# Dependency upgrade and PromptKit smoke review remediation
Status: in progress; R-1 through R-3 complete; R-4 remains open.
Status: complete; R-1 through R-4 addressed.
## Review scope and evidence
@@ -177,7 +177,7 @@ resolution. Production code is unchanged.
## R-4: Reconcile the feature roadmap with completed implementation
Status: open. Priority: P3. Category: stale implementation status.
Status: complete. Priority: P3. Category: stale implementation status.
**Location:** [upgrades.md](upgrades.md), status at lines 3–6,
current-implementation descriptions at lines 28–29 and 41–44, and the source
@@ -203,3 +203,11 @@ remediations remain open.
**Completion evidence:** The roadmap and implementation plan agree on delivery
status, current-code claims match the inspected implementation, and local
links/Markdown whitespace checks pass. No code or policy change is required.
**Completed:** 2026-10-18. Recorded implementation completion and linked the
completed plan, review follow-up, and current CLI/consumer/GoDoc owners. Marked
the original dependency/capability descriptions as historical and corrected the
source-report and ID-only API descriptions to match delivered code. Preserved
the original baseline and accepted decisions unchanged. Local links/fragments,
inbound roadmap anchors, status/baseline consistency, and Markdown whitespace
checks passed. No code or policy change was needed for this issue.