or promise a diagnostic snapshot for every failed operation. Split callers
|
|
||||||
can still inspect a successfully prepared handle through `Details()`.
|
|
||||||
|
|
||||||
### Timeout Attribution And Completion
|
|
||||||
|
|
||||||
Use the standard library's `context.WithTimeoutCause` with a distinct cause
|
|
||||||
value for each selected scope. Record the scope's own cause identity so an
|
|
||||||
inherited timeout from an enclosing operation cannot be mistaken for this
|
|
||||||
invocation's timer. Do not classify by error text or by `DeadlineExceeded`
|
|
||||||
alone. No strict ordering of independently racing cancellations is promised.
|
|
||||||
|
|
||||||
When an execution fails through its context deadline and the child context's
|
|
||||||
recorded cause is this scope's own timer cause, return an error matching both
|
|
||||||
`ErrOperationTimeout` and `context.DeadlineExceeded`. Preserve existing operation
|
|
||||||
and collaborator error identities. An earlier parent deadline/cancellation or
|
|
||||||
a provider deadline must not acquire the local marker merely because it is a
|
|
||||||
deadline error. An unrelated failure must not acquire it merely because the
|
|
||||||
timer has also expired. Parent-provided error causes, if any, retain their
|
|
||||||
existing behavior; this feature need not reinterpret them.
|
|
||||||
|
|
||||||
Finalize attribution from the operation's returned error before canceling its
|
|
||||||
child scope and before terminal observer delivery. A nil execution error remains
|
|
||||||
a completed result, including a completed structural rejection. Do not add a
|
|
||||||
post-terminal `ctx.Err()` check that converts it into an error. Slow terminal
|
|
||||||
observers and deferred context cleanup cannot change the chosen outcome. This
|
|
||||||
does not strengthen cancellation into forced interruption or a guarantee that
|
|
||||||
every context-ignoring collaborator will return by the deadline.
|
|
||||||
|
|
||||||
The terminal event continues using the existing deadline failure category for
|
|
||||||
a timeout error. Groups continue aggregating those ordinary terminal facts.
|
|
||||||
The child scope is cleaned up before `Run`/`RunPrepared` returns to the next-turn
|
|
||||||
callback; that callback receives the coordinator parent context, not the child.
|
|
||||||
Existing parent cancellation and undelivered-result rules remain unchanged.
|
|
||||||
|
|
||||||
## Implementation Map
|
|
||||||
|
|
||||||
Use existing owners rather than adding a new public package:
|
|
||||||
|
|
||||||
- Public declarations and contract: [types.go](../../types.go),
|
|
||||||
[engine.go](../../engine.go), and [prepared_execution.go](../../prepared_execution.go).
|
|
||||||
- Public conversion and error projection: [convert.go](../../convert.go),
|
|
||||||
[errors.go](../../errors.go), and [observations.go](../../observations.go).
|
|
||||||
- Internal request values: [domain.go](../../internal/domain/domain.go).
|
|
||||||
- Timeout lifecycle and notification orchestration: `internal/usecase`, chiefly
|
|
||||||
[runner.go](../../internal/usecase/runner.go) and
|
|
||||||
[prepared_execution.go](../../internal/usecase/prepared_execution.go).
|
|
||||||
- Existing private operation-error representation:
|
|
||||||
[operation_error.go](../../internal/usecase/operation_error.go).
|
|
||||||
- Ordinary coordinator integration: [coordinate.go](../../coordinate.go) and
|
|
||||||
[internal coordinator](../../internal/usecase/coordinate.go).
|
|
||||||
|
|
||||||
The root remains a facade. Keep timer construction and cause-attribution logic
|
|
||||||
in a small internal helper; the facade may establish that scope and project its
|
|
||||||
errors while managing its existing observation lifecycle. Internal packages must
|
|
||||||
not import the root package or depend on the public `PreparedRun` representation.
|
|
||||||
Private helper names and equivalent internal organization may change; the
|
|
||||||
selected public behavior and ownership boundaries are what matter.
|
|
||||||
|
|
||||||
## Stage 1: Add The Request Contract And Conversion
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: the selected API and internal request plumbing exist, ready for the
|
|
||||||
execution stages to consume.
