# Audit remediation roadmap
|
||||
|
||||
Status: target and decisions finalized; the [implementation plan](implementation.md)
|
||||
defines the sprint. No remediation is implemented by these documents.
|
||||
Status: source remediation complete; the [implementation plan](implementation.md)
|
||||
records the sprint and verification. Release and dependency alignment remain
|
||||
separate work in [future work](future.md#pending-release-and-integration-work).
|
||||
|
||||
Baseline: `d131999c7c474010a4814bb81601cd32920e6c83`. The
|
||||
[catalog](audit/catalog.md) contains 27 distinct open findings, five P2 and 22 P3,
|
||||
[catalog](audit/catalog.md) records 27 distinct findings, five P2 and 22 P3,
|
||||
from seven audits. Its accepted decisions and the
|
||||
[remediation analysis](audit/remediation-analysis.md) supply the scope and
|
||||
rationale for this roadmap. The implementation is unchanged since the audited
|
||||
state `db732e3a1de55c844f77870e1c6db683c2685d5d`; subsequent commits recorded
|
||||
the review and decisions.
|
||||
rationale for this roadmap. The audited state was
|
||||
`db732e3a1de55c844f77870e1c6db683c2685d5d`.
|
||||
|
||||
This roadmap owns the target, scope, and completion criteria. The implementation
|
||||
plan owns ordered stages, dependencies, concrete changes, and verification steps.
|
||||
@@ -251,22 +251,22 @@ removes migration work, not the need for coherent module requirements.
|
||||
|
||||
## Completion criteria
|
||||
|
||||
- [ ] Every finding F01–F27 has its selected remediation implemented and recorded
|
||||
- [x] Every finding F01–F27 has its selected remediation implemented and recorded
|
||||
with relevant evidence; related findings remain individually accountable.
|
||||
- [ ] The five P2 defects have focused behavioral protection, including error
|
||||
- [x] The five P2 defects have focused behavioral protection, including error
|
||||
identity, retained evidence, and the deferred acceptance boundary.
|
||||
- [ ] F06 and F08's maintained consumers work, with actual completion checks
|
||||
- [x] F06 and F08's maintained consumers work, with actual completion checks
|
||||
distinguished from unavailable or skipped shell checks.
|
||||
- [ ] F11 and F21's selected API changes and F09/F10's clarified contracts are
|
||||
- [x] F11 and F21's selected API changes and F09/F10's clarified contracts are
|
||||
reflected in canonical GoDoc and affected integration guidance.
|
||||
- [ ] Obsolete production wrappers/plumbing and duplicate adaptation/bookkeeping
|
||||
- [x] Obsolete production wrappers/plumbing and duplicate adaptation/bookkeeping
|
||||
are removed at the agreed boundaries, with useful tests retained.
|
||||
- [ ] F13–F15 and F22 remove the identified repeated work while preserving
|
||||
- [x] F13–F15 and F22 remove the identified repeated work while preserving
|
||||
behavior, without a new performance guarantee or measurement prerequisite.
|
||||
- [ ] F17–F20 improve responsibility separation within their bounded scope;
|
||||
- [x] F17–F20 improve responsibility separation within their bounded scope;
|
||||
public behavior and necessary ordering remain protected.
|
||||
- [ ] Documentation corrections F25–F27 are complete and local links resolve.
|
||||
- [ ] Relevant module and aligned-workspace results are recorded. Independent
|
||||
- [x] Documentation corrections F25–F27 are complete and local links resolve.
|
||||
- [x] Relevant module and aligned-workspace results are recorded. Independent
|
||||
results identify the exact dependency selection; any release-alignment work
|
||||
still pending is explicitly distinguished from completed source work.
|
||||
|
||||
|
||||