Record completed configuration outcome remediation

This commit is contained in:
2026-11-16 19:03:21 +00:00
parent 21dac4f89e
commit 735b35a0a1
2 changed files with 30 additions and 22 deletions

View File

@@ -1,6 +1,6 @@
# Configuration outcome review remediation
Status — R1 complete, R2 open. Findings from the stage-by-stage review of
Status — R1 and R2 complete. Findings from the stage-by-stage review of
[the implementation plan](implementation.md) at commit
`8a22dd6`. Review findings concern the accepted
[feature target](invalid-configuration-outcomes.md).
@@ -79,13 +79,19 @@ adaptation of supplied error evidence.
## R2 — Reconcile feature-roadmap status and baseline wording
Priority — P3. Status — open. Affects Stage 5 documentation consistency.
Priority — P3. Status — complete. Affects Stage 5 documentation consistency.
The [feature roadmap](invalid-configuration-outcomes.md) still says
"pending implementation" at its opening. Its baseline section also describes
the current CLI contract as assigning loading failures status `1` and presents
the status change as proposed. Meanwhile, the implementation plan records all
stages complete, and the current
Completed by marking the feature as implemented with review remediation complete,
linking the release handoff, and labeling the old status behavior and failure
helpers as historical baseline evidence. Verified the document against the
implemented classifier, current CLI contract, and pending release coordination.
Local Markdown links/fragments and whitespace checks passed.
At review time, the [feature roadmap](invalid-configuration-outcomes.md) said
"pending implementation" at its opening. Its baseline section also described
the current CLI contract as assigning loading failures status `1` and presented
the status change as proposed. Meanwhile, the implementation plan recorded all
stages complete, and the
[CLI reference](../cli.md#configuration-failure-classification) documents the
implemented status `2` classification and operational fallback.