|
|
||||||
|
|
||||||
1. Add `OperationTimeout`, `OnPrepared`, and `ErrOperationTimeout` to the public
|
|
||||||
declarations above. Write their GoDoc from the entry-point and ownership
|
|
||||||
contract in this plan, explicitly separating operation and provider timeouts.
|
|
||||||
2. Extend `domain.RunRequest` with the duration and an internal callback of shape
|
|
||||||
`func(context.Context, *domain.PreparedRun)`. Document the callback argument
|
|
||||||
as borrowed read-only internal state. It is not a public mutable snapshot.
|
|
||||||
3. Extend `toDomainRunRequest` to copy the duration and capture the selected
|
|
||||||
public callback function in a local variable. Only when it is non-nil, adapt
|
|
||||||
it by projecting the supplied prepared state through `fromDomainPreparedRun`
|
|
||||||
and passing the resulting value. This projection is the public ownership
|
|
||||||
boundary; do not deep-copy the domain snapshot first as well.
|
|
||||||
4. Keep these fields out of public prepared/result JSON and opaque handle
|
|
||||||
details. Request conversion does not start a timer, invoke a callback, or
|
|
||||||
reject an execution-only control on preparation-only entry points.
|
|
||||||
5. Add the private timeout error identity in `internal/usecase`, using the same
|
|
||||||
existing separation between internal and public sentinels. Add its public
|
|
||||||
projection to `errors.go` when introducing the attribution wrapper in Stage 2.
|
|
||||||
|
|
||||||
Validation: focused conversion tests should establish option forwarding and
|
|
||||||
conditional adaptation. Reuse existing nested-value projection tests instead of
|
|
||||||
retesting every existing `PreparedRun` field. Compilation may remain incomplete
|
|
||||||
until the execution wiring lands; do not claim the feature works at this stage.
|
|
||||||
|
|
||||||
## Stage 2: Bound Ordinary Execution And Preserve Its Error Outcome
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: `Engine.Run` owns one continuous optional budget and returns the same
|
|
||||||
failure classification it publishes to observers.
|
|
||||||
|
|
||||||
1. Add a small internal operation-scope helper using `WithTimeoutCause`. For
|
|
||||||
nonpositive durations, reuse the parent context without a timer. For positive
|
|
||||||
durations, retain a fresh per-invocation cause token and a cancel function.
|
|
||||||
Use a real distinct identity, not a shared sentinel or zero-sized token whose
|
|
||||||
pointer identity cannot distinguish scopes.
|
|
||||||
2. Give the helper an error-finalization operation: for a non-nil returned error,
|
|
||||||
require both a match to the operation context's deadline error and equality
|
|
||||||
of its recorded cause with this scope's token before adding the private
|
|
||||||
timeout identity. Leave nil errors and unrelated errors unchanged. Preserve
|
|
||||||
the original error as a cause.
|
|
||||||
3. Reuse `usecase.OperationError` with the private timeout category to carry the
|
|
||||||
marker around the existing error, rather than creating a public error
|
|
||||||
hierarchy. Project that category to `ErrOperationTimeout` through the
|
|
||||||
existing `publicOperationError` machinery. Keep the original phase category
|
|
||||||
and context cause inspectable through the nested chain.
|
|
||||||
4. Establish the ordinary scope in the facade's `Run` entry, after masking
|
|
||||||
inherited execution-observation state and before start-event delivery and
|
|
||||||
request preparation. Both observed and unobserved runs use it. Pass its
|
|
||||||
context through request conversion, internal engine delegation, admission,
|
|
||||||
preparation, and all generation/validation work. Do not also start a second
|
|
||||||
timer inside `Runner.Run`.
|
|
||||||
5. Adjust the private facade `run` path as needed to finalize the execution
|
|
||||||
error before applying public error projection once. On normal return, freeze
|
|
||||||
attribution and the returned result/error, clean up the child, then classify
|
|
||||||
and deliver the existing terminal event. Preserve normal observation of
|
|
||||||
request conversion and preparation failures. Handle all early returns; install
|
|
||||||
cleanup before any user callback can panic.
|
|
||||||
6. Do not change provider timeouts, retry eligibility, repair limits, scheduling,
|
|
||||||
or existing result timing conventions to implement this feature. A timer
|
|
||||||
expiring while terminal observation runs is not another execution failure.
|
|
||||||
|
|
||||||
Validation: narrow helper tests cover disabled scopes, local expiry, parent
|
|
||||||
deadline/cancellation, inherited operation causes, unrelated errors, and nil
|
|
||||||
completion. Add public `Run` tests proving the marker survives phase wrapping
|
|
||||||
and agrees with an ordinary deadline terminal event. Provider-only deadline
|
|
||||||
errors while the operation child is active must not gain the marker.
|
|
||||||
|
|
||||||
## Stage 3: Retain Controls Across Split Preparation
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: prepared execution carries the selected duration and notification,
|
|
||||||
without keeping a live operation scope while idle.
|
|
||||||
|
|
||||||
1. Extend `preparedExecutionPayload` with the duration and internal notification.
|
|
||||||
`PrepareExecution` copies them from the converted request only after its
|
|
||||||
ordinary successful preparation. Preparation itself uses its supplied
|
|
||||||
context, without starting the selected timer or calling the notification.
|
|
||||||
2. Extend payload clearing for both fields. Preserve the existing atomic claim,
|
|
||||||
owner checks, foreign/reused-handle behavior, and durable redacted details.
|
|
||||||
A discard or completed/unwound claim drops PromptKit's callback reference.
|
|
||||||
3. After a successful `Runner.RunPrepared` claim, establish the scope with the
|
|
||||||
retained duration, before the retained observer's start delivery, credential
|
|
||||||
revalidation, and admission. Defer payload and scope cleanup before callback
|
|
||||||
work. A failed claim neither starts notification nor changes existing silent
|
|
||||||
invalid-handle behavior.
|
|
||||||
4. Pass the child through execution and finalize the returned error with the
|
|
||||||
same helper before cleanup and facade terminal classification. Keep this
|
|
||||||
lifecycle in the internal prepared runner rather than borrowing duration or
|
|
||||||
callback state from an unclaimed handle in the facade.
|
|
||||||
5. `RunPrepared`'s facade projects the resulting error and emits its one existing
|
|
||||||
terminal event after resource release. Do not reapply the timer at the facade
|
|
||||||
or retain the preparation context. Namespace views keep their shared-owner
|
|
||||||
behavior and use the handle's original selections.
|
|
||||||
|
|
||||||
Validation: extend prepared-execution coverage to show that preparation and an
|
|
||||||
idle delay longer than the selected duration do not consume its execution
|
|
||||||
budget; later execution does. Reassignment of the original request does not
|
|
||||||
change the retained duration/callback. Cover earlier caller deadlines and a
|
|
||||||
shared caller deadline across preparation and execution. Existing claim-race,
|
|
||||||
discard, foreign-owner, credential, and error-identity tests remain applicable.
|
|
||||||
Notification invocation itself is completed in Stage 4.
|
|
||||||
|
|
||||||
## Stage 4: Notify From The Actual Shared Prepared Snapshot
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: ordinary and prepared execution expose one detached logical request
|
|
||||||
before first generation, without repeating preparation.
|
|
||||||
|
|
||||||
1. Thread the internal notification from `Runner.Run` and the claimed payload
|
|
||||||
into the existing shared `executePreparedRun` entry. At that entry, preparation
|
|
||||||
is complete and logical admission is held on both paths.
|
|
||||||
2. When selected, check the operation context, invoke the internal adapter with
|
|
||||||
the actual retained prepared state, and check context again before entering
|
|
||||||
generation. A context failure at this boundary follows the existing
|
|
||||||
generation operation-error wrapping, preserving context identity and gaining
|
|
||||||
local-timeout identity only through the scope finalizer.
|
|
||||||
3. Invoke once per executing logical request, not per transport retry or repair.
|
|
||||||
Do not call `Prepare`, `Details`, artifact readers, renderers, or schema
|
|
||||||
preparation again to produce the notification. With nil `OnPrepared`, avoid
|
|
||||||
constructing a public details copy.
|
|
||||||
4. Keep the prepared state's API key redacted. Generation still receives its
|
|
||||||
private direct credential through the existing separate path. Preserve the
|
|
||||||
complete assembled messages, schema, settings, input hashes, session,
|
|
||||||
ancestry, and preparation metadata in the delivered public value.
|
|
||||||
5. Leave logical admission held; do not release/reacquire it around notification.
|
|
||||||
Invoke application code without holding the handle mutex or a capacity
|
|
||||||
manager lock. Preserve panic propagation while defers release the lease,
|
|
||||||
timer, and claimed payload. A panic does not make a handle reusable.
|
|
||||||
|
|
||||||
Validation: one ordinary and one split public test establish ordering before
|
|
||||||
generation and exact callback selection. Add focused context-before/after
|
|
||||||
notification tests and an internal cleanup regression if the public capacity
|
|
||||||
probe alone cannot demonstrate payload cleanup. More extensive ownership and
|
|
||||||
failure assertions belong to Stage 6, not duplicate tests here.
|
|
||||||
|
|
||||||
## Stage 5: Verify Continuous Budgets Across Execution Phases
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: tests demonstrate that one scope reaches all relevant collaborators,
|
|
||||||
with correct attribution and observation on failure.
|
|
||||||
|
|
||||||
1. Add focused tests for preparation expiry through a context-aware injected
|
|
||||||
artifact reader, generation-capacity waiting on a real limited backend,
|
|
||||||
interrupted built-in retry backoff, and structural repair expiry. Verify
|
|
||||||
standard context matching, local marker, and retained phase identity where
|
|
||||||
that phase already supplies one. Cover ordinary and split paths without
|
|
||||||
mechanically duplicating every case on both.
|
|
||||||
2. Use a narrow internal runner test for validation-phase expiry, since validation
|
|
||||||
collaborators are not a public injection API. Check the same deadline reaches
|
|
||||||
preparation, validation, and generation; do not add a new public testing seam.
|
|
||||||
3. Test that notification time consumes the same budget and that expiry there
|
|
||||||
prevents generation. Cover an earlier parent deadline and parent cancellation
|
|
||||||
separately from a provider's own deadline. Preserve original injected error
|
|
||||||
identities and do not relabel a non-context error after timer expiry.
|
|
||||||
4. On both ordinary and split public execution, exercise a terminal observer
|
|
||||||
that outlasts the operation budget after successful completion. The result
|
|
||||||
stays successful and the terminal remains successful. Include the timeout
|
|
||||||
failure case to ensure public error mapping happens before terminal delivery.
|
|
||||||
5. After expiry, prove capacity remains usable and the caller parent stays
|
|
||||||
active. Respect the current capacity model: logical admission may reject
|
|
||||||
immediately, while admitted work can wait for an active generation permit.
|
|
||||||
Do not introduce a new blocking admission queue to satisfy a test label.
|
|
||||||
|
|
||||||
Use channels for ordering and `testing/synctest` for controlled elapsed-time
|
|
||||||
scenarios where its bubble rules apply. This repository's Go minimum supports
|
|
||||||
it. Prefer in-memory fixtures and controlled transports; avoid real short sleeps
|
|
||||||
or close-to-deadline assertions. Reuse the existing generation tests for retry
|
|
||||||
policy rather than building a second retry matrix. There is no production clock
|
|
||||||
framework, live provider probe, allocation threshold, or performance gate here.
|
|
||||||
|
|
||||||
Validation: run focused use-case/generation tests and the new public execution
|
|
||||||
control tests under the race detector. The new cases should protect deadline
|
|
||||||
propagation and classification, not private helper call sequences.
|
|
||||||
|
|
||||||
## Stage 6: Verify Notification Ownership And Failure Lifecycles
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: applications can safely retain diagnostic details without altering
|
|
||||||
execution or acquiring new lifecycle guarantees.
|
|
||||||
|
|
||||||
1. Add a representative continuation request containing history, follow-up
|
|
||||||
messages, appended cache-control metadata, input hashes, session, settings
|
|
||||||
with nested provider values, and a structured schema. Inside `OnPrepared`,
|
|
||||||
retain and mutate the delivered mutable values; the model request, captured
|
|
||||||
exchange, and later prepared-handle `Details()` remain unchanged. Use
|
|
||||||
synthetic direct/environment credentials and verify their values are absent
|
|
||||||
from diagnostic details while the existing client credential path still works.
|
|
||||||
2. Demonstrate snapshot fidelity when mutable input/schema sources change after
|
|
||||||
preparation and before execution. Reuse existing frozen-preparation fixtures;
|
|
||||||
notification must describe the executed snapshot, not reread the changed
|
|
||||||
sources. A later provider failure or cancellation may return no result, while
|
|
||||||
the application still retains the delivered details.
|
|
||||||
3. Verify absence of notification for preparation failure and ordinary admission
|
|
||||||
rejection, without requiring extra reads to produce diagnostics. For split
|
|
||||||
execution cover invalid/foreign/discarded/reused handles and pre-notification
|
|
||||||
cancellation. `Details()`, `Prepare`, `ValidateRequest`, and preparation of an
|
|
||||||
executable handle never notify or start this execution timer.
|
|
||||||
4. Verify that retries and structural repair do not repeat notification. Reuse
|
|
||||||
an existing retry-plus-repair integration scenario with an added notification
|
|
||||||
assertion rather than duplicating its full event/usage test elsewhere.
|
|
||||||
5. Recover a notification panic only in test code, then verify ordinary capacity
|
|
||||||
is reusable and a claimed handle stays consumed. Do not require a terminal
|
|
||||||
event after panic or impose a prohibition on callback reentrancy. A capacity
|
|
||||||
one probe documents held admission rather than promising nested success.
|
|
||||||
|
|
||||||
Validation: run affected public contract and private payload-cleanup tests under
|
|
||||||
the race detector. Mutable callback state in concurrent tests must be protected
|
|
||||||
by the test; do not make PromptKit serialize application callbacks globally.
|
|
||||||
|
|
||||||
## Stage 7: Verify Coordinated Turns And Observer Composition
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: coordination obtains the controls through ordinary `Run`, retaining
|
|
||||||
its existing branching and delivery semantics.
|
|
||||||
|
|
||||||
1. Check the coordinator's existing request-value copy preserves both new
|
|
||||||
controls while it replaces `ContinueFrom` and composes observers. No separate
|
|
||||||
coordinator timeout, executor, or public prepare/run sequence is needed.
|
|
||||||
2. Add a controlled-time, two-continuation success case. Each turn finishes
|
|
||||||
within its own timeout while their combined execution exceeds one turn's
|
|
||||||
duration. Callback details contain each turn's assembled history; no timer
|
|
||||||
from an earlier turn controls a later turn.
|
|
||||||
3. In the next-turn callback, verify the parent context is active and the prior
|
|
||||||
child context has been cleaned up. Run an explicitly selected assessment on
|
|
||||||
the same backend with concurrency one and queue capacity zero, using its own
|
|
||||||
timeout. This differs from `OnPrepared`, where admission is still held.
|
|
||||||
4. Exercise a locally timed-out continuation: coordination returns its ordinary
|
|
||||||
operational error with the marker, does not fabricate an outcome or completed
|
|
||||||
exchange, and leaves the parent and a sibling continuation usable. Retained
|
|
||||||
details are available if notification occurred before failure. Do not promise
|
|
||||||
them if execution stopped earlier.
|
|
||||||
5. Compose request and coordinator observers with an explicit execution group.
|
|
||||||
Check one ordinary lifecycle per selected run, normal terminal usage/attempt
|
|
||||||
totals, and no implicit membership for assessment calls. Reuse existing
|
|
||||||
final-turn and parent-cancellation/undelivered-result cases to verify that
|
|
||||||
cleanup and slow terminal observation have not changed delivery semantics.
|
|
||||||
|
|
||||||
Validation: run the coordinator, observation, group, and new execution-control
|
|
||||||
contract cases together under the race detector. Keep tests at the public
|
|
||||||
boundary for the assembled behavior; the internal coordinator loop need not
|
|
||||||
be redesigned solely because its ordinary run gained options.
|
|
||||||
|
|
||||||
## Stage 8: Document, Demonstrate, And Validate The Assembled Feature
|
|
||||||
|
|
||||||
Status: complete.
|
|
||||||
|
|
||||||
Outcome: the implementation and its supported consumer workflow are complete,
|
|
||||||
with documentation in the canonical owners.
|
|
||||||
|
|
||||||
1. Finish GoDoc on `RunRequest`, `ErrOperationTimeout`, `Run`, `Prepare`,
|
|
||||||
`ValidateRequest`, `PrepareExecution`, `RunPrepared`, and `PreparedExecution`.
|
|
||||||
Cross-reference the owning field/error contract rather than duplicating its
|
|
||||||
entire definition. Explain conditional notification, held admission,
|
|
||||||
cooperative cancellation, split preparation, callback ownership, and outcome
|
|
||||||
finalization before terminal observation.
|
|
||||||
2. Update the [consumer guide](../consumers/pkg-promptkit.md) with small ordinary,
|
|
||||||
coordinated, and split usage sketches linked to GoDoc. Show a caller-owned
|
|
||||||
retained `PreparedRun` on failure, `errors.Is` checks for both timeout
|
|
||||||
identities, and a separate budget for callback-owned assessment. Do not add
|
|
||||||
persistence, log destinations, redaction policy, or a mandatory diagnostic
|
|
||||||
write gate.
|
|
||||||
3. Extend the maintained [observation example](../../examples/go-library/observe/main.go)
|
|
||||||
and its semantic test with a positive operation budget on continuation,
|
|
||||||
selected prepared-details retention, and a separately budgeted next-turn
|
|
||||||
assessment. Keep it offline, synthetic, and successful; Stage 5/6 tests own
|
|
||||||
failure demonstrations. Do not add another standalone example framework.
|
|
||||||
4. Update [runner documentation](../internal/runner.md),
|
|
||||||
[observation documentation](../internal/observation.md), and the
|
|
||||||
[component inventory](../internal/overview.md) only where responsibilities or
|
|
||||||
lifecycle descriptions changed. No ConfigKit, collection-format, provider
|
|
||||||
payload, or architectural policy change is required by this work.
|
|
||||||
5. Review Audita's six acceptance scenarios and the feature roadmap's validation
|
|
||||||
targets against the completed tests. Consolidate duplicate tests; do not
|
|
||||||
expand this into a full cross-product of all entry points, phases, observers,
|
|
||||||
and callback behaviors. Retain existing no-option regression coverage.
|
|
||||||
6. Select the newest installed Go toolchain per the development guide. Format
|
|
||||||
changed Go files, run `go test -race ./...` and `go vet ./...` with
|
|
||||||
`GOTOOLCHAIN=local` and `GOWORK=off`, and run `git diff --check`. The full Go
|
|
||||||
suite includes the maintained examples; no second example execution gate is
|
|
||||||
needed. Use writable caches as required by the development environment.
|
|
||||||
Validate local links and inspect the full diff for unintended files/secrets.
|
|
||||||
|
|
||||||
Do not edit published v0.22.0 release notes, create a new release/tag, or require
|
|
||||||
CI or external publication to finish the sprint. Release preparation and
|
|
||||||
retirement of these roadmaps are subsequent work.
|
|
||||||
|
|
||||||
## Completion Criteria
|
|
||||||
|
|
||||||
- Ordinary and coordinated runs apply one optional whole-operation budget;
|
|
||||||
split handles retain duration and callback selection without live idle timers.
|
|
||||||
- Deadline attribution survives public wrapping, distinguishes this scope's
|
|
||||||
recorded timer cause, and agrees with terminal observation before cleanup.
|
|
||||||
- Notification supplies a detached redacted view of the actual logical prepared
|
|
||||||
request, once before generation when reached, without repeated preparation.
|
|
||||||
- Failure, cancellation, and panic paths preserve existing resource, handle,
|
|
||||||
error, observation, grouping, and continuation behavior.
|
|
||||||
- The maintained example, canonical documentation, focused tests, full race
|
|
||||||
suite, and vet are complete. No-option use stays compatible.
|
|
||||||
|
|
||||||
No significant open questions remain. The API and nonpositive-duration choices
|
|
||||||
above complete the planning decisions left by the accepted feature roadmap.
|
|
||||||
@@ -1,72 +0,0 @@
|
|||||||
# Execution Controls Review
|
|
||||||
|
|
||||||
Reviewed implementation stages 1–8 against commit `57b62d3`, the
|
|
||||||
[implementation plan](implementation.md), the accepted
|
|
||||||
[feature roadmap](execution-controls.md), and the applicable architecture,
|
|
||||||
testing, documentation, and agent policies.
|
|
||||||
|
|
||||||
## 1. Complete The Public Prepared-Notification Contract
|
|
||||||
|
|
||||||
Priority: P3. Status: complete. Owning stage: Stage 8.
|
|
||||||
|
|
||||||
Location: [RunRequest.OnPrepared GoDoc](../../types.go#L97).
|
|
||||||
|
|
||||||
The public GoDoc describes synchronous delivery, detached ownership, held
|
|
||||||
admission, and split preparation, but omits two explicitly selected lifecycle
|
|
||||||
facts:
|
|
||||||
|
|
||||||
- Notification occurs at most once per logical execution, when execution
|
|
||||||
reaches that point before the first generation. Transient retries and
|
|
||||||
structural repair do not repeat it.
|
|
||||||
- The callback receives the operation context, including the selected operation
|
|
||||||
deadline when enabled and inherited parent cancellation. In coordination this
|
|
||||||
is distinct from the parent context delivered to the next-turn callback.
|
|
||||||
|
|
||||||
These facts are already implemented by the
|
|
||||||
[shared execution boundary](../../internal/usecase/runner.go#L186) and covered
|
|
||||||
by the notification, retry/repair, and coordinator contract tests. They are also
|
|
||||||
expressly selected in the roadmap's
|
|
||||||
[accepted callback decision](execution-controls.md#3-what-is-the-prepared-details-callback-contract).
|
|
||||||
However, Go declarations and GoDoc own the exact public API contract; consumers
|
|
||||||
should not need a temporary roadmap or implementation inspection to discover
|
|
||||||
invocation cardinality or the scope of their callback's context.
|
|
||||||
|
|
||||||
Required remediation: add these two facts to the field's GoDoc. Preserve
|
|
||||||
conditional delivery and cooperative cancellation; do not promise notification
|
|
||||||
for every failed request, forced callback interruption, or terminal observation
|
|
||||||
after panic. This is a documentation completion, not a runtime change. Existing
|
|
||||||
behavioral tests already cover these semantics; duplicate tests are unnecessary.
|
|
||||||
|
|
||||||
Completion: expanded the field's GoDoc to state invocation cardinality,
|
|
||||||
non-repetition during retry/repair, and operation-context scope, including the
|
|
||||||
distinction from the coordinator's next-turn callback context. Runtime behavior
|
|
||||||
is unchanged. GoDoc rendering and the existing focused race-enabled notification,
|
|
||||||
retry/repair, and coordinated-budget tests passed.
|
|
||||||
|
|
||||||
## Stage Review Summary
|
|
||||||
|
|
||||||
| Stage | Result |
|
|
||||||
| --- | --- |
|
|
||||||
| 1 — API and conversion | Selected fields and sentinel are present; callback conversion captures the chosen function and detaches details only when selected. |
|
|
||||||
| 2 — Ordinary timeout | One internal scope covers ordinary execution; per-invocation cause attribution and public error projection precede terminal observation. |
|
|
||||||
| 3 — Split preparation | Handles retain duration and callback without an idle timer; claim/discard and cleanup behavior are preserved. |
|
|
||||||
| 4 — Prepared notification | Both execution paths use the actual shared snapshot, with context checks and held admission; retries and repair do not notify again. |
|
|
||||||
| 5 — Phase budgets | Tests cover preparation, capacity waiting, retry backoff, generation/repair, validation, notification time, and stable terminal outcomes. |
|
|
||||||
| 6 — Ownership and failures | Public tests cover detached messages, cache metadata, nested parameters, schema, credentials, frozen sources, retained diagnostics, and panic cleanup. |
|
|
||||||
| 7 — Coordination | Fresh turn budgets, parent-context assessment, released capacity, sibling use, observer composition, and explicit grouping are covered. |
|
|
||||||
| 8 — Documentation and example | Maintained example, consumer/internal documentation, and the completed canonical GoDoc reflect the feature; finding 1 is resolved. |
|
|
||||||
|
|
||||||
No runtime correctness defect, additional architectural gap, or inadvertently
|
|
||||||
strengthened caller restriction or guarantee was identified in this review.
|
|
||||||
|
|
||||||
## Validation
|
|
||||||
|
|
||||||
- The complete package suite passed under `go test -race ./...` when combining
|
|
||||||
the initial run with successful reruns of `internal/configuration` and
|
|
||||||
`internal/llm`. Those two packages initially failed solely because the sandbox
|
|
||||||
disallowed their local `httptest` listeners; their reruns permitted listeners.
|
|
||||||
- `go vet ./...` passed using Go 1.27.3 with `GOTOOLCHAIN=local`, `GOWORK=off`,
|
|
||||||
and offline module resolution.
|
|
||||||
- Changed Go files are formatted. `git diff --check` and local document-target
|
|
||||||
checks passed. No implementation, dependency, policy, or release files were
|
|
||||||
changed during the review.
|
|
||||||